Solicitation Amendment 06_FA860123R0026.pdf

PDF 250 KB Posted

Attached to
Solicitation for Mechanical Systems Repair Federal contract opportunity
Solicitation number
FA8601-23-R-0026
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This memorandum amends solicitation FA8601-23-R-0026 for mechanical systems repair at Wright Patterson Air Force Base. The amendment incorporates responses to questions received on October 13th related to replacing domestic hot water boilers. No changes were made to the solicitation closing date. Responses clarify that an existing booster pump is 480V 7.5HP, the existing boilers being replaced are not 208V 20A units, the units do not utilize the same circuit, 208V power can be obtained from the main electrical room, and the electrical panel is a 120/208V 4-wire unit manufactured by Siemens.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation for Mechanical Systems Repair, newest first.
File Type Posted
Solicitation Amendment 07_FA860123R0026.pdf PDF
Solicitation Amendment 05_FA860123R0026.pdf PDF
2. RFI Responses_FA8601-23-R-0026_05 Oct 2023.pdf PDF
Solicitation Amendment 04_FA860123R0026.pdf PDF
Solicitation Amendment 03_FA860123R0026.pdf PDF
Solicitation Amendment 02_FA860123R0026.pdf PDF
RFI Responses_FA8601-23-R-0026_FINAL.pdf PDF
Solicitation Amendment 01_FA860123R0026.pdf PDF
3. Mechanical RFP Pricing Worksheet_26 Sep 2023.xlsx XLSX spreadsheet
Solicitation - FA860123R0026.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

WRIGHT-PATTERSON AIR FORCE BASE OHIO

16 October 2023

MEMORANDUM FOR: Prospective Offerors

FROM: AFLCMC/PZICA

SUBJECT: Request for Proposal (RFP) FA8601-23-R-0026 AMENDMENT 6

1. AMENDMENT 6 incorporates late RFI responses.

2. There is no change to the RFP Closing Date.

Attachments:

1. 13 October 2023 RFI Responses

RFI # Question Date Submitted Response

SOO Task ID 10.8 states to install a 480V Booster Pump. Is the existing Booster pump 480V 3Ø 7.5HP. 13‐Oct‐23 Yes

SOO Task ID 10.11 states to install (2) condensing boilers. These are 208V 3Ø 20A units. Are the existing boilers being demoed 208V 3Ø 20A units? 13‐Oct‐23 No

3 Are the existing units utilizing the same circuit? 13‐Oct‐23 No

If not, where in the facility can 208V 3Ø power be obtained 13‐Oct‐23 In the main electrical room

What is the make and model # associated with that electric panel? 13‐Oct‐23

120/208, 3Ø, 4 wire – CAT P1C30ML125CTSN – Siemens

(BQD)

Mechanical Source Selection (FA8601‐23‐R‐0026) Project 23‐3100, Replace Domestic Hot Water Boilers

Solicitation Amendment 06_FA860123R0026.pdf
10132023 RFI Responses1.pdf