11 Aug 2011

FA8601-11-B-0005

Maintain Finishes, F/34010 / Project Number: 109012

Pre-Proposal RFI #4

1. Does the ceiling tile get replaced or just cleaned?

RESPONSE: Abatement of hazardous debris above the ceiling is only required in areas where the ceiling is going to be disturbed due to other scopes of this project. Abatement of all other hazardous materials should only be abated were specifically required and listed in the contract documents (i.e. there is no hazardous material abatement of flooring materials required in this project - existing ACM tile/vinyl is to remain).

2. Do the light bulbs and ballast get replace with new throughout?

RESPONSE: The only place where lights are affected is where the display case is being removed/ constructed.

3) We will not be providing a copy of the hazardous material survey at this time. All relevant hazardous material is listed on the contract drawings.