Osan_-_Question_Set_1.docx

DOCX document 18 KB Posted

Attached to
MMHS Mechanized Material Handling System Osan Air Base, Republic of Korea
Solicitation number
FA8604-19-R-8108
Issued by

About this file

Response to Questions Set 1

View the file

Other files

File Type Posted
Osan_-_Question_Set_6.pdf PDF
19R81080003.pdf PDF
19R81080002.pdf PDF
Osan_-_Question_Set_5.pdf PDF
Osan_-_Question_Set_4.pdf PDF
Osan_-_Question_Set_3V2.pdf PDF
Osan_-_Question_Set_2.pdf PDF
BOS613-01_(REV_A).dwg DWG drawing
19R81080001.pdf PDF
BOS613-01.dwg DWG drawing
19R8108.pdf PDF
Proposal_Checklist.Pricing_Summary_Sheet.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MMHS Osan Questions and Answers

FA8604-19-R-8108

Set 1 03/26/2019

Q1: “I am not seeing what the available power supply is in the bldg. the install will occur – Would you please provide what is available and preferred voltage for the lifts” A1: The following information is provided in the Contractor Information attachment:

"There are standards for voltages on base (in general): 3 phase 480v/277v and 2 phase 208v/120v at 60Hz. Per CE, 'if user wants to install the 3 phase, 60Hz, 208V equipment in the 3 phase, 480V facility, they need step down transformer (dry type) 3 phase 480V to 3 phase 208V inside of building'" The customer has confirmed that both 3 phase 480v/227v and 2 phase 208v/120v at 60 Hz will be available in the facility.

Q2: “May I assume that all the (red) rack sections drawn on BOS613-01 are configured the same as the drawing on page 7 of attachment 5? (Even though none are not drawn the same)” A2: Correct. Red rack sections on AF Drawing BOS613-01 (Attachment 6) are representative of the locations. The racks shall be configured as specified in Attachment 5.

Q3: “RE: 3.2.9. Attachment 5 – I am not seeing any forklift guard posts on BOS613-01” A3: I have revised AF Drawing BOS613-01 (Attachment 6) to show these forklift guard posts.

Q4: BOS613-01 appears to show a raised platform under the (3) 65’ 11” 463L conveyor lanes. May I assume this is existing? If so – would you please provide details as to the flooring – as well as the framing structure that will be supporting the conveyor runs,” A4: This is a concrete dock that is being installed as part of the building construction.

Q5: “1.2. of attachment 5 calls out 4 x 4 treated hardwood dunnage “or other suitable material as approved by COTR. 3.2.6. of attachment 5 specifies Black Rhino part # SG-4x4-BL96 “or equivalent”. There is a huge difference in both material & price between the poly dunnage & the treated hardwood dunnage. Please clarify which will be accepted.”

A5: Attachment 5 has been revised to update the definition provided in paragraph 1.2. The dunnage shall be provided as specified in paragraph 3.2.6. of Attachment 5.