Attachment 15 - 711HPW Non-Standard Mech Systems.pdf

PDF 84 KB Posted

Attached to
CE Facility and Equipment Support
Solicitation number
FA860122R0012
Issued by

View the file

Other files

File Type Posted
Amendment 8 - Questions_Answers.docx DOCX document
Solicitation Amendment FA860122R00120008 SF 30.pdf PDF
Amendment 7 - Questions_Answers - 14Sep.docx DOCX document
Attachment 4 - Mech Support Contract Equipment List 13 Sep 22.xlsx XLSX spreadsheet
Solicitation Amendment FA860122R00120007 SF 30.pdf PDF
Attachment 2 - Bid Schedule 1 Aug 22 update.xlsx XLSX spreadsheet
Solicitation Amendment FA860122R00120005 SF 30.pdf PDF
Attachment 4 - Mech Support Contract Equipment List 1 Aug 22 - updated.xlsx XLSX spreadsheet
Solicitation Amendment FA860122R00120004 SF 30 - signed.pdf PDF
Solicitation Amendment FA860122R00120006 SF 30 - signed.pdf PDF
RFI Procedures-Questions-Answers - AMENDMENTS - 8June.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers - AMENDMENTS - 7June-updated.xlsx XLSX spreadsheet
Attachment 8 - Wage Determination 9May22.pdf PDF
Solicitation Amendment FA860122R00120003 SF 30.pdf PDF
RFI Procedures-Questions-Answers - AMENDMENTS - 7June.xlsx XLSX spreadsheet
Attachment 1 - Instructions to Offerors and Evaluation Criteria_1Jun22.pdf PDF
RFI Procedures-Questions-Answers - AMENDMENTS - 6 June.xlsx XLSX spreadsheet
Attachment 13 - PastPerformance_Questionnaire - 2 June.pdf PDF
Attachment 2 - Bid Schedule - 6 June 22.xlsx XLSX spreadsheet
Attachment 13 - PastPerformance_Questionnaire - 2 June.docx DOCX document
Attachment 3 - PWS 2023 CE Support 31May22.pdf PDF
Solicitation Amendment FA860122R00120002 SF 30.pdf PDF
RFI Procedures-Questions-Answers - 6June.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers - 31May.xlsx XLSX spreadsheet
Attachment 2 - Bid Schedule 24 May 2022.xlsx XLSX spreadsheet
Solicitation Amendment FA860122R00120001 SF 30.pdf PDF
Attachment 4 - Mech Support Contract Equipment List 24 May 22.xlsx XLSX spreadsheet
Attachment 5 - Building Numbers - 25 May 22.xlsx XLSX spreadsheet
Attachment 3 - Performance Work Statement CE Support 25May22.pdf PDF
RFI Procedures-Questions-Answers - 25May.xlsx XLSX spreadsheet
Attachment 13 - PastPerformance_Questionnaire.docx DOCX document
RFI Procedures-Questions-Answers - 24May.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers - 23May - Rev3.xlsx XLSX spreadsheet
RY_Lab_Software_Presentation 2021.pptx PPTX presentation
RFI Procedures-Questions-Answers - 23May.xlsx XLSX spreadsheet
Attachment 13 - PastPerformance_Questionnaire.docx DOCX document
RFI Procedures-Questions-Answers - 19May.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers - 17May.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers - 16May.xlsx XLSX spreadsheet
RFI Procedures-Questions-Answers.xlsx XLSX spreadsheet
Attachment 13 - PastPerformance_Questionnaire.pdf PDF
Attachment 4 - Equipment List 2023.xlsx XLSX spreadsheet
Attachment 3 - PWS 2023 CE Support Contract 5May2022.pdf PDF
Attachment 12 - Site Visit Info and Map.pdf PDF
Attachment 7 - Over and Under 2500 Procurement Report.pdf PDF
Attachment 10 - CDRLs 26Apr22.pdf PDF
Attachment 5 - Bldg_Numbers.xlsx XLSX spreadsheet
Attachment 14 - Subcontractor_Consent_Letter.docx DOCX document
Attachment 1 - Instructions to Offerors_Evaluation Criteria.pdf PDF
Attachment 9 - Base_Facility_Standard_Appendices.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Below is a listing of 711th Human Performance Wing facilities that have non-standard mechanical systems present.

Building 248

- Aging Mechanical systems, some items dating back to 1950’s. Requiring frequent corrective maintenance items.

Building 837

– Requires daily management of HVAC control systems

- Predominately a wet laboratory facility. Contains 36 critical labs supported by 2 mechanical systems requiring strict control of temperature, humidity, and pressure relationships 24/7.

- 30 chemical Fume hoods/Bio hoods exhaust systems throughout facility connected to laboratory air handlers.

-RO water system with distribution to various laboratories.

-Laboratory VAV Water intrusion mitigation system with drain pans and condensation pumps.

Building 838

- Vivarium facility. Includes 35 chemical wet labs, supported by 8 mechanical systems/5 humidifiers which strictly maintain temperature controls, humidity controls, and pressure relationships 24/7, which will change depending on specimens present. Including strict periodic maintenance coordination, as well as, maintaining Vivarium driven certification documentation required by Vivarium for certifications.

- Low pressure steam system serving equipment throughout facility.

- 3 Fume, 2 bag-in/bag-out, and 2 chemical hood exhaust systems throughout facility.

- Multiple RO water system with distribution to each holding room, and humidification.

- HEPA filter maintenance required.

Building 840

- Wet labs throughout facility with chemical fume hood exhaust systems and laboratory air handler supply systems. ~220 Exhaust valves and ~130 Supply valves are to be maintained as well as supporting control systems. ~11 high plume laboratory exhaust fans must be maintained to ensure proper pressure is maintained in lab exhaust systems.

- Biosafety Level 3 laboratories. One located within building 840, and one in an adjacent modular building. HEPA filter, bag-in/bag-out system. Pressure must be maintained between rooms and corridors to ensure there is no escape of biological agents. These areas undergo CDC inspection requiring detailed maintenance records of all supporting equipment.

- Biosafety Level 2 laboratories. Epidemiology processing laboratories. Multiple walk-in coolers and freezers. Laboratory space must maintain strict temperature and humidity control for accurate processing. Detailed maintenance records must be maintained for CAPP accreditation.

- Eyewash stations and thermostatic mixing valves for maintaining proper tempered water throughout labs.

- Ultra Pure RODI water system serving laboratories throughout the building.

- Building wide water softening system.

- Three 3,235 MBTU natural gas water heaters for heating hot water loop.

- Clean steam generation boilers. Produces steam below 15 PSI for laboratory air handler supply humidification.

Building 850, 851, 852

- Centralized chilled water system that serves comfort cooling air handlers and multiple process chilled water loops for laboratory loads in all three buildings. Valves, pumps, and controls must be maintained to ensure correct pressures are available to each process chilled water loop.

- Water softening system serving all three buildings.

All facilities require strict adherence for hot and chilled water loop chemical treatment and testing, strainer cleaning and VAV preventive and corrective maintenance.

File details come from the government source that posted it. Updated .