FA860122R0021 10 June 2022 RFI Responses.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Base Refuse
Solicitation number
FA860122R0021
Issued by

View the file

Other files

File Type Posted
WPAFB Questions v4.pdf PDF
WPAFB Questions v3.pdf PDF
Solicitation Amendment FA860122R00210008 SF 30 (1).pdf PDF
Solicitation Amendment FA860122R00210007 SF 30.pdf PDF
WPAFB Questions.pdf PDF
Attachment 5- Pricing Bid Schedule FA8601-22-R-0021 Rev III.xlsx XLSX spreadsheet
Solicitation Amendment - FA860122R00210006.pdf PDF
Solicitation Amendment FA860122R00210006 SF 30.pdf PDF
RFI 29 Sept 2022.pdf PDF
Attachment 2- 52-212-2 Addendum to Evaluation Factors.pdf PDF
Solicitation Amendment FA860122R00210005 SF 30 (1).pdf PDF
RFI 22 Sept 2022.pdf PDF
Solicitation Amendment FA860122R00210004 SF 30.pdf PDF
Solicitation Amendment - FA860122R00210004.pdf PDF
Attachment 3- Performance Work Statement (PWS) REV 4.pdf PDF
Attachment 2- 52-212-2 Addendum to Evaluation Factors.pdf PDF
Solicitation Amendment FA860122R00210003 SF 30.pdf PDF
Attachment 6 - Mission Essential Services Memo.pdf PDF
Attachment 3 - Performance Work Statement (PWS) Rev 3.pdf PDF
Attachment 5 - Pricing Bid Schedule FA8601-22-R-0021 Rev II.xlsx XLSX spreadsheet
Attachment 4- Wage Determination.pdf PDF
Solicitation Amendment - FA860122R00210003.pdf PDF
Attachment 1 - Instruction to Offerors.pdf PDF
Attachment 3 - PWS Refuse 10 Jun 2022.pdf PDF
Solicitation Amendment FA860122R00210002 SF 30 (1).pdf PDF
Solicitation Amendment FA860122R00210001 SF 30.pdf PDF
Response to Refuse RFIs - Consolidated.xlsx XLSX spreadsheet
Attachment 3 - PWS Refuse 31 May 2022 Revision.pdf PDF
Attachment 2 - 52-212-2 Addendum to Evaluation Factors 26 May 2022.pdf PDF
Solicitation Amendment - FA860122R00210001.pdf PDF
Attachment 3 - PWS Refuse Rev 2 23 May 2022.pdf PDF
Solicitation Amendment FA860122R00210001 SF 30.pdf PDF
Solicitation - FA860122R0021.pdf PDF
Attachment 2 - 52-212-2 Addendum to Evaluation Factors.pdf PDF
Attachment 6 - Mission Essential Services Memo.pdf PDF
Attachment 5 - Pricing Bid Schedule Base Refuse FA8601-22-R-0021.xlsx XLSX spreadsheet
Attachment 4 - Wage Determination.pdf PDF
Attachment 1 - Instruction To Offerors.pdf PDF
Performance Work Statement.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions, 6 June 2022

WRIGHT PATTERSON AFB, OH - SOLICITATION FA860122R0021 QUESTIONS
**Please note, contractor questions have not been modified but to avoid confusion, this is not intended to be an IDIQ contract. Please see updated PWS
Question Reference, and/or Statement NumberQuestionsGovernment Answers to QuestionsContractor Response to Gov't Answers and Follow-up Questions and CommentsGovernment Answers to Questions
1Reference Solicitation SF 1449 Item 19, Supplies or Services & Prices or Costs, and PWS Table A-1.1 Collections Points, and Gov't Excel Pricing Bid Schedule Can the government add a column to each of the Collection Points to identify the buildings/collection stations associated with each of the Line Items? We need to determine the total amount of support required for each line item in order to provide a fee for each line item.No, it is spelled out in the Table.A-1.1 Bldg. Size of container, Type of Container. SF 1449 should not be used, bids should be included in the bid scheduleJust to confirm, the prices must be inserted in the government provided Excel Bid Schedule, and in the PWS Appendix D pdf.? See next question below.Yes
2Reference PWS Appendix D, Customer Breakout. Are these considered Sub-CLIN's and is the contractor required to insert a unit fee for each of these items? The Appendix D format does not provide a cell for a unit fee and for the extended price. This pricing format has drastically changed from the last solicitation.Yes the contractor is required to insert their fees.Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor convert the pdf to an Excel document and add a column for unit fee and another column for extended fee?Yes
3Are the quantities noted in the PWS, Appendix D related to the government's record of historical data?YesPlease see comment in follow up question #
4Reference the Solicitation Supplies or Services & Prices or Costs beginning on page 3. Without a format for proposed Sub-Clin unit quantities and unit pricing, how will all IDIQ and On-Call Item/Services be priced and how will the government compensate the contractor for each IDIQ service?The contractor will place the pricing for each p/u and bill accordinglyWhere do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
5Reference PWS Table A-1.1 Collection Points Tasks & Estimated Frequencies. Many of the government calculations for the estimated number of Pick-Ups and Cubic Yards appear to be incorrect. Some examples are buildings 10830 - 4, 20014, 20015, . Each shows a single 8 CY compactor requiring service on Mon - Thurs (2 times per week) with cubic yards equated to 32 for each collection station. The correct math reflects a total of 16 cubic yards per week for each. In several cases, the government reflects two specific service days per week and shows only one weekly in the Pick-ups Per Week column. Others calculation contradiction issues appear on Buildings 11473, 20017, 20018, 20028, 20029, 20024C, 20031, 20441, 20630, 20642, 20653, 20838, 30069, 30101 Comp, 30206, 31214 Comp, 31245, 34024-34026, Wright Flying FieldUpdated PWSAfter reviewing the Table A-1.1, I could not find any changes that correct my concern. It appears to be the same as the table in the previous PWS. How do we correctly equate the total number of services if they do no reconcile?See updated Appendix D
6Reference PWS Appendix D (DESCRIPTION; NON-PERSONAL SERVICES. Many of the quantities for the four different CLINs representing different organizations (CE, Museum, MFH, and Medical Center) reflect the same quantities between the CLINS. Normally, the quantities are in amounts based on historical data, or in amounts the government estimates should be needed for the pricing format for each organization. Should these quantities be adjusted to better represent the historical data for each organization, or for the quantities estimated by the government?Contractor will input cost per pick upWhere do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
7See PWS Paragraph 1.1.2.4 - Bulk Pickup states the contractor shall divert recyclable items to other base recycle center. Please clarify concerning the use of Base Recycling for MFH.Per PWS recyclable items go to the base recycling centerPlease reference Gov't answer to question # 19, where the governments states the Contractor is not allowed to deliver the MFH recycle material to the Base Recycle Center. Please ClarifyParagraph updated
8See PWS Paragraph 1.1.2.5 - On-call Dumpster (Military/Family Housing). How does the contractor price this separate service? Blocks 19 through 27 do not provide a format to separately price this service. The CLIN structure does not provide a format to separately price this service.The costs will be rolled up into a single CLIN. Please see breakout provided in PWS, Appendix D. Bid accordingly and roll numbers into a single total. Rows can be added as needed to reflect separate costs, but all costs must be clearly totaled and stated per CLIN. Contract is Fixed-PriceAccording to this response, the contractor should use the Appendix D to compute the total cost per each CLIN. Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee and submit this customized Excel file as backup for the Total Equated cost of the CLIN?See updated Appendix D. If that's how the contractor chooses to bid, but CLIN totals must be provided as shown in bid schedule.
9See PWS Paragraph 1.1.3 - Over and Above Requirements (MSW). How does the contractor price this separate service ? Blocks 19 through 27 do not provide a format to separately price for IDIQ (Indefinite Delivery/Indefinite Quantity) items/service. The CLIN structure does not provide a format to separately price this service.Removed. See updated PWSOK
10See PWS 1.1.2.1. Construction and Demolition Debris (C & D) (IDIQ)The paragraph states the contractor will invoice for reimbursement for the off-base disposal permit and fees. How does the contractor price this separate service ? Blocks 19 through 27 do not provide a format to separately price for IDIQ (Indefinite Delivery/Indefinite Quantity) items/service. The CLIN structure does not provide a format to separately price this service.Refer to C11 response. See updated PWS. Contract is Fixed Price, IDIQ does not applyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for? Where is it referenced in the PWS or in the solicitation documents?Cell C11 (Response to Q8)
11See PWS 1.1.3.4. Additional Pickups) IDIQ. It states the contractor will be compensated at a unit rate based on the container size. How does the contractor price this separate service ? Blocks 19 through 27 do not provide a format to separately price for IDIQ (Indefinite Delivery/Indefinite Quantity) items/service. The CLIN structure does not provide a format to separately price this service.Refer to C11 responseWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
12See PWS 1.1.3.5. Container Relocations. Can the government provide the annual average number of container relocation requests by container type; Front End Loader and Roll Off? Is this intended to be a separately priced IDIQ service for each type of container?No average infoThe Incumbent Contractor has access to this historical data. This provides his/her company with an advantage because he/she knows how much time should be allocated for this task. It seems that if the government made the request to relocate, then they would have access to those records.See updated Appendix D
13See PWS 1.1.3.8.1 Off-Base Disposal of Composting Materials. Please provide the name of the composting site currently being used. How does the contractor price this separate service ? Blocks 19 through 27 do not provide a format to separately price for IDIQ (Indefinite Delivery/Indefinite Quantity) items/service. The CLIN structure does not provide a format to separately price this service.Refer to C11 responseWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
14See PWS 1.1.3.9. Saw Dust Collection - How does the contractor price this separate service ? Blocks 19 through 27 do not provide a format to separately price for IDIQ (Indefinite Delivery/Indefinite Quantity) items/service. The CLIN structure does not provide a format to separately price this service.Refer to C11 responseWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
15See PWS 1.1.3.10 Fuzz Box - What is the name of the landfill currently used to disposal of this material?Contractor provided informationCan the government provide the name of the landfill this material is currently disposed?No
16See PWS 1.1.6.1 - MFH Collection Stations and 1.1.8.1. MFH Refuse Containers. Can the government provide the historical average number of these container replacements needed annually for each (recycle and refuse)? We are trying to determine the total number of units, including extra containers, required for this task.No average infoThe Incumbent Contractor has this historical data. This provides his company with an advantage because he/she knows how much time should be allocated for this task. Can the government provide a Total of these base on government's request for these services?See updated Appendix D
17See PWS 1.1.10 Vehicle Weighing. The last sentence states the Contractor will be reimbursed by tipping fees according to submitted invoices. Blocks 19 through 27 do not provide a format to separately price The tipping fees. The CLIN structure does not provide a format to separately invoice for the tipping fees.Refer to C11 responseWhere do we find the "C11" response, and please define "C11"? What does "C" stand for? What is the page number and the document this reference to "C11" can be located?Cell C11 (Response to Q8)
18See PWS 1.1.11. Missed Pickups. If a collection station is blocked, obstructed, etc. when the collection vehicle arrives at the collection station, will the contractor be compensated for a required second trip back to that collection station to collect the previously blocked container within two (2) working hours?NoJust to clarify the question, when the collection station is blocked, obstructed, etc., this is no fault of the contractor. Please confirm that if it is no fault of the contractor, the contractor will still need to send a truck back to the collection station and service the collection station once the obstruction has been removed, and must do so before the next schedule collection day, and withing 2 hours of notice by the COR.Yes
19PWS 1.2. Recyclable Materials Processing. This states all recyclable commodities on this contract are picked up and delivered to Bldg. 10293. Does this include the Recyclables collected in the MFH area? PWS 1.2.3. also states the Base Recycle Center is to be used for all recycling on base.NoIn summary, this PWS paragraph should include " with the exception of the recycle items collection from the MFH areas", Correct?Reference question 7
20PWS 1.1.2.4 Bulk Pickup. How many bulk pickup days are required are required to be scheduled per year,(Once per month, one per quarter, etc.)?Contractor shall submit a proposed bulk item pick up schedule as part of the proposal packageCan the government provide the minimal number of bulk collections per year they will approve?Monthly
21PWS 1.3.1.Off Base Disposal. This paragraph seems to contradict other statement PWS 1.2. Please confirm the contractor will not be able to deliver MFH recyclable to the Base Recycle Center.NoDoes the government answer mean "No, the contractor is not allowed to deliver the MFH recycles collected to the Base Recycle Center"?Reference question 7
22PWS 1.1.3.3. Public/Common Use Receptacles (National Museum of the United States Air Force). How many of these small receptacles are at this location?As many as neededAs with all service tasks, this task takes time. Part 1, Can the government provide an estimate of the quantity in order for the contractor to equate the amount of time necessary to complete this task? The Incumbent Contractor has this historical data. This provides his company with an advantage because he/she knows how much time should be allocated for this task. Part 2, Can the government provide the number currently stationed at this location, or when there is no special event?32 page 36 of PWS
23PWS 1.1.3.8.1 Off-Base Disposal of Composting Material. Can the government provide historical data for this service? What is the average number of services that may be required per month, or per year?No average infoCan the government provide a Total of Services Off-Base Disposal of Composting Material, by month, or by option year. We can figure the average.No average info
24PWS 1.1.3.8.1 Off-Base Disposal of Composting Material. There is no pricing schedule for this IDIQ/on call service. How will the contractor provide a unit fee for this service?Refer to C11 responseWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
25PWS 1.1.3.8.1 Off-Base Disposal of Composting Material. What type and size container is used for this service?30CY Open TopOK
26PWS 1.1.3.9 Saw Dust Collection. How does the government identify the saw dust collection stations? Please provide the collection station descriptions, building numbers, and historical data for number of collections per year. How will the contractor propose a unit fee for this service in the current pricing schedule?2 stations currently - No average infoCan the government provide the total number Saw Dust Collections the incumbent provides each year. We can determine the average.No average info
27PWS 1.1.3.9 Saw Dust Collection. How does the government identify the saw dust collection stations? What type of container is used for this collection? FEL, Roll Off, VIP compactor, RO Compactor, etc.FEL currentlyOK
28PWS 1.4. Equipment Maintenance. Will the contractor be reimbursed for FEL and Roll Off container cleaning as detailed in PWS 1.4.1 (Maintenance and Repair of Government Furnished Containers)? Will the government reimbursement for contractor expenses incurred to send a truck to a collection site, swap it with another container, and haul the container to a repair site for maintenance and repairs, including exchanging condemned containers? How will the contractor be compensated for this service?Refer to C11 response. Fixed Price contract. Contractor must bid accordinglyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
29PWS 1.4. Equipment Maintenance. This states the contractor is required to keep the containers fee of unpleasant odors, dirt, debris, and pest. Please confirm the contractor's cost associated with cleaning is considered a reimbursable item and is part of overall equipment maintenance.Refer to C11 response. This will be a Fixed Price contract. Contractor must bid accordinglyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
30PWS 1.4.2. Bulk Container Cleaning. Will the contractor be reimbursed for FEL and Roll Off container cleaning. How does the contractor offer individual/single unit pricing for this service?Refer to C11 response. This will be a Fixed Price contract. Contractor must bid accordinglyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
31PWS 1.4.3. Other Municipal Solid Waste Container Cleaning-MFH. Please confirm the contractor is responsible for keeping the small common area (Turtle Pond) container clean. Is this a reimbursable requirement, and if so, how does the contractor offer an individual fee for the cleaning?Refer to C11 Response. This will be a Fixed Price contract. Contractor must bid accordinglyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
32PWS 1.4.4. Condemned Containers. How does the contractor provide individual/single unit priding for this service?Refer to C11 Response. This will be a Fixed Price contract. Contractor must bid accordinglyWhere do we find the "C11" response, and please define "C11"? What does "C" stand for?Cell C11 (Response to Q8)
33PWS Table A-2, Estimated Workload Data, Military Family Housing Area. This states there are 2, or more 32-36 gallon permanent container for Turtle Pond. "Or more" could be many. Please clarify the number of units.As many as neededAs with all service tasks, this task takes time. Can the government provide an estimate of the quantity in order for the contractor to equate the amount of time necessary to complete this task? The Incumbent Contractor has this historical data. This provides his company with an advantage because he/she knows how much time should be allocated for this task. Can the government provide the largest number of additional 32-36 gallon government furnished containers the government may add for special events as needed?2 or more - if housing has an special event a dumpster can be placed
34Reference Attachment 1, Additional Instructions to Offerors, Subfactor 3. Is the contractor required to provide the names and resumes with their proposal? It is customary to offer the current workforce their job when another contractor provides an award. Please clarify.YesWill this include the name and resumes for collection drivers, or just management/supervision/QC/Safety, etc.?All
35Reference PWS 1.1.2.5. On-Call Dumpster (MFH) Where do we price this item?Appendix D CLIN 1Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?See updated Appendix D
361.4.6. Preventive Maintenance of Government Provided Compactors How does the contractor price in the labor to provide maintenance of government owned compactors – no CLINAppendix D CLIN 1Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
371.1.3.6. On Call Collection (Asbestos), Can the government provide historical data for the number of services provided and the amount collected each year? Also, where does the contractor provide unit pricing for these items?Updated PWS 31 May 2022Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
38Reference 1.1.3.6. On Call Collection (Asbestos), Which landfill is currently being used for the disposal of this material?one that can legally per EPA accept asbestosOK
39Reference 1.1.3.7. Surge Requirement Capabilities Does the contractor provide the containers? What is the estimated container requirements? How does the contractor price this – no CLIN?No. Appendix D CLIN 1, CLIN 2 or CLIN 4Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
40Reference 1.1.6.2. On Call Collection, How does the contractor price these services – no CLINAppendix D CLIN 1, CLIN 2 or CLIN 4Where do they insert them? Appendix D in the revised PWS has not been reformatted into an Excel file with columns added for unit fee and extended prices. Should the contractor create an Excel document and add a column for unit fee and another for extended fee?Yes
41Reference 1.1.6.2. On Call Collection, What is the estimated quantities per year for compactors and front loadTable A-1Part 1, Per the government answer, the total estimated quantity is 788 each, (all areas). Per Appendix D, the government is asking the contractor to price 788 on call collections in CLIN 0001, 788 on call collections in CLIN 0002, and 788 on call collection in CLIN 0004. This totals 3 x 788 = 2,364 in all. Is the information in Appendix Correct, or is the information in Table A-1 correct? As stated, the contractor will be required to estimated the equipment needs, man-hours, etc. and everything in support of these costs to provide service to 2,364 On-Call Collections. Part 2 - How many of these on call collection are related to FEL compactors, regular FEL containers, and Roll Off containers (if applicable)?See updated Appendix D
42Reference PWS 4.2.1. Military Family Housing (Brick Quarters) and Turtle Pond. Is the contractor allowed to service this area with a Front End Loader with the use of a FEL carry can?not allowed to direct contractor on how to fulfill requirements outlined in PWS.Are the streets wide enough for the FEL to navigate them in a FEL with a carry can, in the government's opinion?Yes
43Reference PWS 1.1.8.1. MFH Refuse Containers, What are the acceptable colors meeting base architectural/appearance standards for the wheeled refuse and recycle carts?Colors have to be uniform for all containers as long as there is a distinction between the refuse and recycling containers. Example brown containers for refuse and blue containers for recycling.OK
44Reference PWS 1.1.8.1. MFH Refuse Containers, Please clarify that the 30 gallon plastic liners are for the small public/common cans only.YesOK
45Reference PWS 1.1.8.1. MFH Refuse Containers, If the refuse collection station, including carts, has material that exceeds the maximum length and weights in this statement, will the contractor be required to return to the collection station, once the weights and sizes are adjusted by the user, before the next scheduled service? If so, will the contractor be compensated for the 2nd trip to the collection station?Yes. NoIn summary, if the contractor can't provide a scheduled collection due to circumstances beyond his/her control, the contractor will be required to make a 2nd trip, even if the contractor is out of that area, or off base, in order to collect the MFH Refuse that has been resized and/or the weight has been adjusted by the MFH occupant so that it meets the PWS restriction requirement. Is this Correct? If not, please clarify.Yes
46Reference PWS 1.1.8.1. MFH Refuse Containers, As with many other items, the supply chains for container production are running behind and items are taking much longer to get delivered after the orders have been placed. Can the government estimate the amount of time the contractor will have from the time of award to the actual start date?NoOK
47Reference PWS 1.1.1.2. Food Waste, Can the government identify all containers used to dispose food? The higher frequency of cleaning food waste containers will generate more manhours in support of this task.No potentially most containers could contain food.PWS 1.1.1.2 Food Waste and 1.4.2. Bulk Container Cleaning. The last sentence in 1.1.1.2 states Food Waste containers and pickup days are identified in Appendix A, Table A-1. The food waste containers are not identified from all of the other containers in this table. It is normal for the government to identify those that will need a higher requirement for scheduled cleanings because they commonly contain an amount of food that would justify additional cleanings per year, which equates to more costs. Please provide building Numbers if possible. !.4.2 states the food containers shall be cleaned at least monthly.....No potentially most containers could contain food.
48Reference PWS Appendix D. What is the building number for the commissary, the size/cubic yard capacity of the compactors, and the collection schedule for these compactors?Reference PWSPlease reference the added Roll Off Compactor Service scheduled added to the revised PWS. This references the Commissary as building 31250-2. According to Appendix D, The Commissary if building 1250-2. Please explain the difference with the building number references.It's the same building
49Reference PWS Appendix D and PWS 1.1.3.9. What is the building number for the sawdust container(s) the cubic yard capacities, and the collection schedule for these containers?Reference PWSOKSee updated Appendix D
50Reference PWS Appendix D. This table does not reference MFH tipping fees. Where should the contractor detail the tipping fee costs?There's no tipping feePlease provide the government's definition for Tipping Fees and
51Reference PWS 1.1.8.1. and Appendix D and PWS Table A-2. Please explain the reference to Monthly Rental of Wheeled-Curbside Refuse and Wheeled-

Curbside Recycling Toters (100 Recycling/50 Refuse), (PWS 1.1.8.1) *Estimate based on rental of 150 toters per year

@ $32.50 per toter. PWS Table A-2 states that all units will receive one refuse cart and one recycle cart.Currently we pay a monthly rental fee for the totersPlease reference PWS 1.1.8.1. Explain why the current rental fee is referenced in the Appendix D statement. The contractor is responsible for purchasing and providing the Toters. Also, the reference to 100 Recycling and 50 Refuse Toters does not agree with the contractor's requirement to provide 1 Refuse Toter(96 gallon) and 1 Recycle Toter(96 gallon). This equates to more than 50 Refuse Containers. Please clarify.See updated Appendix D
52Reference PWS Appendix D, CLIN 0003 MFH. Which county are the MFH units located? Green or Montgomery, or both? Please explain the reference to both counties for Generation FeesDepends on where you off load the refuseIs the generation fee determined by the county the landfill is located, or the county where the containers are located/stationed that generates/collects the refuse? Please clarify.Depends on the county the refuse was removed from, Montgomery or Greene county.
53Reference PWS Appendix D, CLIN 0003 MFH. There is no reference to Sanitary Disposal Fees in the CLIN. Please explainNo Sanitary fee charged for MFHPlease define Sanitary Disposal Fee for the purpose of the solicitation.See updated Appendix D
54Reference PWS Appendix D, CLIN 0003 MFH. Why is the reference to Generation Fee for Montgomery County set at 5,990 Tons? Should this amount be more in line with the historical data in PWS Table A-2?HistoricalPWS Table A-2 Estimate Workload Data provides an annual estimated quantity of 84.72 Refuse tons for the MFH. Why is this referenced as 5,990 Tons referenced in Appendix D for CLIN 0003 MFH? Please clarify.Historical
55Reference PWS Appendix D. Why are the quantities in this Appendix repeated several time in each of the four CLINS, which are associated with the four different organizations. It seems that all of the information in the Appendix should be in quantities in line with historical data on file for each task (possibly Sub CLIN), although not referenced as SubClins.HistoricalJust to confirm the government's answer, the quantities for each, the CE, the museum, and the Medical Center, all happen to be the same quantity for each year, historically. Is this correct?See updated Appendix D
56Reference PWS Appendix D. Why are some of these descriptions referenced as 6 months and other referenced as 12 months?HistoricalUnless the Generation Fee and the Sanitary Disposal Fees are only collected 6 months of the 12 month period/year, this does not make sense. Can the government please clarify/explain this?See updated Appendix D
57Reference Solicitation, Far Clauses Incorporated. Will the government allow for equitable adjustments for Fuel, considering the volatility of fuel prices during this time?economic adjustment clause not included in contractOK
58Reference Solicitation, Will the government consider changing the pricing for tipping fees, including environmental fees, generation fees, etc., to a cost reimbursable item? This will factor out these costs from the price proposal and will not allow for markup to these fees. They will then be invoiced as a pass through at zero profit.It is already a reimbursable item- The contractor will provide the documentation showing those fee's on the tickets.Part 1 - If all associated landfill disposal fees, tipping fees, generation fee, environmental fees, landfill fuel surcharge fees, and any other fees the landfill, and/or any other governing agency may charge related to hauled waste is reimbursable, then the government will reimburse the contractor for all of these types of fees in the exact amount of the fees listed/detailed on the disposal tickets and/or any other form of invoice. Is this correct? Part 2 - If so, then why are the quantities for these items listed on Appendix D? Part 3 - Is it just for general information?It is already a reimbursable item- The contractor will provide the documentation showing those fee's on the tickets.
59Reference PWS 1.1.8.1. and Appendix D and PWS Table A-2 concerning MFH refuse and recycle wheeled carts. Will the government require any form of signage (recycle logo, container number, etc.) or any other information to be displayed on the refuse and recycle carts? If so, please provide details.Recycling logo will need to be placed on containersOK
60Reference PWS 1.5.1. MFH Weigh Slips. Will the contractor be required to go directly to the landfill after collections are completed in the MFH areas? Will the contractor be able to convert the number of MFH stations collected to weights with the use of a conversion factor.1. Can't direct the contractor on how to perform their contract. 2.The contractor should be able to provide weights based off of the tickets from the landfillPart 1 - Reference PWS 1.5.1 Weigh Slips. Will the government allow the contractor to collect the refuse in the MFH area Toters and then finish loading the collection vehicle by emptying front end load refuse containers on the installation? Part 2 -Will the contractor be required to weigh the collection vehicle after the MFH collections in order to determine the exact number of tons collected in the MFH areas?Contractor must be able to provide tonage for MFH
61Reference PWS 1.1.10 Vehicle Weighing. Will all collection vehicles be required to be completely empty before entering the base, or from gate to gate?NoOK
62Reference PWS 4.6.1 Contract Manager. Can the Contract Manager, Quality Control Person, and Security Manager be the same employee? Will these positions, together or combined, be allowed to drive a collection vehicle (Front End Loader, Roll Off Truck, FEL Container Carrier, or any other collection vehicle) on a regular basis?Can’t direct the contractor on how to fill their positionsOK
63Reference PWS Table A-1. Item # 3, Compost/Yard Waste Material. Does any of this noted 118 Tons Annual Average come from the MFH area?NoOK
64Reference PWS Table A-2, Does the 84.72 Refuse Ton for MFH include Compost/Yard Waste Material? If not, can the government provide the average Yard Waste Tons Collected annually in the MFH area?NoOK
65Reference PWS 1.1.2.4, Bulk Item Pickup. Is there a maximum weight and/or length restriction associated to these Bulk items?NoJust to clarify, is the government saying the contractor must service the Bulk Items no matter how large or heavy they are?Correct
66Reference PWS 1.1.8.1 MFH Refuse Containers. Is there a maximum weight restriction per wheeled cart associated to these collections? Overloading these carts can cause damage to the contractor furnished carts.Contractor will need to provide that information to the government to provide to customersOK, examples include placing driveway sweeping, dirt, landscape rocks/stones, discarded grass sod, etc.Contractor must provide weight restrictions to the government
67Reference PWS 1.1.8.1 MFH Refuse Containers. Is there a maximum weight restriction per container associated to these collections in other customer provided containers, boxes, tied bundles, etc.?NoPart 1, Is the government stating the contractor must collect any weight and any size container the MFH may set out in other than the 96 gallon Toters, but the contractor must service those items the MFH residents set out in there own furnished containers, boxes, tied bundles, etc.? Part 2, If the resident sets out items in cardboard boxes, or other containers that will not contains the heavy debris when lifted, will the contractor be required to clean up the spill because that may occur in the event that container fails? Part 3, This happens when cardboard boxes are used and they get wet due to wet/rainy weather.Part 1 - Yes, Part 2 - Yes
69Reference Attachment 1, Additional Instructions to Offerors, Subfactor 3. Is the contractor required to provide the names and resumes with their proposal? Please clarify in view of the Nov 18, 2021 Non Displacement of Qualified Workers "Section 1. Policy. When a service contract expires, and a follow-on contract is awarded for the same or similar services, the Federal Government’s procurement interests in economy and efficiency are best served when the successor contractor or subcontractor hires the predecessor’s employees, thus avoiding displacement of these employees. Using a carryover work force reduces disruption in the delivery of services during the period of transition between contractors, maintains physical and information security, and provides the Federal Government with the benefits of an experienced and well-trained work force that is familiar with the Federal Government’s personnel, facilities, and requirements. These same benefits are also often realized when a successor contractor or subcontractor performs the same or similar contract work at the same location where the predecessor contract was performed."YesRepeated Question. Understood
701. Pg. 79 of the Solicitation document includes 252.237-7024 Notice of Continuation of Essential Contractor Services and the requirement to include a written plan to perform essential services with our Offer.
71a) In which volume of the solicitation should this plan be included?Volume IIOK
72b) Does this plan count towards any of the page limitations?Refer to Additional Instructions to OfferorOK
73c) Will this plan be evaluated? It is not included in any of the evaluation criteria.Please refer to Addendum to Evaluation FactorsOK
74Additional Instructions to Offerors, Subfactor 3 – Contractor Employees – Subcontractors states: “Provide company names, resumes, and other personal information requested to obtain a successful (NAC) National Agency Check of contractor employees and any subcontractors they intend to use to fulfill the requirements of the PWS.” We usually hire the incumbent’s employees or recruit locally upon contract award accordingly we do not have the names or resumes of potential employees to submit along with our response. Would it be sufficient to provide our hiring criteria, experience requirements and background checks that are performed prior to bringing on employees to work on military base contracts, in lieu of names and resumes?
Must provide information requested in Subfactor 3Repeated Question. OK understood
75Additional Instructions to Offerors, Subfactor 5 Prior experience. The Description paragraph of this section states “This subfactor will evaluate the offerors prior experience for a minimum of two relevant residential maintenance and repair contracts/jobs..” residential maintenance and repair is not relevant to this project and the requirement for this experience should be removed.Verbiage updatedOK, It is our practice, and the federal law, to offer the incumbent's employees employment opportunity, if we feel they meet our high standard and qualifications. Of course, we will provide employees in the event the incumbent's employees assigned to this project wishes not to accept our offer.
761) PWS 1.1.3 Over and Above Requirements, there are many different over and above requirements described in this section of the PWS and the paragraph states that the services shall be priced separately, however there are no separate CLINS to price for these services and nowhere to put the pricing in either Attachment 5, the excel price sheet, or the Supplies or Services & Prices or Costs table included in the solicitation. Please provide separate line items to price for the various Over and Above requirements:Appendix D CLIN 1The government response here confirms that pricing will need to be inserted in Appendix D, (CLIN 0001 for CE related tasks). Again, it appears the contractor will be required to customize Appendix D to include a column in order to insert a unit fee and another column to compute and provide the extended fee for each year/option. It seems this same process is to be used on all four CLINS on Appendix D. Is the government OK with the contractor customizing and converting this PDF to an Excel file and providing detailed priced on it for those items that require inserted prices?Yes
v Unscheduled Pickup & Special Event
v Construction & Demolition Debris
v Public Common Use Receptacles
v Additional Pickups
v Container Relocations
v Asbestos Collection
v Surge Requirements
v Compost Disposal
v Saw Dust collection
v Fuzz box Collection
771) PWS Appendix A Table A1 vs Appendix D. There are tremendous inconsistencies between the quantities provided in Table A1 and Appendix D for the same material types.These are estimate only no changes necessaryThe contractor must equate total contract cost based on the estimates provided by the government. It would be more professional, an accurate, for the government to use quantities that are in line with actual historical data. It would seem more reasonable for the government to take annual totals based on historical data for each service task, adjust that total by the government's estimate of predicted increases, or decreases, over each option year, and have the contractor base their estimated operating costs on those realistic quantities. Will the government 0lease consider doing this?See updated Appendix D
78§ Table A1 states Industrial solid waste tonnage as 2,946 per year, Appendix D shows waste generation fees for Montgomery County only as CLIN 0001 5,990 ton, CLIN 0002 5,990 ton, CLIN 0003 5,990 ton- total 17,970 tonsDoes the government understand the Totals in Appendix A, Table A-1 Estimated Workload Data, do not reconcile with the data in Appendix D? These are not even close. Which of these documents should the contractor use to determine the workload? We understand the expenses for all landfilled material are to be reimbursed based on actual invoices from the landfill / county, and/or other governing agencies. We are more concerned about the Tons as it relates to anticipated workload.See updated Appendix D
79§ Table A1 states 118 tons/ per year of Compost/Yard waste CLINS 0001, 0002 and 0004 each show 5,571 tons of compost for a total of 16,713 tons.Does the government understand the Totals in Appendix A, Table A-1 Estimated Workload Data, do not reconcile with the data in Appendix D? These are not even close. Which of these documents should the contractor use to determine the workload? We understand the expenses for all landfilled material are to be reimbursed based on actual invoices from the landfill / county, and/or other governing agencies.See updated Appendix D
80§ Table A1 states C&D 1,565 tons per year CLINS 0001, 0002 and 0004 each show1,500 cubic Yards for a total of 4,500 cubic yards.Does the government understand the Totals in Appendix A, Table A-1 Estimated Workload Data, do not reconcile with the data in Appendix D? These are not even close. Which of these documents should the contractor use to determine the workload? We understand the expenses for all landfilled material are to be reimbursed based on actual invoices from the landfill / county, and/or other governing agencies.See updated Appendix D
81Could you please correct these discrepancies so that we can accurately estimate total disposal cost and disposal cost per CLIN.
82Is the current contract SOW the same as the current contract or is this SOW different in some ways? What ways?Same SOWDoes the current contract contain the same references to recycling tasks as this new PWS contains?Yes
83Page 34 of the solicitation refers to “refuse/yard/recycling” as type of materials hauled from each of the MFH units. It also reads “Each MFH unit has one (1) Contractor provided curbside container, and one (1) Recycling bin. There is no limit on the number of other containers an individual may use, if provided by the resident.”. Typical would be one container for single stream recycling and one container for refuse.
84a. Is yard waste required to be hauled if residents provide their own container? It would not be mixed with single stream recycling, correct?Yes, up to contractor
85b. Are 3 containers per MFH actually required (MSW, yard waste, single stream recycling)?There is no limit on amount of containers an individual may use.As a note, the main concerns we have for the customer provided containers is when the customer using cardboard that breaks apart, especially if they are not heavy duty enough to contain heavy debris, and more so if they get wet after they are set out. Also the use of thin mil plastic bags that is not strong enough to contain the debris. Who must clean up spills related to customer furnished contains that will not contain the debris when the contractor lifts them from the curb?Contractor
86c. Page 3 Section 1.2.2.2 Recycling (Military/Family Housing) references paragraph 1.2.1 Materials for recyclables and 1.2.1 Materials lists only metal, cardboard and wood. Are those the only commodities being collected as recycling from MFH?There is no 1.2.2.2 but 1.1.2.2. References MFH recycling and occupants will recycle commodities as listed on the recycling containers provided by contractor. 1.2.1 Lists the most common recyclables.Is the contractor required to list the items they will accept as signage on the Recycle Carts? Please clarifyYes
87Page 34 “Recyclable Commodity” and the 24.24 tons estimated annually refers to single stream recycling only? Or is this in reference to metal, wood and cardboard?Annual estimate for recyclables from MFH.OK
88In Table A-1.1, are all the front load containers listed as 7cyd actually 8cyd containers? (If so then the total of 8cyd containers is 135, as referenced on page 38 of the solicitation).YesOK
89Section 1.1.1.2 Food Waste notes designations of containers in Appendix A, Table A-1 but that table has no designation for which containers would have food waste. Would all of these front load containers possibly contain food waste?Possibly???, Answers to questions in the previous solicitation of 5 years ago listed those building in the Q & A's. Can the government list the building numbers for facilities that prepare and serve food?Facilities changes all of the time
90Does section 1.1.2.3 Compostable Organics (Military/Family Housing) refer to yard and wood waste placed inside the container supplied by the contractor for recycling or is this separate from the container referenced in 1.2.1? Would wood and yard waste be put inside any container?
91a. This once per week pick up, is this in addition to the refuse pick up and the recycling pick up?We cannot schedule contractors work?
92How many 8cyd containers need be kept to satisfy section 1.1.2.5 On-Call Dumpster (Military/Family Housing)? Are these contractor furnished 8cyd containers?As many as needed. No.OK
93How many containers does Section 1.1.3.3 refer to? What is the schedule? (not referenced in Appendix A)As many as needed for common grounds of NMUSAF. Depends on number of visitors to the NMUSAF. The NMUSAF has over a million visitors a year.?
94What size containers is Section 1.1.3.8.1 Public/Common Use MSW Receptacles (National Museum of the United States Air Force) referring to and how many containers? These are separate from any of the front load containers in Appendix A?1.1.3.8.1 does not refer to the NMUSAF. 1.1.3.8.1 Refers to 30CY open top.
95Section 1.1.3.9 Saw Dust Collection refers to Appendix A Table A-1 but there is no reference for locations there for saw dust collection.2 to 3 saw dust containers currently and they are 8CY FEL containers.OK
96What kind of containers are used for “Fuzz Box Collection”, Section 1.1.3.10 Fuzz Box collection?8CY FELOKCorrection***42CY closed roll off*****
97How many “public/common area” locations need to be emptied, referenced in Section 1.1.6.1 MFH Collection Stations?As many as needed.?
98a. What size are those containers?. 36 gallon.OK
99b. What commodities are collected?Refuse.OK
100c. Are these the 36-gallon containers talked about in Section 1.1.8.1 MFH Refuse Containers?Yes.OK
101Are all front load containers and VIP compactors in Table A-1.1 MSW or are some recycling?
102a. If so which are which and what recycling is being collected?Industrial Solid Waste.OK
103Section 1.1.8.1 MFH Refuse Containers refers to the 100 MFH refuse and 100 MFH recycling containers or are these additional containers?The contractor shall provide all curbside containers, consisting of refuse containers: 96 gallon capacity wheeled containers with lid, meeting the base architectural/appearance standards, and recycling containers that shall be 96 gallon containers, with wheels and lids, and be clearly discernable from the refuse curbside containers.OK
104a. Are these containers that would be used for the wood and yard waste in section 1.1.2.3 Compostable Organics (Military/Family Housing)?NoOK
105b. How many containers would be needed, is it also 100?NoOK, (NOT FOR WOOD)
106All front load containers and VIP compactors are government-furnished?YesOK
107Are all 20cyd open tops, 30cyd open tops, 30cyd compactors and 42cyd compactors listed on page 38 government owned?YesOK
108a. Is there a map for location and a table for frequencies of hauls and for types of materials in addition to the annual tonnage in Table A-1?Updated PWSOK
109In reference to Section 1.2.1 Materials, is there an all-inclusive list of what materials will be collected that are to be considered recyclable?No.PWS 1.2.1. Materials. It goes on to state the materials as metal, cardboard, and wood that shall be recycled. It also states the contractor may collect and transport materials not listed above….... I assume these 3 items are the only one the contract must collect and transport. Is this correct?No
110a. Do materials have to be transported in 30cyd open tops or could a different vehicle be used?30CY open top and 30CY compactor is what the government provides.OK
111Section 1.2.2 Pickup Points refers to locations on Table B-2 in Appendix A but that table is a map of the Military Family Housing and has no locations indicated.1.2.2. Refers to Appendix B table B-2 map for MFH containers locations.OK
112Section 1.4.2 Bulk Container Cleaning dictates monthly cleaning of food containers. How many containers is this and what size are they?As needed to remove odors. 8CY or 30CY.????, Need to know in order to determine the total man-hours needed to meet the government minimal frequency of cleaning requirementsQuanities change oftern
113Are there mandatory days/hours during which the contractor is expected to man the Base Recycling Center?Contractor does not man the recycling centerOK
114a. What are those hours? Or is the contractor only expected to collect and drop off recyclable materials which the government will then store/ship/dispose of?Contractor drops off.OK
115Are all contractor employees required to obtain a Class B CDL License (page 24 Section 4.11) or only those driving vehicles which require it?Drivers are required to have Class B CDL.OK
116What is the process currently for collection/sorting/baling recyclable commodities from MFH through the Recycling Center?MFH recyclable commodities do not go to recycling center.OK
ADDED QUESTIONS BELOW
117Reference Appendix D - All references to Sanitary Disposal Fees - Why are these referenced as 6 Months rather than 12 Months? The base and option years equate to 12 months each.6 or 12 month reference is just a referenece. contractor should invoice monthly for disposal fees.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .