Question_Set__5_Responses.pdf
PDF 239 KB Posted
- Attached to
- Aerial Delivery Pallet Handling System Federal contract opportunity
- Solicitation number
- FA860419R8119
About this file
FA860419R8119 Question Set #
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA860419R8119_0001_RFP.pdf | ||
| Question_Set__7.pdf | ||
| Question_Set__6_Responses.pdf | ||
| Question_Set__4_Responses.pdf | ||
| Question_Set__2_&__3_Responses.pdf | ||
| Question_Set__1_and_Responses.pdf | ||
| NBR816-01.dwg | DWG drawing | |
| FA860419R8119_RFP.pdf | ||
| Corrected_FAR_Clauses.pdf | ||
| NBR816-01.pdf | ||
| Proposal_Checklist-Pricing_Summary_Sheet_(R1).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Answers in Red
FA860419R8119 Question Set # 5
1, In the drawing it appears there are (4) “I” beams just inside the bldg. My assumption would be that they are building columns which the front of the platform would need to be designed around. However the drawing shows bar grating covering them. Would you confirm what the significance of these “I” beams is?
You are correct, they are building columns. The platform framing needs to be designed to work around the Building columns or the decking cantilevered.
2, Attachment #3 - 3.2.2.2. – calls out the req. for spacer stops, but does not provide the qty.
required – please advise.
The quantity required is 3. Requirement is indicated in paragraph 3.2.2.