Solicitation Amendment 06_FA860123R0026.pdf
PDF 250 KB Posted
- Attached to
- Solicitation for Mechanical Systems Repair Federal contract opportunity
- Solicitation number
- FA8601-23-R-0026
About this file
This memorandum amends solicitation FA8601-23-R-0026 for mechanical systems repair at Wright Patterson Air Force Base. The amendment incorporates responses to questions received on October 13th related to replacing domestic hot water boilers. No changes were made to the solicitation closing date. Responses clarify that an existing booster pump is 480V 7.5HP, the existing boilers being replaced are not 208V 20A units, the units do not utilize the same circuit, 208V power can be obtained from the main electrical room, and the electrical panel is a 120/208V 4-wire unit manufactured by Siemens.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 07_FA860123R0026.pdf | ||
| Solicitation Amendment 05_FA860123R0026.pdf | ||
| 2. RFI Responses_FA8601-23-R-0026_05 Oct 2023.pdf | ||
| Solicitation Amendment 04_FA860123R0026.pdf | ||
| Solicitation Amendment 03_FA860123R0026.pdf | ||
| Solicitation Amendment 02_FA860123R0026.pdf | ||
| RFI Responses_FA8601-23-R-0026_FINAL.pdf | ||
| Solicitation Amendment 01_FA860123R0026.pdf | ||
| 3. Mechanical RFP Pricing Worksheet_26 Sep 2023.xlsx | XLSX spreadsheet | |
| Solicitation - FA860123R0026.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
WRIGHT-PATTERSON AIR FORCE BASE OHIO
16 October 2023
MEMORANDUM FOR: Prospective Offerors
FROM: AFLCMC/PZICA
SUBJECT: Request for Proposal (RFP) FA8601-23-R-0026 AMENDMENT 6
1. AMENDMENT 6 incorporates late RFI responses.
2. There is no change to the RFP Closing Date.
Attachments:
1. 13 October 2023 RFI Responses
RFI # Question Date Submitted Response
SOO Task ID 10.8 states to install a 480V Booster Pump. Is the existing Booster pump 480V 3Ø 7.5HP. 13‐Oct‐23 Yes
SOO Task ID 10.11 states to install (2) condensing boilers. These are 208V 3Ø 20A units. Are the existing boilers being demoed 208V 3Ø 20A units? 13‐Oct‐23 No
3 Are the existing units utilizing the same circuit? 13‐Oct‐23 No
If not, where in the facility can 208V 3Ø power be obtained 13‐Oct‐23 In the main electrical room
What is the make and model # associated with that electric panel? 13‐Oct‐23
120/208, 3Ø, 4 wire – CAT P1C30ML125CTSN – Siemens
(BQD)
Mechanical Source Selection (FA8601‐23‐R‐0026) Project 23‐3100, Replace Domestic Hot Water Boilers
| Solicitation Amendment 06_FA860123R0026.pdf |
| 10132023 RFI Responses1.pdf |
File details come from the government source that posted it. Updated .