FA860125R0012 Attachment 4 - Price sheet Lab Analysis.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Water Lab Analysis Services
- Solicitation number
- FA860125R0012
About this file
The document is a Price Sheet for Lab Analysis (Attachment 4) associated with Solicitation FA860125R0012 for Water Lab Analysis Services issued by the Department of the Air Force Materiel Command. The pricing attachment details a comprehensive range of laboratory testing services including RCRA Metals, TCLP analysis, pH testing, flashpoint measurements, PCBs, pesticides/herbicides, organic halides, specific gravity, heating value, reactive sulfide and cyanide testing, and various other environmental and chemical analyses.
The solicitation is a combined synopsis/solicitation for a Firm Fixed Price Blanket Purchase Agreement, with proposals due by 1:00 pm EDT on 14 May 2025. Electronic proposals must be submitted via email to brandon.bolen.2@us.af.mil and edward.huchison@us.af.mil, with specific email submission requirements including a maximum 15 MB file size and permitted file types. The contract will be awarded to the responsible offeror submitting the lowest total evaluated price that meets technical capability requirements, with NAICS code 541380 and no specific small business set-aside designated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lab Prices
| Attachment 4 FA860125R0012 7 Aprl 2025 | |||||||||||||||||||||||||||||||||||||||||||||||
| Lab Analysis | Total RCRA Metals | TCLP RCRA Metals | pH | Flashpoint | Flashpoint Solids | PCBs | Pesticides/Herbicides | TCLP Pesticides | Total Organic Halides | Specific Gravity | Higher Heating Value (BTU) | Reactive Sulfide | Reactive Cyanide | Free Liquids | Oxidizer Screen | Dioxins | Misc. Metals | VOC Total | SVOC Total | TCLP VOC | TCLP SVOC | O&G | CBOD | Prop. Glycol | PFAS | PFAS <10 compounds | COD | Zinc | Aluminum | Lead | Copper | Phosphorus | Cyanide | Molybdenum | Nickel | Total Suspended Solids | Total Mercury | Total Selenium | Total Arsenic | Total Cadmium | Total Chromium | Total Silver | Sulfate | Total Sulfide | Total Cyanide | BOD | Chlorine, Total Residual |
| Cost Year 1 |
| Cost Year 2 |
| Cost Year 3 |
| Cost Year 4 |
| Cost Year 5 |
| Total RCRA Metals | TCLP RCRA Metals | pH | Flashpoint | Flashpoint Solids | PCBs | Pesticides/Herbicides | TCLP Pesticides | Total Organic Halides | Specific Gravity | Higher Heating Value (BTU) | Reactive Sulfide | Reactive Cyanide | Free Liquids | Oxidizer Screen | Dioxins | Misc. Metals | VOC Total | SVOC Total | TCLP VOC | TCLP SVOC | O&G | CBOD | Glycol | PFAS/ PFOA | PFAS <10 compounds | COD | Zinc | Aluminum | Lead | Copper | Phosphorus | Cyanide | Molybdenum | Nickel | Total Suspended Solids | Total Mercury | Total Selenium | Total Arsenic | Total Cadmium | Total Chromium | Total Silver | Sulfate | Total Sulfide | Total Cyanide | BOD | Chlorine, Total Residual | |
| Average # of routine samples per year | 30 | 50 | 45 | 45 | 5 | 18 | 2 | 2 | 4 | 2 | 2 | 2 | 2 | 2 | 2 | 1 | 15 | 10 | 10 | 10 | 10 | 22 | 12 | 15 | 20 | 6 | 16 | 14 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 2 |
| Cost Year 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cost Year 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cost Year 3 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cost Year 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cost Year 5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Cost Year 1 | $0.00 | ||||||||||||||||||||||||||||||||||||||||||||||
| Total Cost Year 2 | $0.00 | The offeror shall populate their pricing in the area shaded in yellow (Rows 4-8) for each test and given year. Row 12 indicates estimated number of tests for each analysis per year. The spreadsheet will calculate rows 14-25. | |||||||||||||||||||||||||||||||||||||||||||||
| Total Cost Year 3 | $0.00 | ||||||||||||||||||||||||||||||||||||||||||||||
| Total Cost Year 4 | $0.00 | ||||||||||||||||||||||||||||||||||||||||||||||
| Total Cost Year 5 | $0.00 | In rows 27-38 the offeror shall populate their surcharges (as a percentage) for each Rush turnaround time shaded in orange and gray. | |||||||||||||||||||||||||||||||||||||||||||||
| Total for 5 years | $0.00 | ||||||||||||||||||||||||||||||||||||||||||||||
| Rush Analysis Surcharge (Does not include PFAS) | |||||||||||||||||||||||||||||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||||||||||||||||||||||||||||||||||
| 4-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 3-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 2-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 1-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| PFAS Rush Analysis Surcharge | |||||||||||||||||||||||||||||||||||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||||||||||||||||||||||||||||||||||
| 10-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 6-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 4-day Turn Around Time | |||||||||||||||||||||||||||||||||||||||||||||||
| 3-day Turn Around Time |
Certified Unclassified Information
File details come from the government source that posted it. Updated .