Osan_-_Question_Set_3V2.pdf

PDF 72 KB Posted

Attached to
MMHS Mechanized Material Handling System Osan Air Base, Republic of Korea
Solicitation number
FA8604-19-R-8108
Issued by

View the file

Other files

File Type Posted
Osan_-_Question_Set_6.pdf PDF
19R81080003.pdf PDF
19R81080002.pdf PDF
Osan_-_Question_Set_5.pdf PDF
Osan_-_Question_Set_4.pdf PDF
Osan_-_Question_Set_2.pdf PDF
BOS613-01_(REV_A).dwg DWG drawing
Osan_-_Question_Set_1.docx DOCX document
19R81080001.pdf PDF
BOS613-01.dwg DWG drawing
19R8108.pdf PDF
Proposal_Checklist.Pricing_Summary_Sheet.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMHS Osan Questions and Answers

FA8604-19-R-8108

Set 3 04/01/2019

Q1. In an earlier response to a question, What is the duty cycle of the Pallet Lifts?”

The answer provided was “15 – 20 cycles per day”

Is that is an 8 hour shift, or, in a full 24-hour day?

16 Hours/Day

Q2. Reference Attachment # 2 – Page 11 of 33 – Section 3.2.8.5.1.5. CYLINDERS

“The surface finish on piston rods and cylinder bore shall be from 0.12 to 0.38 micrometers.”

Would a 0.40 micrometer finish be acceptable? No

Q3. Reference Attachment #2 – Page 12 of 33 – Section 3.2.8.5.1.9. RESERVOIRS

“Access shall be provided thru bolt-on gasketed top and end covers.”

Would a top cover access only be acceptable? Yes