Amendment_2_-_Addendum_1.pdf
PDF 150 KB Posted
- Attached to
- 100033 Replace AHUs F/20643 Federal contract opportunity
- Solicitation number
- FA8601-13-R-0062
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| wage_decsion_26_Jul_13.pdf | ||
| Amendment_3.pdf | ||
| FFPAddendum-01.pdf | ||
| RFI_Answers_-_25_Jul_13.pdf | ||
| Attach_3_General_Decision_Number_OH130016_OH16_19_July_2013.pdf | ||
| FA8601-13-R-0062_Amendment_1.pdf | ||
| Site_Visit_Sign-in_Sheet.pdf | ||
| Rules_of_Engagement.pdf | ||
| Attach_1_Specifications.pdf | ||
| Attach_2_Drawings.pdf | ||
| FA8601-13-R-0062_AHUs.pdf | ||
| Attach_3_General_Decision_Number_OH130016_OH16_21_June_2013.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100033
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reason for the Amendment is correct language in PZIOC M-004 Alt I, add addedum 1and update the w age decision. Proposal due date has been extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
FA8601-13-R-0062
X
9B. DATED (SEE ITEM 11)
25-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2013
CODE
AFLCMC/PZIOC - CONSTRUCTION SECTION
POC: MARK LUCAS
1940 ALLBROOK DRIVE, ROOM 109
WRIGHT-PATTERSON AFB OH 45433-5309
FA8601 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8601-13-R-0062
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Jul-2013 10:00 AM to 31-Jul-2013 10:00 AM.
The offeror acceptance period has decreased by 2 from 155 to 153.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 593 21-MAY-2013
Attachment 2 Drawings 28 21-MAY-2013
Attachment 3 Wage Determination
OH130016 OH16
52 21-JUN-2013
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Specifications 593 21-MAY-2013
Attachment 2 Drawings 28 21-MAY-2013
Attachment 3 Wage Decision 46 19-JUL-2013
Attachment 4 Addendum 1 37 24-JUL-2013
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
PZIOC M-004 ALT I
PZIOC M-004 – BASIS FOR CONTRACT AWARD: Alternate I (NOV 2012)
GENERAL INSTRUCTIONS
a. Basis for Contract Award:
This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2, as supplemented. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation. The Government intends to award without discussions. Therefore, each initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if determined necessary by the
Contracting Officer.
b. Number of Contracts to be Awarded:
The Government intends to select one contractor for project 100033, Repalce 3 AHUs F/20643 . However, the
Government reserves the right to award no contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.
c. Rejection of Unrealistic Offers:
The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.
d. Correction Potential of Proposals:
The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty.
The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal not meeting the Government's requirements is not considered correctable, the offeror may be eliminated from the competitive range.
EVALUATION FACTORS
a. Factors:
Factor 1 - Technical Proposal: The factor is acceptable when the proposal provides the following evidence:
The contractor has provided sufficient evidence/documentation to substantiate the offeror’s previous experience as follows:
Performed as a general contractor on a construction project within the past five (5) years on a multi-discipline interior renovation with phased construction, in an occupied building, with a construction cost of $500,000 or greater and included the replacement of AHUs.
Factor 2—Price Proposal: The factor is acceptable when the proposal:
a. Reflects the total-price inserted at Contract Line Item Number 0001
b. Reflects a realistic price
b. Evaluation Methodology:
Technical acceptability will be evaluated for each offer concurrently with evaluation of their price proposal. Only those offerors determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Price proposals will be listed from lowest to highest price based on the total evaluated price. Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for non-cost factors.
c. Technical Factor:
Acceptable – The proposal meets specified minimum requirements necessary for acceptable contract performance.
Unacceptable – The proposal fails to meet specified minimum requirements necessary for contract performance.
*Proposals with an unacceptable rating are not awardable.
d. Price Factor:
Price Evaluation: the offeror’s cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements (basic award) and all options. The Government may determine that an offer is unacceptable if option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the offeror’s price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices.
Unrealistically Low Costs or Prices: Unrealistically low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.
Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalance pricing.
Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices.
Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The
Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.
e. Discussions:
It is the Government’s intent to award without discussions, therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the
Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revisions
(FPRs) will be considered in making the source selection decision.
f. Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
(End of Provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .