Question_Set__6_Responses.pdf

PDF 79 KB Posted

Attached to
Aerial Delivery Pallet Handling System Federal contract opportunity
Solicitation number
FA860419R8119
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

FA860419R8119 Question Set #6 and Responses

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Delivery Pallet Handling System, newest first.
File Type Posted
FA860419R8119_0001_RFP.pdf PDF
Question_Set__7.pdf PDF
Question_Set__5_Responses.pdf PDF
Question_Set__4_Responses.pdf PDF
Question_Set__2_&__3_Responses.pdf PDF
Question_Set__1_and_Responses.pdf PDF
NBR816-01.dwg DWG drawing
FA860419R8119_RFP.pdf PDF
Corrected_FAR_Clauses.pdf PDF
Proposal_Checklist-Pricing_Summary_Sheet_(R1).pdf PDF
NBR816-01.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Answers in Red.

FA860419R8119 - Bradley Question Set #6

A, Please reference Attachment #2, Page 10 of 16, Section 3.2.2.1 as provided below.

1, Can you please advise if the supplier is just to mount the Ground Fault Interrupters (GFI) on the mechanical platform decking or if the supplier is also to do the electrical wiring of the GFIs to the power source?

Supplier is responsible for the electrical wiring.

2, With respect to the GFI locations, it would be very beneficial and less costly if the locations of the GFI can be determined prior to the start manufacturing and the field install.

Will be dompleted during the shop drawing process.

3, Can the locations of the GFIs be provided? No

B, One other question, with respect to the Attachment #1, Page 32 of 41, Section 4.2.2

Reliability Demonstration Test, 1, During the Reliability Demonstration Test period, if a performance issue arises during the Test

Period, what is the expected response time from the vendor?

No response time specified, because it is anticipated the Government will repair any failures.

The supplier will replace spares used for the repair.