CLIN Structure- Solicitation FA860120R0045.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Building 28 Furniture Federal contract opportunity
- Solicitation number
- FA8601-20-R-0045
About this file
This combined synopsis and solicitation requests proposals for office furniture for the Air Force Materiel Command Lifecycle Management Center located at Wright Patterson Air Force Base. Required furniture includes systems, seating, executive, conference, and lounge furniture to outfit basement, first, second, and third floor spaces. Proposals are due by September 4, 2020, with furniture delivery and installation scheduled to occur in three phases concluding in September 2021. Offerors must provide fixed pricing for furniture and an hourly rate for up to 8,000 square feet of storage space. The award will be a firm-fixed price contract to the responsible offeror providing the best overall value based on technical quality and price factors.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLINs and SLINs
| lineItemBase | lineItemExtension | lineItemType | productServiceDescription | optionLineItem | itemUIDRequired | productOrServiceCategory | productType | fobPoint | paymentMethod | unitedNationsCode | periodOfPerformanceStart | periodOfPerformanceEnd | buyingCurrencyValue | buyingCurrencyExchangeRate | quantity | unitOfMeasure | unitPrice | priceBasis | pricingArrangementBase | estimatedCost | awardFee | fixedFee | targetFee | targetCost | targetProfit | ceilingPrice | initialTargetCost | initialTargetProfit | profitFloor | profitCeiling | basePrice | firmPrice | governmentSharePercentage | governmentShareCapAmount | governmentShareDescription | contractorSharePercentage | contractorShareCapAmount | contractorShareDescription | northAmericanIndustryClassificationSystemNaics | productServiceCode | projectCode | federalSupplyClassificationCode | standardIndustryClassificationSICCode | federalSupplyScheduleFSSItemNumber | specificationNumber | drawingNumber | testSpecificationNumber | acquisitionProgramUniqueIdentifierApuid | |
| CLIN | SLIN | Line Item Type | Description | Option | UID Required | Product Or Service | Product Type | FoB Point Type | Party to Pay Transportation Cost | United Nations Code | PoP Begin | PoP End | Currency | Exchange Rate | Quantity | Unit of Measure | Unit Price | Cost Constraints | Pricing Arrangement | Estimated Cost | Award Fee | Fixed Fee | Target Fee | Target Cost | Target Profit | Ceiling Price | Initial Target Cost | Initial Target Profit | Profit Floor | Profit Ceiling | Base Price | Firm Price | Government Share - Share Percentage | Government Share - Cap Amount | Government Share - Description | Contractor Share - Share Percentage | Contractor Share - Cap Amount | Contractor Share - Description | NAICS | PSC | Project Code | Federal Supply Classification Code | Standard Industry Classification (SIC) Code | Federal supply schedule (FSS) Item Number | Specification Number | Drawing Number | Test Specification Number | Acquisition Program Unique Identifier (APUID) | |
| Action Type | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| Acceptance Address Type | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| Inspection Address Type | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| Acceptance and Inspection Address Type | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| DoDAAC | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| Organization Address Name | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| POC Name | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| POC Phone Number (+ext.) | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| POC Email | Inspect/Accept - | ||||||||||||||||||||||||||||||||||||||||||||||||
| Location Type | Inspect/Accept - |
Address Location
| Category | Inspect/Accept - |
| Country | Inspect/Accept - |
| Country Code | Inspect/Accept - |
| Recipient | Inspect/Accept - |
| Attention Line | Inspect/Accept - |
| Post Office Box | Inspect/Accept - |
| Address 1 | Inspect/Accept - |
| Address 2 | Inspect/Accept - |
| City | Inspect/Accept - |
| Military/Federal Overseas City | Inspect/Accept - |
| Foreign City | Inspect/Accept - |
| State / Province | Inspect/Accept - |
| Military/Federal Overseas State | Inspect/Accept - |
Foreign
| State / Province | Inspect/Accept - |
| U.S Zip Code | Inspect/Accept - |
| Zip Code Extension | Inspect/Accept - |
| Foreign Postal Code | Inspect/Accept - |
Instructions
| 0001 | CLIN | Example CLIN | Yes | Yes | Product | Real Property | Delivery information entered in columns BA-CM will create a NEW delivery entry in IDEAS upon import | Inspect information entered in columns CN-DO will create a NEW Inspect address entry in IDEAS upon import | ||||||||
| 0001 | AA | SLIN (Separately Identified) | Example SLIN | No | No | Product | Real Property | Accept information entered in columns CN-DO will update the existing Accept address in IDEAS upon import | ||||||||
| 0001 | CLIN | WS-1: 8' x 6' Workstation 64" - 70" High, in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0001 | AA | SLIN (Separately Identified) | WS-1: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 14 Phase 1 - Second Floor Qty: 33 | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0001 | AB | SLIN (Separately Identified) | WS-1: To be delivered Phase 2. Phase 2 - Basement Qty: 50 Phase 2 - First Floor Qty: 46 Phase 2 - Second Floor Qty: 18. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0001 | AC | SLIN (Separately Identified) | WS-1: To be delivered Phase 3. Phase 3: First Floor Qty: 16 Phase 3 - Second Floor Qty: 73 Phase 3 - Third Floor Qty: 57. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0002 | CLIN | WS-2: 12' x 8' Boss Box 78" - 82" High in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0002 | AA | SLIN (Separately Identified) | WS-2: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 5 Phase 1 - Second Floor Qty: 7. | |||||||||||||
| No | No | Product | Real Property | 12 | Each | Firm Fixed Price | 7110 | |||||||||
| 0002 | AB | SLIN (Separately Identified) | WS-2: To be delivered Phase 2. Phase 2 - Basement Qty: 10 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 10 | Each | Firm Fixed Price | 7110 | |||||||||
| 0002 | AC | SLIN (Separately Identified) | WS-2: To be delivered Phase 3. Phase 3 - First Floor Qty: 3 Phase 3 - Second Floor Qty: 2 Phase 3 - Third Floor Qty: 4. | |||||||||||||
| Yes | No | Product | Real Property | 9 | Each | Firm Fixed Price | 7110 | |||||||||
| 0003 | CLIN | WS-3: 8' x 2' Hot Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0003 | AA | SLIN (Separately Identified) | WS-3: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 2 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0003 | AB | SLIN (Separately Identified) | WS-3: To be delivered Phase 2. Phase 2 - Basement Qty: 2 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0003 | AC | SLIN (Separately Identified) | WS-3: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 1 Phase 3: Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0004 | CLIN | WS-4: 7' x 7' Workstation 64" - 70" High in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0004 | AA | SLIN (Separately Identified) | WS-4: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 22. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0005 | CLIN | CH-1 : Mesh Back Upholstered Seat Task Chair in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0005 | AA | SLIN (Separately Identified) | CH-1: To be delivered Phase 1. Phase 1 - Basement Qty: 8 Phase 1 - First Floor Qty: 21 Phase 1 - Second Floor Qty: 66. | |||||||||||||
| No | No | Product | Real Property | 95 | Each | Firm Fixed Price | 7110 | |||||||||
| 0005 | AB | SLIN (Separately Identified) | CH-1: To be delivered Phase 2. Phase 2 - Basement Qty: 62 Phase 2 - First Floor Qty: 48 Phase 2 - Second Floor Qty: 64. | |||||||||||||
| No | No | Product | Real Property | 174 | Each | Firm Fixed Price | 7110 | |||||||||
| 0005 | AC | SLIN (Separately Identified) | CH-1: To be delivered Phase 3. Phase 3 - First Floor Qty: 35 Phase 3 - Second Floor Qty: 85 Phase 3 - Third Floor Qty: 61. | |||||||||||||
| Yes | No | Product | Real Property | 181 | Each | Firm Fixed Price | 7110 | |||||||||
| 0006 | CLIN | CH-2 : Perforated Back Upholstered Seat Light Task Chair, Fixed Arms/Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0006 | AA | SLIN (Separately Identified) | CH-2: To be delivered Phase 1. Phase 1 - Basement Qty: 3 Phase 1 - First Floor Qty: 2 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 5 | Each | Firm Fixed Price | 7110 | |||||||||
| 0006 | AB | SLIN (Separately Identified) | CH-2: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 6. | |||||||||||||
| No | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||||||
| 0007 | CLIN | CH-3: Perforated Back Upholstered Seat Guest Chair, Armless, on Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0007 | AA | SLIN (Separately Identified) | CH-3: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 10 Phase 1 - Second Floor Qty: 18. | |||||||||||||
| No | No | Product | Real Property | 28 | Each | Firm Fixed Price | 7110 | |||||||||
| 0007 | AB | SLIN (Separately Identified) | CH-3: To be delivered Phase 2. Phase 2 - Basement Qty: 20 Phase 2 - First Floor Qty: 8 Phase 2 - Second Floor Qty: 2. | |||||||||||||
| No | No | Product | Real Property | 30 | Each | Firm Fixed Price | 7110 | |||||||||
| 0007 | AC | SLIN (Separately Identified) | CH-3: To be delivered Phase 3. Phase 3 - First Floor Qty: 6 Phase 3 - Second Floor Qty: 14 Phase 3 - Third Floor Qty: 8. | |||||||||||||
| Yes | No | Product | Real Property | 28 | Each | Firm Fixed Price | 7110 | |||||||||
| 0008 | CLIN | CH-3A: Perforated Back Breakroom Chair, Armless, on Glides in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0008 | AA | SLIN (Separately Identified) | CH-3A: To be delivered Phase 1. Phase 1 - Basement Qty: 8 Phase 1 - First Floor Qty: 6 Phase 1 - Second Floor Qty: 8. | |||||||||||||
| No | No | Product | Real Property | 22 | Each | Firm Fixed Price | 7110 | |||||||||
| 0008 | AC | SLIN (Separately Identified) | CH-3A: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 8 Phase 3 - Third Floor Qty: 8. | |||||||||||||
| Yes | No | Product | Real Property | 16 | Each | Firm Fixed Price | 7110 | |||||||||
| 0009 | CLIN | CH-4: Perforated Back Upholstered Seat Chair, with Arms, on Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0009 | AA | SLIN (Separately Identified) | CH-4: To be delivered Phase 1. Phase 1 - Basement Qty: 7 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 13. | |||||||||||||
| No | No | Product | Real Property | 20 | Each | Firm Fixed Price | 7110 | |||||||||
| 0009 | AC | SLIN (Separately Identified) | CH-4: To be delivered Phase 3. Phase 3 - First Floor Qty: 6 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||||||
| 0010 | CLIN | CH-5 : Bar Height Stool with Sled Base or 4-legs, Perforated Back, Upholstered Seat, Armless in accorance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0010 | AA | SLIN (Separately Identified) | CH-5: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 8. | |||||||||||||
| No | No | Product | Real Property | 8 | Each | Firm Fixed Price | 7110 | |||||||||
| 0010 | AB | SLIN (Separately Identified) | CH-5: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 3. | |||||||||||||
| No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||||||
| 0011 | CLIN | CH-5A : Bar Height Stool with Sled Base or 4 Legs, Perforated Back, Non-Upholstered Seat, Armless in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0011 | AA | SLIN (Separately Identified) | CH-5A: To be delivered Phase 1. Phase 1 - Basement Qty: 8 Phase 1 - First Floor Qty: 6 Phase 1 - Second Floor Qty: 8. | |||||||||||||
| No | No | Product | Real Property | 22 | Each | Firm Fixed Price | 7110 | |||||||||
| 0011 | AB | SLIN (Separately Identified) | CH-5A: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 2. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0011 | AC | SLIN (Separately Identified) | CH-5A: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 4. | |||||||||||||
| Yes | No | Product | Real Property | 4 | Each | Firm Fixed Price | 7110 | |||||||||
| 0012 | CLIN | CH-5B : Counter Height Stool with Sled Base or 4 Legs, Perforated Back, Upholstered Seat, Armless in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0012 | AB | SLIN (Separately Identified) | CH-5B: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 3. | No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||
| 0013 | CLIN | CH-6: Mesh Back Upholstered Seat Nesting Chair with Arms on Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0013 | AA | SLIN (Separately Identified) | CH-6: To be delivered Phase 1. Phase 1 - Basement Qty: 20 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 12. | |||||||||||||
| No | No | Product | Real Property | 32 | Each | Firm Fixed Price | 7110 | |||||||||
| 0013 | AC | SLIN (Separately Identified) | CH-6: To be delivered Phase 3. Phase 3 - First Floor Qty: 24 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 48. | |||||||||||||
| Yes | No | Product | Real Property | 72 | Each | Firm Fixed Price | 7110 | |||||||||
| 0014 | CLIN | CH-7: High Back Conference Room Chair in accordance with the SOW, dated dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0014 | AA | SLIN (Separately Identified) | CH-7: To be delivered Phase 1. Phase 1 - Basement Qty: 13 Phase 1 - First Floor Qty: 14 Phase 1 - Second Floor Qty: 22. | |||||||||||||
| No | No | Product | Real Property | 49 | Each | Firm Fixed Price | 7110 | |||||||||
| 0014 | AB | SLIN (Separately Identified) | CH-7: To be delivered Phase 2. Phase 2 - Basement Qty: 24 Phase 2 - First Floor Qty: 36 Phase 2 - Second Floor Qty: 11. | No | No | Product | Real Property | 71 | Each | Firm Fixed Price | 7110 | |||||
| 0014 | AC | SLIN (Separately Identified) | CH-7: To be delivered Phase 3. Phase 3 - First Floor Qty: 8 Phase 3 - Second Floor Qty: 18 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 26 | Each | Firm Fixed Price | 7110 | |||||
| 0015 | CLIN | CH-8: Conference Room & Executive Private Office Side Chair with or without Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0015 | AA | SLIN (Separately Identified) | CH-8: To be delivered Phase 1. Phase 1 - Basement Qty: 14 Phase 1 - First Floor Qty: 15 Phase 1 - Second Floor Qty: 28. | No | No | Product | Real Property | 57 | Each | Firm Fixed Price | 7110 | |||||
| 0015 | AB | SLIN (Separately Identified) | CH-8: To be delivered Phase 2. Phase 2 - Basement Qty: 26 Phase 2 - First Floor Qty: 17 Phase 2 - Second Floor Qty: 6. | |||||||||||||
| No | No | Product | Real Property | 49 | Each | Firm Fixed Price | 7110 | |||||||||
| 0015 | AC | SLIN (Separately Identified) | CH-8: To be delivered Phase 3. Phase 3 - First Floor Qty: 6 Phase 3 - Second Floor Qty: 24 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 30 | Each | Firm Fixed Price | 7110 | |||||||||
| 0016 | CLIN | CH-9: High Back Executive Chair in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0016 | AA | SLIN (Separately Identified) | CH-9: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 4. | |||||||||||||
| No | No | Product | Real Property | 5 | Each | Firm Fixed Price | 7110 | |||||||||
| 0016 | AB | SLIN (Separately Identified) | CH-9: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 2 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||
| 0016 | AC | SLIN (Separately Identified) | CH-9: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 2 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||
| 0017 | CLIN | CH-10: Wood Framed 4 Leg Conference Room Guest Chair in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0017 | AA | SLIN (Separately Identified) | CH-10: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 20 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 20 | Each | Firm Fixed Price | 7110 | |||||||||
| 0017 | AB | SLIN (Separately Identified) | CH-10: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 22 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 22 | Each | Firm Fixed Price | 7110 | |||||
| 0018 | CLIN | CH-11: Bar Height Stool/Molded Wood Shell/Metal Frame/Armless in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0018 | AB | SLIN (Separately Identified) | CH-11: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 12. | No | No | Product | Real Property | 12 | Each | Firm Fixed Price | 7110 | |||||
| 0019 | CLIN | CH-12: Mother's Room Recliner in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0019 | AB | SLIN (Separately Identified) | CH-12: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0020 | CLIN | L-1: Highback Armless Lounge in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0020 | AA | SLIN (Separately Identified) | L-1: To be delivered Phase 1. Phase 1 - Basement Qty: 2 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 4 | Each | Firm Fixed Price | 7110 | |||||
| 0021 | CLIN | L-2: Highback Armless Lounge in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0021 | AA | SLIN (Separately Identified) | L-2: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0022 | CLIN | L-3: Highback Lounge with High Arms in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0022 | AA | SLIN (Separately Identified) | L-3: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0022 | AC | SLIN (Separately Identified) | L-3: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0023 | CLIN | L-4: Lounge Chair with Tablet Arm & Cup Holder in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0023 | AA | SLIN (Separately Identified) | L-4: To be delivered Phase 1. Phase 1 - Basement Qty: 14 Phase 1 - First Floor Qty: 4 Phase 1 - Second Floor Qty: 7. | No | No | Product | Real Property | 25 | Each | Firm Fixed Price | 7110 | |||||
| 0023 | AB | SLIN (Separately Identified) | L-4: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 6. | |||||||||||||
| No | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||||||
| 0024 | CLIN | L-5: Back Lounge Chair in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0024 | AB | SLIN (Separately Identified) | L-5: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 6. | |||||||||||||
| No | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||||||
| 0024 | AC | SLIN (Separately Identified) | L-5: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 3 Phase 3 - Third Floor Qty: 3. | |||||||||||||
| Yes | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||||||
| 0025 | CLIN | D-1: 30" x 48" Adjustable Height Bench in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0025 | AA | SLIN (Separately Identified) | D-1: To be delivered Phase 1. Phase 1 - Basement Qty: 2 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0025 | AC | SLIN (Separately Identified) | D-1: To be delivered Phase 3. Phase 3 - First Floor Qty: 4 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 4 | Each | Firm Fixed Price | 7110 | |||||||||
| 0026 | CLIN | D-1A: 30" x 48" Adjustable Height Bench in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0026 | AB | SLIN (Separately Identified) | D-1A: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 5. | |||||||||||||
| No | No | Product | Real Property | 5 | Each | Firm Fixed Price | 7110 | |||||||||
| 0026 | AC | SLIN (Separately Identified) | D-1A: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 2 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0027 | CLIN | D-2: Freestanding U-Shape Modular Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0027 | AA | SLIN (Separately Identified) | D-2: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0027 | AB | SLIN (Separately Identified) | D-2: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 2 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0028 | CLIN | D-2A: Freestanding U-Shape Modular Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0028 | AA | SLIN (Separately Identified) | D-2A: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0028 | AC | SLIN (Separately Identified) | D-2A: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 5 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0029 | CLIN | D-3: L-Shape Desk w/35" High Panels in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0029 | AB | SLIN (Separately Identified) | D-3: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 28. | |||||||||||||
| No | No | Product | Real Property | 28 | Each | Firm Fixed Price | 7110 | |||||||||
| 0030 | CLIN | D-4: Freestanding Rectangular Shape Modular Desk 24" x 72" in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0030 | AB | SLIN (Separately Identified) | D-4: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 2 Phase 2 - Second Floor Qty: 5. | |||||||||||||
| No | No | Product | Real Property | 7 | Each | Firm Fixed Price | 7110 | |||||||||
| 0031 | CLIN | D-5: Freestanding Rectangular Shape Modular Desk 30" x 72" in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0031 | AB | SLIN (Separately Identified) | D-5: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0032 | CLIN | D-6: Freestanding Rectangular Shape Modular Desk 24" x 48" in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0032 | AB | SLIN (Separately Identified) | D-6: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 2 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0032 | AC | SLIN (Separately Identified) | D-6: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0033 | CLIN | D-7: Executive Transitional Style U-Shape Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0033 | AA | SLIN (Separately Identified) | D-7: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0033 | AB | SLIN (Separately Identified) | D-7: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 7 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0033 | AC | SLIN (Separately Identified) | D-7: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0034 | CLIN | D-7A: Executive Transitional Style U-Shape Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0034 | AB | SLIN (Separately Identified) | D-7A: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0035 | CLIN | D-7B: Executive Transitional Style U-Shape Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0035 | AA | SLIN (Separately Identified) | D-7B: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0036 | CLIN | D-7C: Executive Transitional Style U-Shape Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0036 | AA | SLIN (Separately Identified) | D-7C: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0037 | CLIN | D-7D: Executive Transitional Style U-Shape Desk in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0037 | AC | SLIN (Separately Identified) | D-7D: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0038 | CLIN | T-1: Breakroom Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0038 | AA | SLIN (Separately Identified) | T-1: To be delivered Phase 1. Phase 1 - Basement Qty: 2 Phase 1 - First Floor Qty: 2 Phase 1 - Second Floor Qty: 2. | No | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||
| 0038 | AC | SLIN (Separately Identified) | T-1: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 2. | |||||||||||||
| Yes | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||||||
| 0039 | CLIN | T-2: Team Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0039 | AA | SLIN (Separately Identified) | T-2: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0040 | CLIN | T-3: Bar Height Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0040 | AA | SLIN (Separately Identified) | T-3: To be delivered Phase 1. Phase 1 - Basement Qty: 2 Phase 1 - First Floor Qty: 2 Phase 1 - Second Floor Qty: 2. | No | No | Product | Real Property | 6 | Each | Firm Fixed Price | 7110 | |||||
| 0040 | AB | SLIN (Separately Identified) | T-3: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 3. | |||||||||||||
| No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||||||
| 0040 | AC | SLIN (Separately Identified) | T-3: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 1. | Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||
| 0041 | CLIN | T-4: Mobile Flip-Top Table on Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0041 | AA | SLIN (Separately Identified) | T-4: To be delivered Phase 1. Phase 1 - Basement Qty: 5 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 5. | |||||||||||||
| No | No | Product | Real Property | 10 | Each | Firm Fixed Price | 7110 | |||||||||
| 0042 | CLIN | T-4A: Mobile Flip-Top Table on Casters in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0042 | AC | SLIN (Separately Identified) | T-4A: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 11. | |||||||||||||
| Yes | No | Product | Real Property | 11 | Each | Firm Fixed Price | 7110 | |||||||||
| 0043 | CLIN | T-5: Conference Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0043 | AA | SLIN (Separately Identified) | T-5: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0043 | AB | SLIN (Separately Identified) | T-5: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0044 | CLIN | T-6: Conference Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0044 | AB | SLIN (Separately Identified) | T-6: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||
| 0044 | AC | SLIN (Separately Identified) | T-6: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0045 | CLIN | T-7: Conference Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0045 | AB | SLIN (Separately Identified) | T-7: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0046 | CLIN | T-8: Bar Height Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0046 | AA | SLIN (Separately Identified) | T-8: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 3 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||||||
| 0047 | CLIN | T-9: End Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0047 | AB | SLIN (Separately Identified) | T-9: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 2. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0047 | AC | SLIN (Separately Identified) | T-9: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0048 | CLIN | T-10: Team Room Tables in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0048 | AB | SLIN (Separately Identified) | T-10: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 2. | |||||||||||||
| No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0049 | CLIN | T-11: Custom Conference Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0049 | AA | SLIN (Separately Identified) | T-11: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0049 | AB | SLIN (Separately Identified) | T-11: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0050 | CLIN | T-12: Counter Height Parsons Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0050 | AB | SLIN (Separately Identified) | T-12: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0051 | CLIN | T-13: Bar Height Parsons Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0051 | AB | SLIN (Separately Identified) | T-13: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0052 | CLIN | T-14: Custom Conference Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0052 | AB | SLIN (Separately Identified) | T-14: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0052 | AC | SLIN (Separately Identified) | T-14: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0053 | CLIN | T-15: Mothers Room Table in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0053 | AB | SLIN (Separately Identified) | T-15: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0054 | CLIN | WM-1: Mothers Room Mirror in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0054 | AB | SLIN (Separately Identified) | WM-1: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0055 | CLIN | MCC: Mobile Computer Cart in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0055 | AA | SLIN (Separately Identified) | MCC: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 2 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||
| 0055 | AB | SLIN (Separately Identified) | MCC: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||
| 0056 | CLIN | BC-1: Buffet Credenza in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0056 | AA | SLIN (Separately Identified) | BC-1: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0056 | AB | SLIN (Separately Identified) | BC-1: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0057 | CLIN | SC-1: Storage Cabinet in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0057 | AA | SLIN (Separately Identified) | SC-1: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0058 | CLIN | SC-2: Three Drawer Lateral Filing Cabinet with Laminate Top in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0058 | AA | SLIN (Separately Identified) | SC-2: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0059 | CLIN | CAB-1: Modular Cabinetry in accordance with the SOW, dated 31 July 2020. | No | No | Product | Real Property | ||||||||||
| 0059 | AA | SLIN (Separately Identified) | CAB-1: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 3 | Each | Firm Fixed Price | 7110 | |||||
| 0059 | AC | SLIN (Separately Identified) | CAB-1: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 1. | Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||
| 0060 | CLIN | CAB-2: Mothers Room Modular Cabinetry in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0060 | AB | SLIN (Separately Identified) | CAB-2: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0061 | CLIN | PD-1: Privacy Divider in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0061 | AA | SLIN (Separately Identified) | PD-1: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | |||||||||||||
| No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||||||
| 0061 | AB | SLIN (Separately Identified) | PD-1: To be delivered in Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 5. | No | No | Product | Real Property | 5 | Each | Firm Fixed Price | 7110 | |||||
| 0061 | AC | SLIN (Separately Identified) | PD-1: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 2 Phase 3 - Third Floor Qty: 0. | |||||||||||||
| Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 7110 | |||||||||
| 0062 | CLIN | PD-2: Privacy Divider in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0062 | AA | SLIN (Separately Identified) | PD-2: To be delivered Phase 1. Phase 1 - Basement Qty: 8 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 8 | Each | Firm Fixed Price | 7110 | |||||
| 0062 | AC | SLIN (Separately Identified) | PD-2: To be delivered Phase 3. Phase 3 - First Floor Qty: 4 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 4 | Each | Firm Fixed Price | 7110 | |||||
| 0063 | CLIN | PD-3: Privacy Divider in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0063 | AA | SLIN (Separately Identified) | PD-3: To be delivered Phase 1. Phase 1 - Basement Qty: 1 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Each | Firm Fixed Price | 7110 | |||||
| 0064 | CLIN | MW-1: Modular Wall (Team Room) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0064 | AB | SLIN (Separately Identified) | MW-1: To be delivered Phase 2. Phase 2 - Basement Qty: 1 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0065 | CLIN | MW-2: Modular Wall (Two Front Office Group Private Offices) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0065 | AB | SLIN (Separately Identified) | MW-2: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0066 | CLIN | MW-3: Modular Wall (Conference Room) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0066 | AB | SLIN (Separately Identified) | MW-3: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0067 | CLIN | MW-4: Modular Wall (Private Office) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0067 | AA | SLIN (Separately Identified) | MW-4: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 0. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0068 | CLIN | MW-5: Modular Wall (Conference Room) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0068 | AC | SLIN (Separately Identified) | MW-5: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0069 | CLIN | MW-6: Modular Wall (Team Room) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0069 | AC | SLIN (Separately Identified) | MW-6: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0070 | CLIN | MW-7: Modular Wall (OCF 126/134) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0070 | AC | SLIN (Separately Identified) | MW-7: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0071 | CLIN | MW-8: Modular Wall (Aviation Simulator Room, Training Room & Labs) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0071 | AB | SLIN (Separately Identified) | MW-8: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0072 | CLIN | MW-9: Modular Wall (OCF 208) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0072 | AB | SLIN (Separately Identified) | MW-9: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0073 | CLIN | MW-9A: Modular Wall (Team Room) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0073 | AB | SLIN (Separately Identified) | MW-9A: To be delivered Phase 2. Phase 2 - Basement Qty: 0 Phase 2 - First Floor Qty: 0 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0074 | CLIN | MW-10: Modular Wall (OCF 220 Corridor) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0074 | AA | SLIN (Separately Identified) | MW-10: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0075 | CLIN | MW-11: Modular Wall (Collaboration 219) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0075 | AA | SLIN (Separately Identified) | MW-11: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0076 | CLIN | MW-12: Modular Wall (Conference Room 220) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0076 | AA | SLIN (Separately Identified) | MW-12: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 0 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0077 | CLIN | MW-13: Modular Wall (Breakroom) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0077 | AC | SLIN (Separately Identified) | MW-13: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 1 Phase 3 - Third Floor Qty: 0. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0078 | CLIN | MW-14: Modular Wall (Conference Room 302E) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0078 | AC | SLIN (Separately Identified) | MW-14: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 1. | |||||||||||||
| Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||||||
| 0079 | CLIN | MW-15: Modular Wall (Breakroom) in accordance with the SOW, dated 31 July 2020. | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0079 | AC | SLIN (Separately Identified) | MW-15: To be delivered Phase 3. Phase 3 - First Floor Qty: 0 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 1. | Yes | No | Product | Real Property | 1 | Lot | Firm Fixed Price | 7110 | |||||
| 0080 | CLIN | Power Pole for Freestanding Printer | ||||||||||||||
| No | No | Product | Real Property | |||||||||||||
| 0080 | AA | SLIN (Separately Identified) | Power Pole: To be delivered Phase 1. Phase 1 - Basement Qty: 0 Phase 1 - First Floor Qty: 1 Phase 1 - Second Floor Qty: 1. | No | No | Product | Real Property | 2 | Each | Firm Fixed Price | 5975 | |||||
| 0080 | AB | SLIN (Separately Identified) | Power Pole: To be delivered Phase 2. Phase 2 - Basement Qty: 3 Phase 2 - First Floor Qty: 1 Phase 2 - Second Floor Qty: 1. | No | No | Product | Real Property | 5 | Each | Firm Fixed Price | 5975 | |||||
| 0080 | AC | SLIN (Separately Identified) | Power Pole: To be delivered Phase 3. Phase 3 - First Floor Qty: 1 Phase 3 - Second Floor Qty: 0 Phase 3 - Third Floor Qty: 1. | Yes | No | Product | Real Property | 2 | Each | Firm Fixed Price | 5975 | |||||
| 0081 | CLIN | Design | No | No | Service | 1 | Lot | Firm Fixed Price | C211 | |||||||
| 0082 | CLIN | Installation | No | No | Service | 1 | Lot | Firm Fixed Price | N071 | |||||||
| 0083 | CLIN | Electrical | No | No | Service | 1 | Lot | Firm Fixed Price | J061 | |||||||
| 0084 | CLIN | Storage | No | No | Service | |||||||||||
| 0084 | AA | SLIN (Separately Identified) | Storage: Phase 1 Storage | Yes | No | Service | 60 | Days | Time and Materials | S215 | ||||||
| 0084 | AB | SLIN (Separately Identified) | Storage: Phase 2 Storage | Yes | No | Service | 60 | Days | Time and Materials | S215 | ||||||
| 0084 | AC | SLIN (Separately Identified) | Storage: Phase 3 Storage | Yes | No | Service | 60 | Days | Time and Materials | S215 |
Dropdown Values Product or Service Product Type FOB Point Type Party to Pay Transportation Cost Unit of Measure Cost Constraints Option UID Required Pricing Arrangement Line Item Type Currency Delivery - Address Type Delivery Type Date(s) - Single or Multiple Delivery Description Delivery Month Lead Time Event Frequency of Delivery Lead Time Description Duration Unit Frequency of Delivery Country Country Code US States Address Location Category Military or Federal Overseas City Military or Federal Overseas State / Province uiPostal Inspect Accept - Action Type Inspect Accept - Acceptance Address Type Inspect Accept - Inspection Address Type Inspect Accept - Both Address Type Inspect Accept - Location Type
| Product | Intellectual Property | Destination | Contractor | Bit | Catalog | Yes | Yes | Cost No Fee | CLIN | USD | Service Performance Site | Date or Dates | Single | Delivery After | ,January,February,March,April,May,June,July,August,September,October,November,December | CLIN Only - Date of Option Exercised | Daily | From date of lead time event to beginning of performance | Calendar Days | ,Daily,Hourly,Monthly,Quarterly,Weekly,Yearly | United States | USA | AL | United States | APO | AA | Acceptance | Acceptance Location | Party to receive Certified Inspection Report | Inspection and Acceptance Location | Source |
| Service | Personal Property | FoB Point | Government | Calls | Estimated | No | No | Cost Plus Award Fee | SLIN (Separately Identified) | Ship To,Shipment in Place Location | Lead Time | Multiple | Delivery Before | Date of Award | Hourly | From date of lead time event to completion of performance | Calendar Year | Afghanistan | ABW | AK | Military or Federal Overseas | DPO | AE | Inspection | Authorized Accepting Official | Inspection Location | Destination | ||||
| Real Property | Government Furnished Property (GFP) | Days | Includes Government Furnished Property (GFP) - Incorporation | Cost Plus Fixed Fee | INFOSLIN | Place of Performance | Schedule | Delivery Cycle | Date of Award Receipt | Monthly | From date of lead time event to date of latest delivery | Fiscal Year | Aland Islands | AFG | AZ | Foreign | FPO | AP | Both | Party to receive Inspection | Other | ||||||||||
| Intermediate FoB Point | Dozen | Includes Government Furnished Property (GFP) - Usage | Cost Plus Incentive Fee (Cost Based) | Mark for Party | Delivery Estimated By | Date of First Article Test Approval | Quarterly | From date of lead time event to delivery | Hours | Albania | AGO | AR | Outside Inspection Agency | ||||||||||||||||||
| Origin (after Loading) | Each | Lump Sum | Cost Sharing | Delivery Month | Date of Notice to Proceed Receipt | Weekly | From date of lead time event to first product shipment | Month | Algeria | AIA | CA | ||||||||||||||||||||
| Origin (Shipping Point) | Each per Month | Not to Exceed | Firm Fixed Price | Delivery On Or Before | Other | Yearly | Quarter of a Year | American Samoa | ALA | CO | |||||||||||||||||||||
| Other | Foot | Not Separately Priced | Fixed Price Incentive (Cost Based) | Delivery Period | Semiannual | Andorra | ALB | CT | |||||||||||||||||||||||
| Port of Embarkment | Hours | Schedule Price | Fixed Price Incentive (Successive Targets) | Delivery Requested By | Weeks | Angola | AND | DE | |||||||||||||||||||||||
| Port of Loading | Kilobyte | To Be Negotiated | Fixed Price Level of Effort | Delivery Required On | Work Days | Anguilla | ARE | DC | |||||||||||||||||||||||
| Terminal | Locations | Fixed Price Re-determination Prospective | Delivery Week Starting | Antarctica | ARG | FL | |||||||||||||||||||||||||
| Worldwide Geographic Location | Long Ton | Fixed Price Re-determination Retrospective | Antigua and Barbuda | ARM | GA | ||||||||||||||||||||||||||
| Lot | Fixed Price with Economic Price Adjustment - Actual Costs | Argentina | ASM | HI | |||||||||||||||||||||||||||
| Megabyte | Fixed Price with Economic Price Adjustment - Cost Indexes | Armenia | ATA | ID | |||||||||||||||||||||||||||
| Messages | Fixed Price with Economic Price Adjustment - Established Prices | Aruba | ATF | IL | |||||||||||||||||||||||||||
| Miles | Labor Hour | Australia | ATG | IN | |||||||||||||||||||||||||||
| Millimeter-minimum | Time and Materials | Austria | AUS | IA | |||||||||||||||||||||||||||
| Minutes | Azerbaijan | AUT | KS | ||||||||||||||||||||||||||||
| Months | Bahamas | AZE | KY | ||||||||||||||||||||||||||||
| Overtime Hours | Bahrain | BDI | LA | ||||||||||||||||||||||||||||
| Package | Bangladesh | BEL | ME | ||||||||||||||||||||||||||||
| Person | Barbados | BEN | MD | ||||||||||||||||||||||||||||
| Quarter (Time) | Belarus | BES | MA | ||||||||||||||||||||||||||||
| Quarter Hours | Belgium | BFA | MI | ||||||||||||||||||||||||||||
| Seconds | Belize | BGD | MN |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .