Questions and Answers 1 - DLA Furniture.pdf
PDF 239 KB Posted
- Attached to
- DLA Bldg 30207 (Area A) Furniture
- Solicitation number
- FA860125Q0064
About this file
This document is a Questions and Answers (Q&A) file for a federal furniture procurement solicitation for the Defense Logistics Agency (DLA) Building 30207 Area A. The solicitation (FA8601-25-Q-0064) is issued by the Air Force Life Cycle Management Center at Wright-Patterson Air Force Base and seeks furniture for a specific facility, with responses due by 13 August 2025 at 11:00 AM EDT. The procurement is for a firm-fixed-price contract with a 120-day performance period, with contractors required to provide comprehensive furniture solutions including modular system panels, worksurfaces, storage units, and specialized furniture configurations.
The Q&A document covers 32 specific questions addressing detailed technical requirements, including panel specifications, power configurations, door heights, shelving options, receptacle placements, and finish selections. Key clarifications include acceptance of notches in worksurfaces, confirmation of mobile file cabinet specifications, allowance for metal markerboard tiles, approval of various panel and leg configurations, and flexibility on certain design elements. The government indicates that final selections for some specialized elements will occur upon contract award, and contractors are advised that non-standard selections may incur additional costs. Submission requirements include comprehensive technical proposals, pricing details, 3D renderings, and compliance with specific government specifications.
View the file
Other files
Show 40 more
Latest 50 of 130 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-
PATTERSON AIR FORCE BASE OHIO
29 July 2025
FROM: AFLCMC/PZIBA
2275 D Street, Building 16, Room 128 Wright-Patterson AFB, OH 45433
SUBJECT: Response to Inquiries regarding FA8601-25-Q-0064, DLA Bldg 30207 Area A Furniture – Document 1
QUESTIONS
1. QUESTION: Are notches in the worksurfaces okay or are grommets required? Grommets will be placed in the HATs.
ANSWER: Yes, I can accept notches.
2. QUESTION: Spec Sheet calls out for each station “BBF Mobile with Cushion”. Confirming you mean BF Mobile with Cushion? BBF will not fit under the worksurfaces with a cushion.
ANSWER: Mobile BF is correct.
3. QUESTION: Are Metal Markerboard tiles acceptable instead of the exterior mounted marker boards?
ANSWER: Yes, as long as they are magnetic and whiteboard combination.
4. QUESTION: If the panel tiles are already tackable is an exterior mounted tackboard required?
ANSWER: No tackable panels are acceptable.
5. QUESTION: Is (1) 72” W Overhead with 2 doors acceptable V.S. (2) 36” W Overheads?
ANSWER: No, 2 please for flexibility.
6. QUESTION: In areas where there are (2) panels with frameless glass are we allowed to span a single piece across both panels?
ANSWER: No, again 2 please.
7. QUESTION: In Typical H, our wardrobe has only 1 fixed shelf, but I am able to add 3 adjustable shelves.
Is this acceptable?
ANSWER: Yes
8. QUESTION: In Typical H4.1, would any support leg be accepted for the worksurfaces? Post or dual leg?
ANSWER: Prefer an Open Leg, but as long as the space has opening – acceptable.
9. QUESTION: In Typical IT-1 / IT-2, there is no call out for amount of receptacles. Panels are asked to be powered, and you have a power strip as part of the typical. How many receptacles and in what locations would you like them?
ANSWER: The standard per the MTR, MODULAR SYSTEM PANEL, Minimum Technical Requirements, Basis of Design - HAWORTH (Compose) or Equal, Panel Mounted Components, Laminate Worksurface with Vinyl Edge, Metal Storage, Locking Storage, Taper Pulls, Computer Accessories (monitor arms, power modules, keyboard pull out, etc). 3" Thick Welded Cold-Rolled Steel Stack Panel Frame, Stack Panel Permits Stacking Modules In-Field, STC Panel Rating -20, Metal to Metal Interlocking Panel Connectors, 3" Adjustment Range on Base Levelers, Combination of Interchangeable Segmented Tiles to Include: Acoustical Fabric/Tackable/Glass/WhiteBoard/Laminate/Open Tiles, Sliding and Hinge Door Available for 81" +/- Panel Height, Power and Non-Power Panels, Power/Communication Shielded Distribution, Capable of Running Max 30 Data Cables (horizontal and vertical), Power Panels to Include 3 Duplex Receptacles, 2 Knock-Out Voice Data Port Per Cubicle, Base/Ceiling Power Input, All Connectors, Finish Trim, Hardware and Supports for a Complete Install to be included for Full Installation. Furniture Contractor to Provide Certified Electrician to Make connections from Building Power to Modular Panels. See Plan for Panel Elevation and Power Input locations.
10. QUESTION: Could you provide some clarity on the power location of each typical? Does every panel truly need to be powered.
ANSWER: No, I will mark up the typicals with power to post later today.
11. QUESTION: Are the red dots on the floor plan marking power poles for the stations? Does each station get their own dedicated power?
ANSWER: No (printer is doing that -sorry), I will post the comm pole locations later today.
12. QUESTION: In Typical E the panel the door will be attached to has to be a full height with a fabric stack for the door to connect. Is this acceptable?
ANSWER: Will accept stack frame glass instead.
13. QUESTION: In Typical E an end panel is called out in the drawing but not in the spec. Is an End panel required? If yes, how do you want it to be attached?
ANSWER: I would like a small privacy space on end, even a modesty panel. I will add details to send out.
14. QUESTION: In Typical E again, the lower storage takes up most of the room again the panels. Only one panel outlet location will be open on the side RED. Can we put other outlets on the back area GREEN to meet the required 6?
ANSWER: I will mark this up and send later today.
15. QUESTION: Can we leave the existing Reception Desk? If so, will the exterior panels be replaced? What type of material should we specify? Please provide additional details.
ANSWER: See cutsheet 05b-CTS24-RF1-F30207 DLA New Furniture-2025tp079-NotOWF-rv1.pdf for clarification on the RF1 for the Reception Desk Refacing, this also shows the finishes.
16. QUESTION: Existing signage is on the doors. If signage is removed (we assume it’s taped) if removal damages the doors, do we need to sand and stain the entire door? A simple touch-up may be noticeable.
ANSWER: As for the signage repair, yes if the removal requires a full touch up – please match existing stain.
17. QUESTION: Power Locations on all Systems Furniture Typicals.
ANSWER: See the revised plan.
18. QUESTION: Details for Typical E, sliding door and H/A end panel.
ANSWER: See the revised cutsheet.
19. QUESTION: Plan with existing fans/power poles.
ANSWER: See the revised plan.
20. QUESTION: COMM pole plan.
ANSWER: See Revised plan.
21. QUESTION: Details on Moveable Wall.
ANSWER: Remove wall and track (noted on R1).
22. QUESTION: Will there be an Image File supplied for Custom Logo’s?
ANSWER: Yes, an Image File will be supplied for Custom Logo’s at award.
23. QUESTION: Elevator Interior Dimensions.
ANSWER: Couldn’t measure it is locked down and waiting for repair but stated fits a 40x48 skid and is 7’-0” tall.
24. QUESTION: Additional qty’s for certain typicals.
ANSWER: See revised cutsheets/SOW.
25. QUESTION: Adobe stock picture referenced in original cutsheet is discontinued.
ANSWER: Yes, this has been discontinued. Use Adobe Stock 194588220. Refer to new cutsheet AWP-3 revision.
26. QUESTION: Most of this spec will be specials due to non-standard selections and elevations. Can do all of this, but would let them know that this will add cost as opposed to standards. If they don’t want specials, see questions below.
ANSWER: Specials are acceptable to meet specified requirements and standard finishes for bidding purposes, final selection to happen upon award.
27. QUESTION: Are they ok with a 7’ door? That is our standard door height. This would be implemented across the entire wall so that the horizontal line where the glass starts is at 7’.
ANSWER: 7’0” door is acceptable.
28. QUESTION: Standard whiteboards from Altos are 4’ H so they would go up to the glass and eliminate the laminate above it. Is this ok as well?
ANSWER: That is acceptable.
29. QUESTION: Frosting will have to be an aftermarket 3rd party installation. Confirm they are ok with that.
ANSWER: That is acceptable.
30. QUESTION: Arctic paint is discontinued, can do Anodized Aluminum or Platinum paint as closest available options. Please confirm with them. Link to standard finishes -https://assets.teknion.com/m/33915ac848f1f764/original/Architectural-Frame-Finishes-Sample-Card-.pdf.
ANSWER: Final selection to happen upon award.
31. QUESTION: Mercurial Walnut is non-standard Architectural walls fascia laminate. Here is link for standard options - https://d2r72yk5wmppdj.cloudfront.net/m/3556a74e095d1d00/-Laminate-Fascia---card.pdf.
ANSWER: Final selection to happen upon award.
32. QUESTION: What would be the ideal install date for this project? We know it’s phased, and such, however I was hoping for a date to plug into my notes.
ANSWER: Let’s assume an October 15th start date currently until solicitation is awarded.
CANDICE L. SNOW
Contracting Officer
AFLCMC/PZIBA
https://assets.teknion.com/m/33915ac848f1f764/original/Architectural-Frame-Finishes-Sample-Card-.pdf https://d2r72yk5wmppdj.cloudfront.net/m/3556a74e095d1d00/-Laminate-Fascia---card.pdf https://d2r72yk5wmppdj.cloudfront.net/m/3556a74e095d1d00/-Laminate-Fascia---card.pdf
| 2025-07-29T12:51:52-0400 | |
| SNOW.CANDICE.LYNN.1423542060 |