QA_FA860124Q0163_NMUSAF CAMERA UPDATES (Rev 09.06.2024).pdf
PDF 140 KB Posted
- Attached to
- NMUSAF CAMERA UPGRADE Federal contract opportunity
- Solicitation number
- FA860124Q0163
About this file
This document contains questions and answers related to Solicitation FA8601-24-Q-0163 for the NMUSAF Camera Upgrade project. The key details are:
The solicitation is for upgrading the camera system at the National Museum of the United States Air Force (NMUSAF). The scope includes providing IT infrastructure, using existing fiber optic communications, and installing new cameras. The existing system is approximately 15 years old and uses Hikvision equipment. The government will provide access to the existing command and control system and infrastructure, but the contractor will need to provide any additional servers, storage, and networking equipment. The solicitation requires a minimum of 30 days of video retention. Contractors will not be able to conduct site visits prior to contract award, but will have the opportunity after award. Responses to the solicitation are due by September 10, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| NMUSAF SITE VISIT_REQUEST FORM .docx | DOCX document | |
| QA_FA860124Q0163_NMUSAF CAMERA UPDATES (Rev 09.06.2024 - updated).pdf | ||
| FIber Optic Installation.pdf | ||
| Bldg 20005_1st Floor.pdf | ||
| Bldg 20004 E.pdf | ||
| Bldg 20487_1st Floor.pdf | ||
| Bldg 20004 D.pdf | ||
| Bldg 20004 D Mezz.pdf | ||
| Bldg 20489_4th Floor.pdf | ||
| Attch 2._Statement of Work_dated 09 Jul 2024.pdf | ||
| Bldg 20489_Mezz.pdf | ||
| Bldg 20005 M_1st Floor.pdf | ||
| Aircraft Locator Map.pdf | ||
| SOUVENIER AIRCRAFT LOCATOR MAP.pdf | ||
| Bldg 20497_1.pdf | ||
| Bldg 20489_1st Floor.pdf | ||
| Bldg 20494_1.pdf | ||
| Bldg 20489_2th Floor.pdf | ||
| Bldg 20489_B.pdf | ||
| Bldg 20004 C.pdf | ||
| Attch 1. Synopsis_Combined_FA860124Q0163 (Camera System).pdf | ||
| Bldg 20489_3th Floor.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS RESPONSE NLT, 10 Sept 2024. Rev 06 Sept 2024
RE: Solicitation FA8601-24-Q-0163
NMUSAF Camera Upgrades
Q&As
1. Are we able to schedule a Site Visit? Unfortunately, site visits are not feasible at this time of the year, but once the contract is awarded, they will be able to make arrangements. In the meantime, please consider to review the floor plans attached to the RFQ notice.
2. The SOW does not specify the number of days for video retention. Most often it is 30 days.
How many days of video retention are required for this project? Yes, we would like a minimum of 30 days retention
3. The SOW specifies that we are to provide IT infrastructure for the camera system and that we may use strands of existing fiber between buildings for system communications. The drawings do not note the MDF or IDF locations. Can you please provide the locations of the
MDF/IDF closets and the specs on the fiber available? Attached document of fiber runs and closet locations. FYSA, document is marked CUI by originator.
4. How old are the buildings? Building age ranges from 1920’s – 2018.
5. How much square footage is in each building? Approx. 250,000 sq. ft.
6. How stable is the power in the buildings? Power is stable. Provided by WPAFB with generator/battery backup
7. Is there a dropped ceiling in all areas of installation? No
8. What type of walls are in the perimeter areas? Depends. Majority of exterior walls are aircraft hangars (aluminum)
9. What type of walls is inside the offices? Drywall
10. Do we need to drill between the walls, to run our cable infrastructure? Some walls, yes
11. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?
Conduit not required
12. What is the manufacturer of the existing CCTV system? Hik-Vision
13. How old is the existing CCTV system? Approx. 15 years old
14. Is the existing Command Control (SOC) well ventilated? Yes
15. Are you planning to use the existing Command Control (SOC) for the new CCTV
System? Yes
QUESTIONS RESPONSE NLT, 10 Sept 2024. Rev 06 Sept 2024
16. How far apart will the new Command Control be from the old command control system? N/A
17. Is there a special room with HVAC allocated for the new Servers? Existing room has HVAC
18. How many cameras are interior, and in which buildings? Unable to reply. Information can be gathered during site visit.
19. How many cameras are to be installed in a hanger, in which building(s) (if any,) and how high is it? Unable to reply. Information can be gathered during site visit.
20. How many cameras are to be installed on a roof, in which building(s) (if any) and how high is it? Unable to reply. Information can be gathered during site visit.
21. How many cameras will be exterior, and in which buildings? Unable to reply. Information can be gathered during site visit.
22. Is there a requirement to install some cameras on poles? Yes
23. If yes, is there an existing connection to existing conduit to the poles, and what is the height of the pole? Currently connected via wi-fi
24. How much storage is needed for the CCTV Video recording? At least 30 days
25. Is the government supplying the Wi fi Nanobeams and switches for this project? None are spec'd out. Yes, the vendor can use our current equipment but anything beyond that will have to be provided by the contractor.
26. What preference of server, 96TB or 192TB? 192TB