FA8601-10-R-0019-0002.pdf

PDF 15 KB Posted

Attached to
FA8601-10-R-0019, CDC
Solicitation number
FA8601-10-R-0019
Issued by

View the file

Other files

File Type Posted
FA8601-10-R-0019-Atch 4 Exh A Bid Sch 6-29-10.pdf PDF
FA8601-10-R-0019-0008.pdf PDF
PWS CDC Rev 6-24-10.docx DOCX document
FA8601-10-R-0019-0007.pdf PDF
09-R-0019 Atch 7 - Wage Det 05-2419-Rev 10.pdf PDF
09-R-0019 Atch 4 - Bid Sch 6-24-10.pdf PDF
09-R-0019 Atch 2-AF Standards- 6-24-10.pdf PDF
09-R-0019-0006.pdf PDF
09-R-0019 Atch 1 - PWS -6-24-10.pdf PDF
10-R-0019-conformed thru amend 0006.doc DOC document
FA8601-10-R-0019-0005.pdf PDF
Atch 3 - CAFMs and Drawings-6-21-10.pdf PDF
10-R-0019-0004.pdf PDF
Questions and Answers Part 2 6-21-10.pdf PDF
Atch 2 AF Standards Rev 6-21-10.pdf PDF
Atch 4 Exhibit A - Bid Schedule Rev 6-21-10.pdf PDF
PWS CDC Rev 6-16-10.pdf PDF
10-R-0019_Questions_and_Answers.doc DOC document
Appendix B Workload Data Rev 6-16-10.xlsx XLSX spreadsheet
FA8601-10-R-0019-0003.pdf PDF
Site Visit Minutes_10 Jun 10_CDC.doc DOC document
PWS CDC Rev -6-8-10.pdf PDF
FA8601-10-R-0019-0001.pdf PDF
FA8601-10-R-0019.pdf PDF
ATCH_5_Instructions_to offeror LPTA-CDC_revised_13apr10.doc DOC document
CDC Drawings and CAFMS.pdf PDF
05-2419 Rev 9 8-14-09.pdf PDF
CDC Workload Data.pdf PDF
Exhibit A Bid Schedule revised 1-16-10.pdf PDF
ATCH 8-woodsandprairies.pdf PDF
ATCH 8-areaB map.pdf PDF
FINAL PWS CDC-2-1-10.pdf PDF
PWS CDC-5-13-10 Draft.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to replace PWS dated 1 February 2010 w ith the attached PWS dated 8 June 2010. The revised PWS provides for an updated paragraph 3.1. "Furnished Property and Services".

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jun-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-10-R-0019

X 9B. DATED (SEE ITEM 11)

03-Jun-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt ofOffer is extended, X is not extended.

Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning 2 copies ofthe amendment; (b) By acknowledging receipt of this amendment on each copy ofthe offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jun-2010

CODE

88 CONS/PKB - BASE SUPPORT FLIGHT

POC: JACQUELINE DAVIS

1940 ALLBROOK DR, STE 3

WRIGHT-PATTERSON AFB OH 45433

FA8601 7. ADMINISTERED BY (Ifother than item6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8601-10-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate Performance Work Statement (PWS) dated 8 June 2010 thereby replacing PWS dated 1 February 2010.

As a result of this amendment the closing date remains unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .