About this file

RFP FA8604-19-R-8108 0001

View the file

Other files

File Type Posted
Osan_-_Question_Set_6.pdf PDF
19R81080003.pdf PDF
19R81080002.pdf PDF
Osan_-_Question_Set_5.pdf PDF
Osan_-_Question_Set_4.pdf PDF
Osan_-_Question_Set_3V2.pdf PDF
Osan_-_Question_Set_2.pdf PDF
BOS613-01_(REV_A).dwg DWG drawing
Osan_-_Question_Set_1.docx DOCX document
BOS613-01.dwg DWG drawing
19R8108.pdf PDF
Proposal_Checklist.Pricing_Summary_Sheet.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFLCMC/PZIEB CODE FA8604 7. ADMINISTERED BY (If other than Item 6) CODE

USAF/AFMC/AFLCMC

AF LIFE CYCLE MANAGEMENT CENTER

2275 D STREET, BLDG 16, RM 128

WRIGHT-PATTERSON AFB OH 45433-7228

ZACHARY P. REYNOLDS 937-656-7381

ZACHARY.REYNOLDS@US.AF.MIL

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA860419R8108000

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Non-ACAT, MMHS,Osan AB Storage Aids Sys, Incorporate Revised Appendix D, (REV 1), dated 27 March 2019, Drawing BOS613-01 (REV A), and Response to Questions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 7.1.2.2 FAR (48 CFR) 53.243 Created 27 Mar 2019 2:20 PM

CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS

FA860419R81080001 PAGE 2 OF 3

1. This amendment hereby incorporates Section J, Appendix D, (REV 1), dated 27 March 2019, Drawing BOS613-01 (REV A) dated 27 March 2019, and Response to Questions.

2. All other terms and conditions remain the same.

SCHEDULE

FA860419R81080001

DOCUMENT PGS DATE TITLE

ATTACHMENT 5 16 27 MAR 2019 APPENDIX D: PALLET RACK REV 1

ATTACHMENT 6 1 27 MAR 2019 DRAWING BOS613-01 REV A

APPENDIX D

FOR

463L PALLET RACK

AT

OSAN AIR BASE, REPUBLIC OF KOREA

BUILDING NO. TBD

CSN: BOS613

DATE: 18 JANUARY 2019

REVISION 1: 27 MARCH 2019

PREPARED BY:

Megan Blackwell

MEGAN BLACKWELL

REVIEWER

AFLCMC/EZPAE

Ronald Parsons

RONALD PARSONS

PROJECT ENGINEER

AFLCMC/EZPAE

FA8604-19-R-8108 Attachment 5 Page 1 of 16

THIS PAGE LEFT BLANK INTENTIONALLY

FA8604-19-R-8108 Attachment 5 Page 2 of 16

Osan AB – App D – Page i

Table of Contents

1. SCOPE

1.1. GENERAL SCOPE

1.2. DEFINITIONS

2. APPLICABLE DOCUMENTS

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

3.2. PHYSICAL AND PERFORMANCE CHARACTERISTICS

3.2.1. CONFIGURATION REQUIREMENTS

3.2.2. UPRIGHT FRAMES

3.2.2.1. COLUMNS

3.2.2.2. BEARING PLATES

3.2.2.3. DIAGONAL/HORIZONTAL BRACING

3.2.3. SHELF BEAMS

3.2.3.1. CONNECTORS

3.2.3.2. SHELF BEAM-TO-COLUMN SAFETY LOCK

3.2.4. FLUE SPACERS

3.2.5. LEVELING SHIMS

3.2.6. DUNNAGE

3.2.7. ANCHORING THE STRUCTURE

3.2.8. ASSEMBLY

3.2.9. FORKLIFT GUARD POSTS

3.2.10. CAPACITY MARKINGS

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

4.2. TESTS

4.3. EQUIPMENT CERTIFICATIONS

FA8604-19-R-8108 Attachment 5 Page 3 of 16

THIS PAGE LEFT BLANK INTENTIONALLY

FA8604-19-R-8108 Attachment 5 Page 4 of 16

Osan AB – App D - Page 1

1. SCOPE

1.1. GENERAL SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for 463L pallet rack for the 731st Air Mobility Squadron (AMS) in the new Air

Freight Terminal (AFT) at Osan Air Base (AB), Republic of Korea

(ROK). The work shall be completed in accordance with this appendix, Air Force (AF) Drawing BOS613-01, and the Cover

Purchase Description (PD). This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

1.2. DEFINITIONS

- 463L pallet rack unit - A unit is an assembly of four upright frames, four shelf beams, four flue spacers, three pieces of dunnage, and the hardware connecting all the components together.

- 463L pallets - The 463L pallet is used to transport air cargo on military aircraft. The 463L pallet consists of an end-grain balsa-wood or redwood core sandwiched between two sheets of aluminum with frames on all sides consisting of extruded aluminum edge rails. Steel tie-down rings are distributed around the perimeter of the pallet to secure nets and to facilitate handling. The entire pallet measures 108 inches wide by 88 inches long by 2.25 inches thick. Cargo on 463L pallets may be stacked up to 114 inches high on a single pallet. The pallet has a rated capacity of 10,000 pounds and weighs approximately 355 pounds. The 463L pallet is normally transferred with the 108-inch edge leading.

- Bay - is the area between two pair of adjacent uprights.

- Dunnage - 4 inch x 4 inch treated hardwood or other suitable material as approved by the Contracting Officer’s Technical

Representative (COTR) support material as specified in 3.2.6.

used to store 463L pallets. Three evenly spaced pieces of dunnage are used to support one 463L pallet. The dunnage shall not interfere with the forklift tines or the storage and/or retrieval of the 463L pallet.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

|R1

FA8604-19-R-8108 Attachment 5 Page 5 of 16

Osan AB – App D - Page 2

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

463L pallet racks will be used to store fully loaded 463L pallets in such a manner to permit placement and removal of any individual load without disturbing any other load. 463L pallet rack shall interface with 10K forklifts. 463L pallet rack shelves shall be capable of supporting a minimum uniformly distributed load of 12,000 pounds. The pallet rack system shall be designed to comply with seismic requirements at Osan AB. The pallet rack shall conform to the requirements of the Rack

Manufacturers Institute (RMI) June 1990 Specification for the

Design, Testing, and Utilization of Industrial Steel Storage

Racks.

3.2. PHYSICAL AND PERFORMANCE CHARACTERISTICS

3.2.1. CONFIGURATION REQUIREMENTS

463L pallet rack shall be capable of being assembled side-by-side, in a row, using common uprights to support the shelf beams. 463L pallet racks shall be configured as shown in Figure

1. The racks shall be separated by a flue for back-to-back rows, as defined in 3.2.4.

3.2.2. UPRIGHT FRAMES

The upright frames shall be of steel, all welded construction consisting of two columns, diagonal and horizontal braces, and floor bearing plates. Each set of upright frame shall be capable of supporting fully loaded bays without permanent deformation. Upright frames shall have a minimum capacity of

10,000 pounds with a safety factor of 1.92 to 1.

3.2.2.1. COLUMNS

The columns shall be a continuous channel, box channel, rectangular, square or other formation approved by the

Contracting Officers Technical Representative (COTR). The columns facing the aisle shall be reinforced using a double post or other means as approved by the COTR. Each column shall have openings to readily accommodate beam connectors, end-to-end, at corresponding heights through the height range of the column openings. The openings at the bottom shall allow for the tops of shelf beams to be installed at six inches above the ground and shall continue upward to the top of the column with maximum

FA8604-19-R-8108 Attachment 5 Page 6 of 16

Osan AB – App D - Page 3

3 inch increments. All openings of each column shall be identical to each other and identical to the openings of all other columns. The position of all corresponding openings of the columns shall not vary more than 3/32 inch as measured from the bottom of the bearing plates. The arrangement of the openings and the fastening devices of the beams shall be such that the tops of the beams are flush, within 3/8 inch, with the top of the column. The width of the column, facing the aisle, shall be a nominal 3 inches.

FA8604-19-R-8108 Attachment 5 Page 7 of 16

Osan AB – App D - Page 4

3.2.2.2. BEARING PLATES

The bottom of each column shall have a load bearing plate securely attached. Each bearing plate shall be sufficiently sized to disperse the maximum load imposed by the column. Each bearing plate shall have a minimum of two punched holes to accept minimum 3/8-inch anchor bolts in accordance with 3.2.7.

3.2.2.3. DIAGONAL/HORIZONTAL BRACING

Horizontal and diagonal braces shall brace the columns. Each end of all braces shall be securely welded to the columns. The braces shall not protrude beyond the sides of the columns or obstruct the attachment of the shelf beams to the columns, at any height on the columns. The centerline of the bottom horizontal brace shall not be located more than 12 inches from the bottom of the upright frame, and the centerline of the top horizontal brace shall be located not farther than 12 inches from the top of the upright frame. Other diagonal and horizontal braces shall be uniformly spaced between the top and bottom horizontal braces.

3.2.3. SHELF BEAMS

Shelf beams shall be the box type. Any openings in the shelf beam construction shall face inward; they shall not face the aisle. The connector shall not be welded to the column. Shelf beam-to-column connection shall be of the locking type. Shelf beams shall provide a bay width of 120 inches and a capacity of

6,000 pounds. When loaded to capacity, shelf beams elastic deformation shall not exceed 0.56 percent of the unsupported span, measured with respect to the two ends of the beam and shall not exhibit permanent deformation. Shelf beams shall be designed with a safety factor of 1.65 to 1.

3.2.3.1. CONNECTORS

Each end of the shelf beams shall have a multiple prong slip-fit or slip-joint type shelf beam-to-column connector. Separate shelf beams and connectors are unacceptable. The connectors shall be adjustable, allowing the shelf beams to be moved with no more than the use of a soft hammer. The connector shall be capable of transferring all loads and external forces of the shelf beam to the column without failure of the connection, or damage to the column or connector. The prongs shall be of

FA8604-19-R-8108 Attachment 5 Page 8 of 16

Osan AB – App D - Page 5 sufficient number, size, and strength to withstand repeated loading and unloading of the rack, and to continually sustain the rated shelf beam load. The prongs shall engage with the openings of the columns in such a manner to prevent lateral rotation of the beam, with each prong contributing to the support of the beam. The prongs shall engage with the openings of the columns to ensure a snug metal-to-metal fit between the horizontal and vertical load carrying members. The prongs shall be of the same design as the opening.

3.2.3.2. SHELF BEAM-TO-COLUMN SAFETY LOCK

Each shelf beam-to-column connection shall have a safety lock, which shall lock the shelf beam to the column. The design and manner of construction of the device shall prevent accidental disengagement of the shelf beam-to-column connection during movement or shifting of the assembled rack unit due to impact to the upright frame or shelf beam from horizontal or vertical directions. The safety-locking device shall be an integral, attached part of the shelf beam. The safety lock shall be employed without the use of tools, and no part thereof shall obstruct or restrict the loading or unloading of the racks.

3.2.4. FLUE SPACERS

Flue spacers shall be capable of joining the backs of two upright frame sections together. Flue spacers installed to create a single bay of 463L pallet rack shall provide a 24-inch flue space. Flue spacers installed for back-to-back bays of

463L pallet rack shall provide a minimum 6-inch flue space.

Each end shall firmly and securely attach to the column and prevent unintentional disengagement. The flue spacer shall be of sufficient size and strength to withstand all forces applied to the connected upright frames during normal loading and unloading operations without deformation or failure. The

Contractor shall supply and install a minimum of two flue spacers for each set of back-to-back uprights. The top flue spacer shall be installed within 12 inches of the top of the frame. The bottom flue spacer shall be installed within 12 inches of the bottom of the frame.

3.2.5. LEVELING SHIMS

Leveling shims shall be provided with the rack units where necessary. The shims shall have holes corresponding to the holes in the bearing plate, and shall anchor or lock with the bearing plate when the rack is erected. Shims shall be equal in width and length to the bearing plate under which it is

FA8604-19-R-8108 Attachment 5 Page 9 of 16

Osan AB – App D - Page 6 installed. Shims shall be of varying thickness so no more than five shims are installed at any point. Slotted shims shall be unacceptable.

3.2.6. DUNNAGE

The contractor shall provide nominal 4-inch by 4-inch by 96-inch dunnage for each top-level 463L pallet location. Dunnage shall be Black Rhino part number SG-4x4-BL96 or equivalent as approved by the COTR. Dunnage is not required at floor level. Dunnage shall be located as shown in Figure 1. Dunnage shall be securely fastened to each beam so that the dunnage does not move forward, backward, or sideways when a 463L pallet is being stored or retrieved from its storage position. Dunnage shall not move when accidentally struck by a forklift tine.

Attachment method for the dunnage shall permit replacement using standard tools. The contractor shall submit proposed fastening method/device to the COTR for approval prior to installation.

3.2.7. ANCHORING THE STRUCTURE

The 463L rack system shall be anchored to resist all design shears and uplift forces. The 463L rack units shall be designed to be a rigid freestanding structure and shall not be connected to any existing building structure except the floor. Each bearing plate shall be securely anchored to the floor with minimum one 3/8-inch diameter anchor bolt. The minimum embedment of the anchor shall be 4 inches.

3.2.8. ASSEMBLY

The assembled 463L pallet rack system shall be rigid, stable, and without deformation or skewing when each bay is loaded to the capacity of the design loads. The 463L pallet rack system shall assemble so that the columns are perpendicular to the beams and parallel to each other. Shelf frames shall be straight and square. All horizontal members shall be level to within 1/8 inch per 10 feet measured over any distance in the rack system.

3.2.9. FORKLIFT GUARD POSTS

Steel pipe forklift guard posts shall be provided at the end of the rows as shown on AF Drawing BOS613-01. The guard posts shall extend a minimum 3 feet above the floor and shall be installed in such a manner that they do not interfere with the normal usage of the pallet rack. A cap shall be installed on the top of the guard post. The guard posts shall not interfere

FA8604-19-R-8108 Attachment 5 Page 10 of 16

Osan AB – App D - Page 7 with the normal movement of the trucks and shall protect the corner upright frame at each aisle entry from an accidental impact with a 10,000-pound capacity forklift. Each forklift guard post shall be anchored to the floor with a minimum of four anchor bolts in accordance with 3.3.2.3 of the Cover PD. The guard post shall be painted safety yellow.

3.2.10. CAPACITY MARKINGS

Load capacity labels or markings shall be displayed on the front shelf beam of each bay. The text stating the capacity shall be easily readable from 5 feet away.

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the

Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Paragraph Description

FA8604-19-R-8108 Attachment 5 Page 11 of 16

Osan AB – App D - Page 8

1. 3.1. and

3.2.3.

Three 463L top-level pallet bays, picked at random, shall each be loaded to full capacity to ensure the pallet beams are set in place.

The loads shall then be removed. The distance from the floor to the bottom of the shelf beam shall be measured and recorded as M1. The loads shall then be put back into the designated pallet bays. The loads shall be left for a minimum of four continuous hours.

The distance from the floor to the bottom of the shelf beam shall be measured again and recorded as M2. The following formula shall be used to determine the deflection amount for

463L pallet rack:

Deflection = [(M1 - M2) / 120] * 100

If the deflection is greater than 0.56 or if permanent deformation exists when the loads are removed, the system shall fail.

2. 3.2.3.2. The shelf-to-column safety lock shall be tested at a minimum of ten random locations.

Personnel shall attempt to separate empty shelf beams from the column without disabling the shelf-to-beam safety lock. If a shelf separates from a column then, the system fails the test.

3. 3.2.6. Dunnage shall be tested to ensure they are fastened properly to each beam. A fully loaded

463L pallet shall be placed onto the dunnage.

The dunnage shall be inspected for any movement. If there is any dunnage movement, the system fails the test.

4.3. EQUIPMENT CERTIFICATIONS

The Contractor shall provide certification that the following requirements have been met. All certifications shall be provided in accordance with the Contract Data Requirements List.

No. Paragraph Certifications

FA8604-19-R-8108 Attachment 5 Page 12 of 16

Osan AB – App D - Page 9

1. 3.1. The pallet rack conforms to the requirements the Rack Manufacturers Institute (RMI) June

1990 Specification for the Design, Testing, and

Utilization of Industrial Steel Storage Racks.

2. 3.2.2. Each 463L-pallet rack upright frame shall have a minimum safe load capacity of 10,000 pounds with a safety factor of at least 1.92 to 1.

3. 3.2.2.2. The bearing plates are of sufficient size to disperse the maximum load imposed on the column.

4. 3.2.3. All shelf beams are designed for, constructed to, and capable of sustaining the minimum safe load with a safety factor of at least 1.65 to

1.

FA8604-19-R-8108 Attachment 5 Page 13 of 16

TECHNICAL PROPOSAL QUESTIONNAIRE

FOR

Osan AB – TPQ for 463L Pallet Rack - Page 1 of 3

463L PALLET RACK

Solicitation Number: FA8604- -R-

Project Title: Mechanized Materials Handling System

Base: Osan AB, ROK CSN: BOS613

Appendix D – 463L Pallet Rack, REV 1: 27 March 2019

The Offeror shall complete this questionnaire. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror’s understanding of the requirements and acceptability of the proposed equipment.

Attach product literature/cut sheets for all equipment detailed in this Purchase Description and attach any exceptions to the

Purchase Description as detailed below.

Pallet Rack Manufacturer: ____________________________________

No. Paragraph Characteristics

1. 3.2.2. Upright Frames: _______ by _______ inches

2. 3.2.2. Minimum capacity of upright frames:

_________ pounds

Safety factor of: ____________________ to 1

3. 3.2.2.1. Width of column facing the aisle: __________ inches

Explain means of column reinforcement:

4. 3.2.2.2. Number of punched holes per bearing plate:

FA8604-19-R-8108 Attachment 5 Page 14 of 16

Osan AB – TPQ for 463L Pallet Rack - Page 2 of 3

5. 3.2.3. Shelf beam length: __________________ inches

Shelf beam capacity: ________________ pounds

Safety factor of: _____________________ to 1

Will shelf deflection meet the requirements as specified?

YES NO

6. 3.2.3.2. Will shelf beam-to-column safety locks be provided as specified?

7. 3.2.4. Number of flue spacers per set of back-to-back uprights: _______

8. 3.2.5. Will leveling shims be provided as specified?

9. 3.2.6. Dunnage size:

Height: _______ inches

Width: _______ inches

Length: _______ inches

10. 3.2.6. Manufacturer and part number of dunnage provided: __________________________________

11. 3.2.7. Diameter of anchors to be provided: ________

Length of anchors to be provided: __________

Number of anchors per bearing plate: _______

12. 3.2.9. Quantity of guard posts provided? __________

13. 3.2.10. Will capacity markings be provided as specified?

FA8604-19-R-8108 Attachment 5 Page 15 of 16

Osan AB – TPQ for 463L Pallet Rack - Page 3 of 3

EXCEPTIONS

Attach any exceptions taken to the Purchase Description

Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.

Are exceptions taken? YES NO

Number of pages attached: ____________________________________

FA8604-19-R-8108 Attachment 5 Page 16 of 16

G

H

F

E

D

C

B

A

H

G

F

E

D

C

B

A

2 3 4 5 6 7

AIR FORCE MATERIEL COMMAND

CC

LOAD CELL

FORKTINE

DEFLECTORS

(TYPICAL)

FIXED PALLET

STOPS (TYPICAL)

MAINTENANCE

PIT DIVIDER

FORKLIFT GUARD

CONVEYOR

UPPER LIFT FRAME

LIFT PLATFORM

LOWER LIFT FRAME

EXISTING

MAINTENANCE

ACCESS COVER

LADDER WITH

EXTENDABLE HANDRAILS

A - A

VIEW A - A

CONTROL

CONSOLE

BOLLARD

REMOVABLE PALLET

STOPS (TYPICAL)

13'

[3962]

4'-6

[1375]

8'

[2438]

2'

[610]

1'-6"

[457]

7'

[2134]

3'-6

[1073]

65'-11"

[20091]

27'-0

[8250]

27'-0

[8250]

27'-0

[8250]

SAFETY RAMPS

(TYPICAL)

8'

[2438]

9'-8"

[2946]

6'-3"

[1905]

7'-11"

[2413]

PALLET LIFT

DETAILS

5"

[127]

BALL TRANSFER CONVEYOR

GRAVITY ROLLER CONVEYOR

[133.35]

[6.35]

CONVEYOR

DETAILS

REMOVABLE PALLET

STOPS (TYPICAL)

RAM PROTECTION

(TYPICAL)

463L PALLET RACK

(TYPICAL)

FORKLIFT GUARD

POSTS (TYPICAL)

BOLLARD

(TYPICAL)

FA8604-19-R-8108 Attachment 6 Page 1 of 1