Questions and Answers 1 - DLA Furniture.pdf
PDF 229 KB Posted
- Attached to
- DLA Bldg 30207 (Area A) Furniture
- Solicitation number
- FA860125Q0064
About this file
This document is a Questions and Answers (Q&A) file for a federal furniture procurement solicitation for the Defense Logistics Agency (DLA) Building 30207 Area A. The solicitation (FA8601-25-Q-0064) seeks furniture for a government facility, with vendors required to submit detailed technical and price proposals electronically by Wednesday, 13 August 2025 at 11:00 AM EDT to Candice Snow and Brian Algeo at Wright-Patterson Air Force Base.
The Q&A document provides clarifications on specific furniture requirements, including acceptable configurations for workstations, panel specifications, storage units, and power/electrical configurations. Key details include acceptance of notched worksurfaces, confirmation of mobile file cabinet specifications, preferences for overhead storage (two 36" units preferred over one 72" unit), panel mounting options, and power panel requirements. The procurement aims to award a firm-fixed-price contract with a 120-day performance period, evaluating proposals based on technical capability and lowest total evaluated price, with the government reserving the right to award without discussions.
View the file
Other files
Show 40 more
Latest 50 of 130 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-
PATTERSON AIR FORCE BASE OHIO
24 July 2025
FROM: AFLCMC/PZIBA
2275 D Street, Building 16, Room 128 Wright-Patterson AFB, OH 45433
SUBJECT: Response to Inquiries regarding FA8601-25-Q-0064, DLA Bldg 30207 Area A Furniture – Document 1
QUESTIONS
1. QUESTION: Are notches in the worksurfaces okay or are grommets required? Grommets will be placed in the HATs.
ANSWER: Yes, I can accept notches.
2. QUESTION: Spec Sheet calls out for each station “BBF Mobile with Cushion”. Confirming you mean BF Mobile with Cushion? BBF will not fit under the worksurfaces with a cushion.
ANSWER: Mobile BF is correct.
3. QUESTION: Are Metal Markerboard tiles acceptable instead of the exterior mounted marker boards?
ANSWER:
4. QUESTION: If the panel tiles are already tackable is an exterior mounted tackboard required?
ANSWER: No tackable panels are acceptable.
5. QUESTION: Is (1) 72” W Overhead with 2 doors acceptable V.S. (2) 36” W Overheads?
ANSWER: No, 2 please for flexibility.
6. QUESTION: In areas where there are (2) panels with frameless glass are we allowed to span a single piece across both panels?
ANSWER: No, again 2 please.
7. QUESTION: In Typical H, our wardrobe has only 1 fixed shelf, but I am able to add 3 adjustable shelves.
Is this acceptable?
ANSWER: Yes
8. QUESTION: In Typical H4.1, would any support leg be accepted for the worksurfaces? Post or dual leg?
ANSWER: Prefer an Open Leg, but as long as the space has opening – acceptable.
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER (AFLCMC) WRIGHT-
PATTERSON AIR FORCE BASE OHIO
9. QUESTION: In Typical IT-1 / IT-2, there is no call out for amount of receptacles. Panels are asked to be powered and you have a power strip as part of the typical. How many receptacles and in what locations would you like them?
ANSWER: The standard per the MTR, MODULAR SYSTEM PANEL, Minimum Technical Requirements, Basis of Design - HAWORTH (Compose) or Equal, Panel Mounted Components, Laminate Worksurface with Vinyl Edge, Metal Storage, Locking Storage, Taper Pulls, Computer Accessories (monitor arms, power modules, keyboard pull out, etc). 3" Thick Welded Cold-Rolled Steel Stack Panel Frame, Stack Panel Permits Stacking Modules In-Field, STC Panel Rating -20, Metal to Metal Interlocking Panel Connectors, 3" Adjustment Range on Base Levelers, Combination of Interchangeable Segmented Tiles to Include: Acoustical Fabric/Tackable/Glass/WhiteBoard/Laminate/Open Tiles, Sliding and Hinge Door Available for 81" +/- Panel Height, Power and Non-Power Panels, Power/Communication Shielded Distribution, Capable of Running Max 30 Data Cables (horizontal and vertical), Power Panels to Include 3 Duplex Receptacles, 2 Knock-Out Voice Data Port Per Cubicle, Base/Ceiling Power Input, All Connectors, Finish Trim, Hardware and Supports for a Complete Install to be included for Full Installation. Furniture Contractor to Provide Certified Electrican to Make connections from Building Power to Modular Panels. See Plan for Panel Elevation and Power Input locations.
10. QUESTION: Could you provide some clarity on the power location of each typical? Does every panel truly need to be powered.
ANSWER: No, I will mark up the typicals with power to post later today.
11. QUESTION: Are the red dots on the floor plan marking power poles for the stations? Does each station get their own dedicated power?
ANSWER: No (printer is doing that -sorry), I will post the comm pole locations later today.
12. QUESTION: In Typical E the panel the door will be attached to has to be a full height with a fabric stack for the door to connect. Is this acceptable?
ANSWER: Will accept stack frame glass instead.
13. QUESTION: In Typical E an end panel is called out in the drawing but not in the spec. Is an End panel required? If yes, how do you want it to attach?
ANSWER: I would like a small privacy space on end, even a modesty panel. I will add details to send out.
14. QUESTION: In Typical E again, the lower storage takes up most of the room again the panels. Only one panel outlet location will be open on the side RED. Can we put other outlets on the back area GREEN to meet the required 6?
ANSWER: I will mark this up and send later today.