Project Drawings.pdf
PDF 5 MB Posted
- Attached to
- Reconfiguration of Visualization Laboratory Federal contract opportunity
- Solicitation number
- FA8601-10-B-0006
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID OPENING.docx | DOCX document | |
| Map of Twin Base Golf Course.pdf | ||
| RECONFIGURE VIZUALIZATION LAB- Site Visit Roster.docx | DOCX document | |
| 090036_RFI 2- Response.docx | DOCX document | |
| 090036_RFI 3 Response.docx | DOCX document | |
| 090036_RFI 1.docx | DOCX document | |
| FFP Addendum 2.docx | DOCX document | |
| General Wage Decision 30 July_OH 29.docx | DOCX document | |
| Project Specifications.pdf | ||
| FA8601-10-B-0006 Solicitation.pdf | ||
| Drawing Addendum 2_Cable Tray Routing.pdf | ||
| FFP Addendum 1.docx | DOCX document | |
| Specs Addendum 1_Section 01 33 00.pdf | ||
| Specs Addendum 1_Section 01 01 50.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01COVER/INDEX SHEET
SCHNEIDER
G001
SCHNEIDER SCHMITZ
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
OHIO
DAYTON
OHIO
FAIRBORN
DRAWING INDEX
MECHANICAL
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
VICINITY MAP AREA ’B’ - LOCATION MAP SITE MAP
NO
SHEET SHEET NAME
NO
SHEET SHEET NAME
WPAFB
NOT TO SCALE NOT TO SCALE
NO
SHEET SHEET NAME
GENERAL ELECTRICAL
NO
SHEET SHEET NAME
01 COVER/INDEX SHEET
ARCHITECTURAL ABBREVIATIONS
ARCHITECTURAL SYMBOLS
ARCHITECTURE
ENTRY GATE
SITE MAP
G001 A001
A002
AD01
A101
DEMOLITION PLAN
FLOOR PLAN
A102 CEILING PLAN
A401
A501 WALL TYPES
I001
A601 DOOR SCHEDULE
INTERIOR FINISH SPECIFICATIONS & DRAWING NOTES
I101 INTERIOR FINISH PLAN
I201 FURNITURE PLAN
M001
MD01
ED01
E101
E201
E001
FLOOR PLAN - ELECTRICAL DEMOLITION
ELECTRICAL SYMBOLS
FLOOR PLAN - LIGHTING
FLOOR PLAN - POWER AND SYSTEMSM101 MECHANICAL NEW WORK PLAN
M401
MECHANICAL SYMBOLS
M002 MECHANICAL ABBREVIATIONS
MECHANICAL DEMOLITION PLAN
MECHANICAL ROOM ENLARGED PLAN
INTERIOR ELEVATIONS & SECTIONS
NO
SHEET SHEET NAME
27 F101
FIRE PROTECTION
FIRE PROTECTION PLAN 28
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROLS
M702 MECHANICAL CONTROLS
M703 MECHANICAL CONTROLS
NO
SHEET SHEET NAME
16 S101 FRAMING PLAN, SECTIONS, AND DETAILS
STRUCTURAL
08 A402
EXISTING CONDITIONS AND PENETRATION DETAILS.
E301
E302
ELECTRICAL SCHEDULES
ELECTRICAL PANELBOARD SCHEDULES
NO
SHEET SHEET NAME
A/V DRAWINGS
A/V01 A/V EQUIPMENT AND POWER DRAWINGS
RECONFIGURE VISUALIZATION LAB FACILITY, F/20248
LEVEL 3
BUILDING 20248,
AREA OF WORK:
WPAFB PROJECT# 090036
I40215
FLOOR TRANSITION DETAILS
INTERIOR ELEVATIONS
I401
E-W RUNWAY BEARING S85° 47’ 30"E 150’ X 7147.70’ (RESERVED RUNWAY FOR USAF MUSEUM-ESSENTIAL LANDING SURFACE) 34
SCHNEIDERSCHNEIDER
ARCHITECTURAL ABBREVIATIONS
SCHMITZ
A001
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
NOTE
STANDARD ARCHITECTURAL & STRUCTURAL ABBREVIATIONS
DRAWING
DOVETAIL ANCHOR
DRAIN TILE
DOWNSPOUT
DOOR
DOWN
DAMPPROOFING
DEAD LOAD
DUCTILE IRON PIPE
DIMENSION
DIAGONAL, DIAGRAM
DIAMETER
DRINKING FOUNTAIN
DETAIL, DETENTION
DESIGN
DEPARTMENT
DEMOLITION
DOUBLE
DEEP
CYLINDER
CUBIC
CENTER
CERAMIC TILE
COUNTERSUNK
COURSE
CARPET
CORRUGATED, CORRIDOR
CORNER
COORDINATE
CONTRACTOR
CONTINUOUS
CONSTRUCTION JOINT
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION, COMPACTED
COMBINATION
COLUMN
CLEANOUT, COMPANY
CONCRETE MASONRY UNIT
CORRUGATED METAL PIPE
CLEAR, CLEARANCE
CEILING
CLOSET
CHALKBOARD
CONTROL JOINT
CABINET HEATER
CORNER GUARD
CEMENT
CLOSED CIRCUIT TV
CATCH BASIN
CABINET
CENTERLINE
BOTH WAYS
BUILT-UP ROOF
BETWEEN
BASEMENT
BRICK
BEARING
BASE PLATE
BOTTOM
BENCHMARK, BEAM
BLOCKING
BUILDING
BITUMINOUS
BOARD
BOTTOM OF FOOTING
BOTTOM OF CURB
BACK TO BACK
BOTTOM OF
BASELINE
AVERAGE
AUXILIARY
AUDIO VISUAL
ASPHALT
ARCHITECTURAL
APPROXIMATE
APPROVED, APPLIED
ACCESS PANEL
ANODIZED
ALTERNATE
ALUMINUM
AGGREGATE
ABOVE FINISH GRADE
ABOVE FINISH FLOOR
ARCHITECT/ENGINEER
ADJACENT
ADJUSTABLE
ADDITIONAL
AMERICANS WITH DISABILITIES ACT
AREA DRAIN
ACOUSTIC TILE
ACOUSTICAL/AIR CONDITIONING
ABOVE
ANCHOR BOLT
NUMBER OR POUND
AND
AT (THE RATE OF)
DWG
DTA
DT
DS
DR
DN
DMPF
DL
DIP
DIM
DIAG
DIA (OR )
DF
DET
DES
DEPT
DEMO
DBL
D
CYL
CU
CTR
CT
CSK
CRS
CPT
CORR
COR
COORD
CONTR
CONT
CONST JT
CONST
CONN
CONC
COMP
COMB
COL
CO
CMU
CMP
CLR
CLG
CL
CKBD
CJ
CH
CG
CEM
CCTV
CB
CAB
BW
BUR
BTWN
BSMT
BRK
BRG
BP
BOT
BM
BLKG
BLDG
BIT
BD
B/F
B/C
B/B
B/
BL
AVG
AUX
A/V
ASPH
ARCH
APPROX
APPD
AP
ANOD
ALT
AL, ALUM
AGG
AFG
AFF
A/E
ADJT
ADJ
ADDL
ADA
AD
ACT
AC
ABV
AB
QUANTITY
QUARRY TILE
PRESSURE TREATED WOOD
PARTITION
PAINT, POINT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
PROPOSED
PRE-FORMED
PAIR
PANEL
PLYWOOD
POUNDS PER LINEAR FOOT
PLUMBING
PLASTER, PLASTIC
PLASTIC LAMINATE
PLATE, PROPERTY LINE
PARKING, PACKAGE
PRE-FINISHED
POUNDS PER CUBIC FOOT
PAVING
PROPERTY LINE
OUNCE
OPPOSITE
OPENING
OPPOSITE HAND
OVERHEAD DOOR
OVERHEAD
OFFICE
OUTSIDE FACE
OUTSIDE DIAMETER
ON CENTER
OUT TO OUT
NOT TO SCALE
NORTH SOUTH
NOISE REDUCTION COEFFICIENT
NOMINAL
NUMBER
NOT IN CONTRACT
NEAR FACE
NOT APPLICABLE
MUNTIN
MULLION
METAL
MOUNTED
MOP RECEPTOR
MOVABLE
MODULAR, MODIFY
MASONRY OPENING
MILLIMETER
MISCELLANEOUS
MINIMUM
MANHOLE
MANUFACTURER
MEZZANINE
MECHANICAL
MAIL BOX
MAXIMUM
MATERIAL
MASONRY
MAINTENANCE
METER
LONG WAY
LIGHTWEIGHT
LIGHTING
LOW POINT
LONG LEG VERTICAL
LONG LEG HORIZONTAL
LIVE LOAD
LEFT HAND
LINEAL FOOT
POUND
LAVATORY
LAMINATE
LABORATORY
ANGLE, LONG, LEFT, LENGTH
KNOCKOUT
KITCHEN
KILO-POUND
KNOCKDOWN
JOINT
JOINT FILLER
JUNCTION BOX
JANITOR
JOIST
INVERT
INTERIOR
INSULATION
INFORMATION
INCLUDE
INCH
INSIDE FACE
INSIDE DIAMETER
QTY
QT
PTWD
PTN
PT
PSI
PSF
PROP
PRF
PR
PNL
PLYWD
PLF
PLBG
PLAS
PLAM
PL
PKG
PFN
PCF
PAV
PL
OZ
OPP
OPNG
OPHD
OHD
OH
OFF
OF
OD
OC
O/O
NTS
NS
NRC
NOM
NO
NIC
NF
N/A
MUNT
MULL
MTL
MTD
MR
MOV
MOD
MO
MM
MISC
MIN
MH
MFR
MEZZ
MECH
MB
MAX
MAT
MAS
MAINT
M
LW
LTWT
LTG
LP
LLV
LLH
LL
LH
LF
LB
LAV
LAM
LAB
L
KO
KIT
KIP
KD
JT
JF
JB
JAN
J
INV
INT
INSUL
INFO
INCL
IN
IF
ID
HARDWOOD
HEADWALL
AIR CONDITIONING
HEATING, VENTILATING &
HEATER
HEATING
HEIGHT
HOUR, HANDRAIL
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HEADER
HARDBOARD
HEAVY DUTY
HANDICAPPED
HOSE BIBB
HIGH
GYPSUM
GYPSUM WALLBOARD
GUTTER
GROUND
GRADE BEAM
GRANULAR
GRADE
GOVERNMENT
GALVANIZED METAL PIPE
GAS METER
GLASS
GENERAL, GENERATOR
GENERAL CONTRACTOR
GALVANIZED
GALLON
GAUGE, GAGE
FIRE VALVE CABINET
FUTURE
FURRING
FOOTING
FOOT
FULL SIZE, FLOOR SINK
FIRE RETARDANT TREATED WOOD
FRAME
FIREPROOFING
FLOOR
FLASHING
FLEXIBLE
FINISH
FIRE HOSE RACK
FIRE HOSE CABINET
FIRE HYDRANT
FINISH FLOOR LINE
EQUIPMENT
FIXTURES, FURNISHINGS &
FINISH FLOOR ELEVATION
FINISH FLOOR, FAR FACE
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FOUNDATION
FLOOR DRAIN
FACE BRICK, FLOOR BOX
FASTEN(ER)
FIRE ALARM
FACE OF STUDS
FACE OF MASONRY
FACE TO FACE, FLOOR TO FLOOR
FACE OF CONCRETE
FACE OF
EXTERIOR
EXPOSED, EXPANSION
EXHAUST
EXISTING
ELECTRIC WATER COOLER
EAST WEST
EACH WAY, EYE WASH,
ESTIMATE
EYE WASH
EMERGENCY SHOWER &
EMERGENCY SHOWER
EQUIPMENT
EQUAL
ENCLOSE
EMERGENCY
ELEVATOR
ELECTRIC
ELEVATION
EXPANSION JOINT
FINISH SYSTEM
EXTERIOR INSULATING
EACH FACE
EXPANSION BOLT
EACH
EDGE OF PAVEMENT
EDGE OF
HWD
HW
HVAC
HTR
HTG
HT
HR
HP
HORIZ
HM
HDW
HDR
HDBD
HD
HC
HB
H
GYP
GWB
GUT
GRD
GR BM
GRAN
GR
GOVT
GMP
GM
GL
GEN
GC
GALV
GAL
GA
FVC
FUT
FUR
FTG
FT
FS
FRTWD
FR
FP
FLR
FLG
FLEX
FIN
FHR
FHC
FH
FFL
FF&E
FFE
FF
FEC
FE
FDN
FD
FB
FAS
FA
F/S
F/M
F/F
F/C
F/
EXT
EXP
EXH
EXIST
EWC
EW
EST
ESEW
ES
EQMT
EQ
ENCL
EMER
ELEV
ELEC
EL
EJ
EIFS
EF
EB
EA
E/P
E/
TYPICAL
TELEVISION
TOILET
TACKBOARD
THROUGH
THICK
TERRAZZO
TEMPORARY, TEMPERATURE
TELEPHONE
TRENCH DRAIN
TEMPORARY BENCH MARK
TEST BORING
TOP OF WALL
TOP OF SLAB
TOP OF MASONRY
TOP OF JOIST
TOP OF FOOTING
TOP OF COLUMN
TOP OF CONCRETE, TOP OF CURB
TOP OF BEAM
TOP OF
TONGUE & GROOVE
TOP & BOTTOM
TREAD
SYSTEM
SYMMETRY, SYMMETRICAL
SHORT WAY
SUSPENDED, SUSPEND
SUPPLEMENTAL
STRUCTURAL
STORAGE
STEEL JOISTS
STEEL
STANDARD
SOUND TRANSMISSION CLASS
STATION
SERVICE SINK
STAINLESS STEEL
SQUARE
SPECIFICATION
SPECIAL
STANDPIPE
SHEET METAL, SQUARE METER
SLEEVE
SINK
SAW JOINT
SIMILAR
SHEET
SHOWER
STRUCTURAL GLAZED TILE
SQUARE FOOT
SECTION
SOLID CORE WOOD
SCHEDULE
SANITARY
RAILROAD
ROUGH OPENING
ROUND
ROOM
ROOF LEADER
RIGHT HAND
ROOFING
REVISED, REVISION
RESILIENT
REQUIRED
REMOVE, REMOVEABLE
REINFORCED, REINFORCING
REFRIGERATOR
REFERENCE
ROOF DRAIN
REFLECTED CEILING PLAN
REINFORCED CONCRETE PIPE,
RABBET
RESILIENT BASE
RIGHT OF WAY
RADIUS, RISER
YARD, YARD DRAIN
WELDED WIRE FABRIC
WEIGHT
WAINSCOT
WATERSTOP
WATERPROOFING, WORKING POINT
WATER METER
WIND LOAD
WALL HYDRANT, WATER HEATER
WIDE FLANGE, WASH FOUNTAIN
WOOD
WATER CLOSET
WOOD BASE
WITHOUT
WITH
WIDE, WIDTH
VINYL WALL COVERING
VENT THRU ROOF
V-JOINT
VERIFY IN FIELD
VESTIBULE
VERTICAL
VINYL COMPOSITION TILE
VITRIFIED CLAY PIPE
VARIES
SURVEY
UNITED STATES GEOLOGICAL
URINAL
UNLESS NOTED OTHERWISE
UNFINISHED
UNDERWRITERS LABORATORY
UNIT HEATER
UNDERGROUND
UNDERCUT
TYP
TV
TLT
TKBD
THRU
THK
TERR
TEMP
TEL
TD
TBM
TB
T/W
T/S
T/M
T/J
T/FTG
T/COL
T/C
T/BM
T/
T&G
T&B
T
SYS
SYM
SW
SUSP
SUPP
STR
STO
STLJ
STL
STD
STC
STA
SSK
SS
SQ
SPEC
SPC
SP
SM
SLV
SK
SJ
SIM
SHT
SH
SGT
SF
SECT
SCWD
SCH
SAN
RR
RO
RND
RM
RL
RH
RFG
REV
RES
REQD
REM
REINF
REFR
REF
RD
RCP
RBT
RB
R/W
R
YD
WWF
WT
WSCT
WS
WP
WM
WL
WH
WF
WD
WC
WB
W/O
W/
W
VWC
VTR
VJ
VIF
VEST
VERT
VCT
VCP
VAR
USGS
UR
UNO
UNF
UL
UH
UG
UC
TO THE EXTENT APPLICABLE.
ABBREVIATIONS AND APPLIES TO THIS SET OF DRAWINGS
THIS LEGEND IS COMPRISED OF STANDARD SYMBOLS AND
TERRANOVATERRANOVA
03ARCHITECTURAL SYMBOLS
SCHMITZ
A002
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
T-1M-1
M-2
S-1(16)
RAMP
DNDN
DNUP
DOWN
RAMP
RAMP UP
RAMP
UP
ROOM
COMM
BB AA A1 B1 C1 D1 E1
REFERENCE SYMBOLS
A2.04
SECTIONS
ELEVATIONS
SECTION NUMBER
DRAWING WHERE SECTION IS SHOWN
DIRECTION OF SECTION CUT
A2.04
A2.04
02 04
A2.04
DETAILS
ROOM NUMBERS
DOOR NUMBERS
INTERIOR PARTITIONS
DIRECTION OF ELEVATION VIEW
ELEVATION NUMBER
DRAWING WHERE ELEVATION IS SHOWN
ELEVATION NUMBERS
DIRECTION OF ELEVATION VIEWS
DRAWING WHERE ELEVATION IS SHOWN
DETAIL NUMBER
DRAWING WHERE DETAIL IS SHOWN
INDICATES FLOOR OR LEVEL
ROOM NUMBER - FIRST DIGIT
TO DOOR SCHEDULE
MULTIPLE DOORS OR BORROWED LITES - REFER
SUBSEQUENT LETTERS REPRESENT ROOMS WITH
CORRESPONDS WITH ROOM WHERE DOOR OCCURS-
DOOR OR BORROWED LITE NUMBER - NUMBER
DIRECTION OF PARTITION CUT
TOILET ROOM ACCESSORIES
MANUAL
TOILET ACCESSORY - REFER TO PROJECT
WINDOW NUMBERS
TO WINDOW SCHEDULE
EXTERIOR WINDOW OPENING NUMBER - REFER
REVISIONS
CLOUD SURROUNDING AREA OF CURRENT REVISION
TITLE BAR INFORMATION
ENTRANCE CANOPY
SECTION
DESCRIPTION OF DETAIL
DETAIL TITLE
NOTE
03SCALE
0 FT21
A1.02
DRAWING(S) WHERE DETAIL IS TAKEN
GRAPHIC SCALE
DETAIL NUMBER
TO THE EXTENT APPLICABLE.
ABBREVIATIONS AND APPLIES TO THIS SET OF DRAWINGS
THIS LEGEND IS COMPRISED OF STANDARD SYMBOLS AND
A
A
UNLESS OTHERWISE INDICATED
NOTE: ALL PARTITIONS ARE TYPE ’A’
INTERIOR PARTITION TYPE
ALL CONSTRUCTION DEBRIS SHALL BE PROMPTLY REMOVED FROM PREMISES.A.
B.
C.
D.
E.
F.
G.
H.
I.
ROOM NUMBERS ARE FOR CONSTRUCTION PURPOSES ONLY.J.
K.
L.
M.
USE ONLY WRITTEN DIMENSIONS; DO NOT SCALE DRAWINGS.N.
O.
P.
Q.
REFER ELECTRICAL DRAWINGS FOR EMERGENCY EXIT SIGNS & LIGHTS.
GENERAL NOTES
OR DETAILED.
NEW WORK SHALL ALIGN WITH & MATCH EXISTING WORK EXCEPT WHERE OTHERWISE DIMENSIONED
CEILINGS SHALL BE FINISHED TO MATCH ADJACENT SURFACES.
FOUNDATIONS, & ACCESSORIES. AFTER REMOVAL, ALL FINISHED SURFACES AT FLOORS, WALLS, &
SUCH REMOVAL SHALL BE COMPLETE, INCLUDING BUT NOT LIMITED TO ANCHORS, HANGERS,
WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS, & SIMILAR ITEMS ARE REQUIRED TO BE REMOVED, DISCONNECTED, OR OTHERWISE MADE SAFE FOR WORK TO PROCEED.
DO NOT COMMENCE DEMOLITION WORK IN ANY AREA UNTIL UTILITIES HAVE BEEN CAPPED, PLUGGED, PATCHWORK SHALL BE FINISHED FLUSH ON BOTH SIDES OF THE OPENING.
& SIMILAR ITEMS WITH MATERIAL APPROPRIATE TO MATCH ADJACENT SURROUNDING MATERIAL.
PATCH OPENINGS, INCLUDING THOSE LEFT BY REMOVAL OF EXISTING DUCTS, CONDUITS, EQUIPMENT, UNLESS OTHERWISE INDICATED OR AS REQUIRED BY HARDWARE.
DOOR FRAMES INDICATED ON PLAN SHALL BE LOCATED MINIMUM 4’’ FROM ADJACENT WALLS
ACOUSTICAL CEILING GRID, OR OTHER NON-STRUCTURAL COMPONENTS.
DIRECTLY FROM STRUCTURE & SHALL NOT BE ATTACHED OR ANCHORED TO EXISTING CONDUITS, SUSPENDED ITEMS SUCH AS DUCTS, PIPES, CONDUITS, & SIMILAR ITEMS SHALL BE SUSPENDED
FINAL SKIM COAT OF GYPSUM BOARD TOPPING COMPOUND.
EXPOSED SURFACE OF PARTITION TO PROVIDE SMOOTH SURFACE FOR NEW FINISH BY APPLYING A
FOR PARTITIONS WHERE EXISTING PANELING OR WALLCOVERING IS NOTED TO BE REMOVED, REPAIR
EXISTING FLOOR, BORDERS, BASE, WAINSCOT, WALLS, & CEILING.
TO MATCH THE TYPE OF MATERIAL, SURFACE FINISH, SIZE, COLOR, & SIMILAR QUALITIES OF THE
TO MATCH EXISTING CONDITIONS. ’’MATCH EXISTING CONDITIONS’’ OR ’’PAINT TO MATCH’’ MEANS
PATCH ADJACENT MATERIALS (FLOORS, WALLS, & CEILINGS) AS REQUIRED BY NEW CONSTRUCTION
AS REQUIRED TO PROVIDE SUITABLE SUBSTRATE BENEATH NEW TILE FLOORS.
OTHERWISE INDICATED. MUD BEDS BENEATH EXISTING TILE FLOORS TO REMAIN. PATCH MUD BEDS
REMOVE FLOORING MATERIAL & BASE IN AREAS SCHEDULED TO RECEIVE NEW FINISHES UNLESS
SUITABLE SUBSTRATE FOR NEW FINISHES.
UNLESS OTHERWISE INDICATED. PATCH EXISTING WALL SURFACES AS REQUIRED TO PROVIDE
REMOVE ALL WALL FINISHES, TRIM, AND CEILINGS IN AREAS SCHEDULED TO RECEIVE NEW FINISHES
R.
MAY AFFECT INTENDED LAYOUT OR DETAILS.
NOTIFY CONTRACTING OFFICER BEFORE BEGINNING CONSTRUCTION OF ANY DISCREPANCIES WHICH
CONCRETE MASONRY UNITS, OR CONCRETE WALLS. CONTRACTOR SHALL VERIFY CONDITIONS &
DIMENSIONS ARE FROM FINISHED FACE OF NEW PARTITIONS, EXISTING PARTITIONS TO REMAIN, S.
CONSTRUCTION ALIGNMENT
A FINISH SURFACE UNLESS NOTED OTHERWISE.
ACROSS VOIDS. THIS ALIGNMENT REFERS TO
ALIGN WITH EXISTING COMPONENTS OR
ELEMENTS OF SIMILAR CONSTRUCTION SHALL
A
BARRIER LOCATIONS MUST BE APPROVED BY OWNER PRIOR TO INSTALLATION.
OCCUPIED AREAS OF BUILDING FROM DEMOLITION & CONSTRUCTION DUST & DEBRIS. DUST
GENERAL CONTRACTOR SHALL CONSTRUCT & MAINTAIN ADEQUATE DUST BARRIERS TO PROTECT
VERIFY IN FIELD.
CEILING HEIGHTS AVERAGE 9’-0" A.F.F. BUT VARY THROUGHOUT PROJECT. CONTRCTOR SHALL
LIFE SAFETY ANALYSIS
A. OCCUPANCY TYPE: B BUSINESS TESTING/RESEARCH)
IBC 2006
B.
OCCUPANT LOAD:
B 100 SF/PERSON
SF/PERSON
S-2 300 SF/PERSON
NONE REQUIREDOCCUPANCY & AREA SEPARATION:
C.
A-3 15
TRAVEL DISTANCE:D.
TOTAL EGRESS PATH300’-0"
COMMON PATH OF TRAVEL100’-0"
DEAD END CORRIDOR50’-0"
SEPARATION IS REQUIRED.
OCCUPANCIES TO THE BUSINESS USE, THEREFORE NO
FLOOR AREA & ARE CONSIDERED TO BE ACCESSORY
THE A-3 OCCUPANCIES ARE LESS THAN 10% OF THE TOTAL
OCC: 6
USE: B
551 S.F.
MEASUREMENT
DISPLAY
306F
OCC: 1
USE: S
166 S.F.
ROOM
MECHANICAL
306C
OCC: 3
USE: B
275 S.F.
LAB 1
306D
Occ: 3 Use: B 289 s.f.
lab 2 306E
OCC: 1
USE: S
63 S.F.
CLOSET
306B
OCC: 19
USE: B
1,908 S.F.
AREA
DEMONSTRATION
OCC: 1
USE: S
69 S.F
CLOSET
ELECTRICAL
305B
OCC: 0
USE: B
52 S.F.
CORRIDOR
EGRESS
305A
USE: A OCC: 20
299 S.F.
FOYER
OCC: 7
USE: B
610 S.F.
PROGRAMMING
306G
USE: B OCC: 0
266 S.F.
CORRIDOR
306A
ALLOWED)
(100’ MAX.
PATH OF TRAVEL
98’ COMMON
BUILDING 20248 IS 100% SPRINKLER PROTECTED.
T.
U.
(DRY LABORATORIES
A+S INCIDENTAL USES (>10%)
OCC: 26
USE: A-3
S.F.
CAB
BATTLE
V.
COORDINATED THROUGH OWNERS REPRESENTATIVE.
CONTRACTOR WORK IS PERMITTED BETWEEN 7AM AND 4 PM. SPECIAL CIRCUMSTANCES MAY BE
937-257-7320.
ABW/CEAR. COORDINATE THIS TURN-IN WITH THE WPAFB 88 ABW/CEAR RADIATION SAFETY BRANCH AT EMERGENCY EXIT SIGNS CONTAINING IONIZING RADIOACTIVE MATERIAL SHALL BE TURNED INTO 88 SUPPRESSION EQUIPMENT CONTAINING IONIZING RADIOACTIVE MATERIAL (SMOKE DETECTORS) AND ANY
NO ASBESTOS-CONTAINING MATERIALS CAN BE INSTALLED DURING THIS PROJECT. ANY FIRE
LANDFILLS. PLEASE CONTACT CEANP AT 257-5527 FOR DETAILS.
CEILING TILES SCHEDULED FOR REMOVAL MAY BE RECYCLABLE, DIVERTING DEMOLITION DEBRIS FROM
TURN-IN.
MANAGER AT 937-257-4769 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20. CONTACT WPAFB RECYCLING PROGRAM ARE NOT SCHEDULED FOR OFF-SITE RECYCLING CAN BE TURNED INTO THE WPAFB RECYCLING CENTER RECYCLABLE MATERIALS THAT ARE COST EFFECTIVELY SEGREGATED FROM DEMOLITION DEBRIS AND THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL.
SCHNEIDERSCHNEIDER SCHMITZ
AD01
DEMOLITION PLAN
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
DNDN
DNUP
DOWN
RAMP
RAMP
UP
ROOM
COMM
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
11 EX. LEVER AND TRIM SHALL BE REPLACED
TYP.
08 13
BB AA A1 B1 C1 D1 E1
DRAWING NOTES
GENERAL DEMOLITION NOTES
A.
B.
01.
C.
02.
03.
04.
05.
06.
07.
D.
08.
CEILING NOTE
REFER TO DRAWING NOTES.
REMOVE CEILING PANELS AND LAY-IN SUSPENSION SYSTEM.
09.
10.
11.
12.
13.
AND STORE FOR REUSE. REFURBISH TO LIKE NEW CONDITION.
REMOVE EXISTING ENTRY DOORS AND SALVAGE ELECTRONIC ACCESS LOCK
EXISTING DOOR AND HARDWARE TO REMAIN
FINISHES.
PATCH AND REPAIR EXISTING PERIMETER WALL. PREP TO RECEIVE NEW
AND STRUCTURAL DRAWINGS.
PREP TO RECEIVE NEW MECHANICAL LOUVERS. COORDINATE WITH MECHANICAL
REMOVE PORTION OF EXISTING EXTERIOR WALL INCLUDING PRECAST PANEL AND
ACCESS FLOOR TILES.
STANDS SHALL REMAIN. REPAIR AS NECESSARY AND PREPARE TO RECEIVE NEW
REMOVE EXISTING RAISED ACCESS FLOOR TILES ONLY. EXISTING FRAME AND
REMOVE EXISTING DOOR, FRAME, AND HARDWARE.
TO BOTTOM OF CEILING TILE.
REMOVE EXISTING PARTITION WALLS; WALLS RUN FROM TOP OF RAISED FLOOR
NECESSARY.
REMOVE PLUG MOLDS FROM PERIMETER WALL. PATCH AND REPAIR AS
TO OWNER.
CAREFULLY REMOVE CEILING MOUNTED HEAD TRACKER SYSTEM AND DELIVER
ARE TO BE SALVAGED AND REUSED.
REMOVE EXISTING CEILING TILE AND FRAME. ALL ATTACHED SMOKE DETECTORS
CONSTRUCTION. REFER TO ARCHITECTURAL FLOOR PLANS.
REMOVE PORTION OF EXISTING PERIMETER WALL TO ACCOMODATE NEW
REMOVE AND DELIVER TO OWNER. PATCH EXISTING CONCRETE AS NECESSARY
EXISTING LAB EQUIPMENT SECURED TO CEILING STRUCTURE. CAREFULLY
LOCATION IS IN ADJACENT BUILDING WITH LOADING DOCK ACCESS.
CONTRACTOR. COORDINATE WITH OWNER ON STORAGE LOCATION - NOTE THAT
1,500lb TEST TABLE TO BE REMOVED, STORED, AND REINSTALLED BY
937-257-7320.
THIS TURN-IN WITH THE WPAFB 88 ABW/CEAR RADIATION SAFETY BRANCH AT
RADIOACTIVE MATERIAL SHALL BE TURNED INTO 88 ABW/CEAR. COORDINATE
(SMOKE DETECTORS) AND ANY EMERGENCY EXIT SIGNS CONTAINING IONIZING
ANY FIRE SUPPRESSION EQUIPMENT CONTAINING IONIZING RADIOACTIVE MATERIAL
SCOPE OF WORK SHALL BE MAINTIANED.
DURING DEMOLITION AND CONSTRUCTION. ALL EGRESS PATHS OUTSIDE THE
CONTRACTOR SHALL PROVIDE MEANS OF SECURING SCOPE OF WORK AREA
CAREFULLY REMOVED AND HANDED OVER TO OWNER.
START OF DEMOLITION U.N.O. ALL FIXED LABORARTORY EQUIPMENT SHALL BE
OWNER TO REMOVE ALL LOOSE LABORATORY RELATED EQUIPMENT PRIOR TO
ADDITIONAL INFORMATION AND TO SCHEDULE A WALK-THROUGH.
ETC.) MAY BE RECYCLED. CONTACT CEANP AT (937) 257-5527 FOR
WHICH ARE IN GOOD CONDITION (I.E. MOLD, WATER DAMAGE, ADHESIVE FREE
ACOUSTICAL, LAY-IN CEILING PANELS SCHEDULED FOR REMOVAL OR DEMOLITION
COORDINATE TURN-IN.
937-257-4769 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO
CONTACT WPAFB RECYCLING PROGRAM MANAGER AT
CENTER IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20.
FOR OFF-SITE RECYCLING CAN BE TURNED INTO THE WPAFB RECYCLING
EFFECTIVELY SEGREGATED FROM DEMOLITION DEBRIS AND ARE NOT SCHEDULED
REDUCE WASTE DISPOSAL. RECYCLABLE MATERIALS THAT ARE COST
THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO
E.
01DEMOLITION PLAN SCALE
2 4 8FT0 63/16
KEY PLAN
TYP.
TYP.
TYP.
06 06
TYP.
11 11
11 TYP.
11 11 11
11 110303
T-1M-1
M-2
S-1(16) DNDN
DNUP
DOWN
RAMP
ROOM
COMM
BB AA A1 B1 C1 D1 E1
32’-0�" 31’-5"
14’-5"8’-6"2’-0"
4’-0"
6’-0"
A
A
ELEC.
CORRIDOR
PROGRAMING
CLOSET
MECH. ROOM
LAB 2
FOYER
A401
A401
ALIGN
ALIGN
BATTLE CAB
ALIGN
MEASUREMENT
DISPLAY
AREA
DEMONSTRATION
CORRIDOR
EGRESS
D
D
D
A
A
B
D
D
D D
D
AC
EQEQ EQ
8’-0"
B
B
B
B
A L
IG
N
B
B B
E EE
B
B
B
305a b
B
A402
D
A401
A401
A401
0504 BID OPTION A
a
G
D
306F
306C
306B
306A
E b
A
305B 305A
306C 306D 306E 306F
306A
306G
306B
305Aa
DRAWING NOTES
01.
02.
03.
BID OPTION
A.
KNEE-WALL CONSTRUCTION UNDER THE E-GLASS.
TYPE IS CONCEALED ANGLES AT TOP AND BOTTOM. SUBSTITUTE STANDARD
STANDARD GLAZING PANELS TO EXTENTS SHOWN IN BUILDING SECTIONS. FRAME
PROVIDE AND INSTALL ELECTROCHROMIC GLASS (LC TYPE) IN LIEU OF
04.
05.
06.
MECHANICAL DRAWINGS.
EXTRUDED ALUMINUM WALL VENT CENTERED ABOVE DOOR. COORDINATE WITH
DOORS. PAINT TO MATCH NEW DOORS.
REPLACE EXISTING DOOR TRIM AND LEVER TO MATCH NEW ON ADJACENT
ADJACENT EXISTING CONSTRUCTION.
PATCH AND REPAIR EXISTING CORRIDOR WALL. PAINT ENTIRE WALL TO MATCH
FRP BLOCKING AS REQUIRED FOR CFCI VESA MOUNT: 200mmx600mm
GFCI MONITOR: VIEWSONIC MODEL #N4785p, 47" WIDESCREEN MONITOR. PROVIDE
PROVIDE AND INSTALL POWER, DATA, BACKING, AND SUPPORT BRACKET FOR
LOUVER. COORDINATE WITH STRUCTURAL AND MECHANICAL DRAWINGS.
PRECAST EXTERIOR. PAINT NEW STEEL, EXPOSED AT EXTERIOR, TO MATCH
ARCHITECTURAL LOUVERS MODEL #E4JP OR EQUAL. COLOR TO MATCH EXISTING
NEW LOUVER OPENING: PROVIDE AND INSTALL NEW EXTERIOR LOUVER -
SYSTEM PRIOR TO PURCHACE.
WITH MANUFACTURER THAT THE NEW TILE WILL FIT THE EXISTING SUPPORT
BE SUPPORTED BY EXISTING RAISED ACCESS FLOOR FRAME SYSTEM. CONFIRM
AIR DISTRIBUTION ACCESS FLOORING (OR EQUAL) THROUGHOUT. PANELS MUST
PROVIDE AND INSTALL NEW TATE WOOD CORE 5000 (24" SQ) UNDERFLOOR
FLOOR PLAN 01
KEY PLAN
SCALE
2 4 8FT0 63/16
INSTALLATION:
RAISED ACCESS FLOOR PANEL
HATCHING INDICATES AREA OF NEW
9’-2�"
04 0404
SCHNEIDERSCHNEIDER SCHMITZ
A101
FLOOR PLAN
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
A102
CEILING PLAN
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
DNDN
DNUP
DOWN
RAMP
ROOM
COMM
BB AA A1 B1 C1 D1 E1
DNDN
DNUP
ROOM
COMM
305B 305A
306C 306D 306E 306F
306A
306G
306B
EQ EQ EQ EQ EQ EQ
ALIGN ALIGN
03 03
E Q
E Q
EQ.EQ. EQ.EQ.
EQ.EQ. EQ.EQ.
EQ.18’-0"EQ.EQ. EQ.
E Q
E Q
E Q
E Q
E Q
E Q
E Q
E Q
EQ. EQ.
E Q
E Q
EQ. EQ.
EQ. EQ.
E Q
E Q
EQ. EQ. EQ. EQ.
TPL-1,3
TPL-5,7
TPL-5,7
TPL-9,11
TPL-27,29
TPL-27
DRAWING NOTES
01.
02.
03.
04.
05.
06.
07.
08.
09.
NOTE: LOCATE FIXTURES AS SHOWN WITHIN CEILING GRID.
SHEET A401
CONTINUOUS SOFFIT TO CONCEAL MOTORIZED WINDOW SHADES - REFER TO
CEILING GRID MATCHES RAISED ACCESS FLOOR GRID BELOW.
FRAMED AND PAINTED GYPBD BULKHEAD. PAINT CEILNG CP-1
MECHANICAL, AND DETAIL 01/A402
NEW PENETRATION AT ROOF STRUCTURE - COORDINATE WITH STRUCTURAL,
CP-2
OPEN TO STRUCTURE ABOVE. PAINT ALL STRUCTURE AND INFRASTRUCTURE
OPEN TO STRUCTURE ABOVE
PROVIDE WIDER TRACK TO ELIMINATE GAP
PLAN" LAY-IN TILE WITH SQ. TEGULAR EDGE OR EQUAL.
FORMATIONS ACOUSTIC CLOUD WITH 4" VECTOR EDGE AND "OPTIMA OPEN
NEW DECORATIVE SUSPENDED CEILING TILE SYSTEM - ARMSTRONG
NEW 2x2 ACOUSTIC CEILING TILE AND FRAME.
HITACHI MODEL #CP-X960WA. COORDINATE WITH USER.
PROVIDE POWER, DATA, AND MOUNT FOR GFCI CEILING MOUNTED PROJECTOR.
10.
CEILING PLAN 01SCALE
2 4 8FT0 63/16
KEY PLAN
EXPOSED CEILING
9’-0"
9’-0"
9’-0" 9’-0"
9’-0"
9’-0"
9’-0"
9’-0" 8’-0"8’-0"
9’-6"
9’-6"
9’-6" 9’-6"
9’-6"
9’-6" 9’-6"
9’-6"
9’-6"
7’-6"
A401
INTERIOR ELEVATIONS AND SECTIONS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
EXTRUDED ALUMINUM
CONTINUOUS BLOCKING
(BY OTHERS) MUST BE
LEVEL
SHADECLOTH
IN DOWN
POSITION
REMOVABLE
CLOSURE
(WHITE)
ROLLER TUBE AND
SHADE BAND
REGULAR ROLL
ASSEMBLY (MOTOR
INSIDE TUBE)
HEMBAR IN UP
POSITION WITH
MAX. ROLL UP
DIAMETER UP TO
" [88.9mm]
LC
LC
POCKET INSTALLER NOTE
AND PARALLEL TO WINDOW WALL.
1 - POCKET MUST BE INSTALLED LEVEL
INTERFERE WITH BRACKET LOCATIONS.
2 - POCKET FASTENERS MUST NOT
O P
E N
IN
G
H E
IG
H T
S H
A D
O P
E N
G
H
IG
H T
3"
Ø4"
MIN.
POCKET (WHITE)
060 1 2 3INHALF
FULL
SHADE SOFFIT DETAIL (BASE BID)
0�"4"5�"
BOTTOM OF WINDOW HEAD
ALIGN BOTTOM WITH
GYP. BD. SOFFIT:
030 2 4 6FT1/4
SCALE
SECTION A
0’-0"
Top of Structure
1’-0"
Top of Raised Floor
040 2 4 6FT1/4
SCALE
BATTLE CAB / DEMO AREA GLAZ- BASE BID050 2 4 6FT1/4
SCALE
BATTLE CAB / DEMO AREA GLAZ- BID OPT A
20’-0"20’-0"
CHARACTERISTICS:
WITH THE FOLLOWING
ACTIVATION BY A SWITCH. COMPLY
TO CLEAR UPON ELECTRICAL
INSTANTLY FROM FROSTED WHITE
(LC GLASS) THAT CHANGES
PANELS WITH LIQUID CRYSTAL FLIM
LAMINATED ANNEALED GLASS
SWITCHABLE PRIVACY GLASS: CLEAR
OMIT MOTORIZED SHADES FROM BID.
PROVIDE POWER TO E GLASS AND
0.65%OFF
0.8%ON
SHADING COEFFICIENT
4%OFF
63%ON
DIFFUSED LIGHT TRANSMITTED
.01%OFF
75%ON
SPECUALR LIGHT TRANSMITTED
58%OFF
77%ON
VISABLE LIGHT TRANSMITTANCE:
080 2 4 6FT1/4
SCALE
XXX
ALIGN WITH HEAD OF DOOR
- 5 EQUAL PANES - BUTT GLAZE -
PROVIDE �" ELECTROCHROMIC GLASS
OF DOOR.
5 EQUAL PANES - ALIGN WITH HEAD
TEMPERED GLASS - BUTT GLAZE -
PROVIDE FULL HEIGHT �" CLEAR
A401
BOTTOM OF SHADE SOFFIT. A401
304 305
0 1 2 3FT1/2
SCALE 01
C
1’-3"3’-9"1’-0�"
A401
01/A
ELEVATION 01/A
MONITOR COVE 1 PLAN + ELEV
0 1 2 3FT1/2
SCALEMONITOR COVE 2 PLAN + ELEV 02
1’-1�"3’-9"1’-1�"
A401
02/A
CC D
ELEVATION 02/A
A101
MANUFACTURER - REFER TO SHEET
AND DEPTH WITH FLATSCREEN
CONFIRM RECESS HEIGHT, WIDTH,
A101
MANUFACTURER - REFER TO SHEET
AND DEPTH WITH FLATSCREEN
CONFIRM RECESS HEIGHT, WIDTH,
FLOOR GRID
ALIGN EDGES WITH RAISED ACCESS
A402
EXISTING CONDITIONS AND PENETRATION DETAILS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
040 1 2FT3/4
SCALE
030 1 3INHALFEXISTING COND. - PRECAST
FULL
VERIFICATION OF EXSITING CONDITIONS PRIOR TO WORK ON BUILDING ENVELOPE.
COURTSEY ONLY. THE CONTRACTOR IS RESPONSIBLE FOR PRELIMINARY EXPLORATION AND
NOTE: EXSITING CONDITION DRAWINGS ARE PROVIDED TO THE CONTRACTOR AS A
EXISTING COND. - SECTION @ COL 10
0 1 3INHALF
FULL
2EXTERIOR LOUVER
0 1 3INHALF
FULL
2ROOF PENETRATION DETAIL
EXISTING PRECAST PANEL
COUNTER FLASHING
SILL PANEL WITH DRIP EDGE
CAULK
LOUVER FRAME
STRUCTURAL SUPPORT
STRUCUTRAL SUPPORT
LOUVER FRAME
CAULK
CLIP ANGLE SECURED TO PRECAST PANEL
EXISTING PRECAST PANEL
HEAD DETAIL - JAMB SIM
EXISTING ROOF STRUCTURE
EXISTING INSULATION
EPDM PATCH TO MATCH EXISTING
RECOMMENDATION
COUNTERFLASH PER MANUFACTURERS
MECHANICAL DRAWING
GREENHECK MODEL GPR OR EQUAL. - REFER TO
PREFABRICATED ROOF CURB WITH RAISED CANT -
DRAWINGS
GRAVITY RELIEF HOOD - REFER TO MECHANICAL
DEMOLITION.
DAYS PRIOR TO ROOF
TO OWNERS REPRESENTATIVE (3)
MATERIAL FINDINGS AND REPORT
SAMPLE SITE. SUBMIT HAZARDOUS
PROVIDE A TEMPROARY PATCH AT
CONTRACTOR IS REQUIRED TO
A CERTIFIED ROOFING
TEST FOR HAZARDOUS MATERIAL.
MATERIAL AND INSULATION TO
CORE SAMPLE OF EXISTING ROOF
NOTE: CONTRACTOR SHALL TAKE
SCHNEIDER SCHNEIDER SCHMITZ
A501
WALL TYPES
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
SCHEDULED CEILING
CONTINUOUS RUNNER
TOP OF STRUCTURAL SLAB
BOTH SIDES
CONTINUOUS ACOUSTICAL SEALANT
DO NOT FASTEN TO STUDS
SECURED TO STRUCTURE-
CONTINUOUS RUNNER
HUNG MILLWORK/CASEWORK
DOUBLE STUDS AT WALL
HEAD
CEILING
PLAN
�’’ GYPSUM BOARD EACH SIDE
1-1/2
SCALE
0 1FT6 in
�’’ GYPSUM BOARD
AT 16’’ OC
3�’’ x 20 GAGE METAL STUDS
4�’’
02PARTITION TYPE ’B’
1-1/2
SCALE
0 1FT6 in
DO NOT FASTEN TO STUDS
SECURED TO STRUCTURE-
CONTINUOUS RUNNER
SCHEDULED CEILING
CONTINUOUS RUNNER
TOP OF STRUCTURAL SLAB
HUNG MILLWORK/CASEWORK
DOUBLE STUDS AT WALL
BASE BASE
PLAN
CEILING
HEAD
4�’’
DO NOT FASTEN TO STUDS
SECURED TO STRUCTURE-
CONTINUOUS RUNNER
SCHEDULED CEILING
HUNG MILLWORK/CASEWORK
DOUBLE STUDS AT WALL
�’’ GYPSUM BOARD EACH SIDE
AT 16’’ OC
3�’’ x 20 GAGE METAL STUDS
CONTINUOUS RUNNER
TOP OF STRUCTURAL SLAB
1-1/2
SCALE
0 1FT6 in
PARTITIONS WITH ’S’ SUFFIX ONLY
SOUND ATTENUATION INSULATION-
1-1/2
SCALE
0 1FT6 in
DO NOT FASTEN TO STUDS
SECURED TO STRUCTURE-
CONTINUOUS RUNNER
SCHEDULED CEILING
CONTINUOUS RUNNER
TOP OF STRUCTURAL SLAB
HUNG MILLWORK/CASEWORK
DOUBLE STUDS AT WALL
BASE
PLAN
CEILING
HEAD
VARIES
AT 16’’ OC
2�’’ x 20 GAGE METAL STUDS
SEALANT BOTH SIDES
CONTINUOUS ACOUSTICAL
SEALANT BOTH SIDES
CONTINUOUS ACOUSTICAL
SEALANT BOTH SIDES
CONTINUOUS ACOUSTICAL
SEALANT BOTH SIDES
CONTINUOUS ACOUSTICAL
�’’ GYPSUM BOARD BOTH SIDES
PARTITION TYPE ’D’ PARTITION TYPE ’A’PARTITION TYPE ’C’
2�’’
FURRING STRIP
�’’ x 20 GAGE METAL 1
PARTITION TYPE ’E’
MATCH EXISTING
REFER TO PLAN
A601
DOOR SCHEDULE
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
A
2’’ 2’’SCHEDULE
REFER
R E
F
R
S C
H E
D U
L E
03FRAME TYPES
0 2 4 6FT1/4
SCALE
02DOOR TYPES
0 2 4 6FT1/4
SCALE
B
DOUBLE STUDS AT JAMB
SECURE TO STUD
STANDARD JAMB ANCHOR-
1 �’’1 �’’
TYPES (WHERE APPLICABLE)
FRAME TYPES FOR GLASS
�’’ GLASS - SEE DOOR &
STOPS ALL AROUND WITH
APPLIED HOLLOW METAL
01SCALE
0 2 in3 6 in4 in
REFER TO PLANS FOR TYPE
GYPSUM BOARD PARTITION-
HEAD / JAMB - H01
D O
F
IS
H
G L
A
T Y
P E
D O
P E
M A
T E
R
IA
L
M A
T E
R
IA
L
F R
A M
P E
H E
A D
J A
M B
F
IR
A
T
IN
G
H
O U
R S
L
IN
T
L
P E
H A
R D
W A
T
R E
M A
R K
S
S
IL
L
M U
L L
IO
N
F R
A
F
IS
H
INDICATED
THICK UNLESS OTHERWISE
NOTE: ALL DOORS 1 �’’
DOOR & OPENING SCHEDULE
DOOR FRAME
DETAILS
N U
M B
E R
D O
O R
SIZE
DOOR SCHEDULE REMARKS
01.
2’’ 2’’SCHEDULE
REFER
R E
F
H E
D U
L E
2’’
SCHEDULE
REFER
(2) 3-0 x 7-0
LEVEL 3
WD F HM
F
F
F
F
F
F
F
F
F
F
F FG
PT
ST
GL
HM
WD
PAINT
STAIN
GLASS
METAL
HOLLOW
WOOD
A
GLAZING
G1. �" THICK, CLEAR, FULLY TEMPERED GLASS
REFER TO INTERIOR DRAWINGS FOR PAINT AND STAIN COLORS.
305b 3-0 x 7-0 1
305a
02.
03.
04.
05.
2’’ 2’’SCHEDULE
REFER
R E
F
H E
D U
L E
W
W306 2-0 x 7-0
G1
G1 B 1
HM PT 3 01,02
(2) 3-0 x 7-0
FG G1 035
HM 6
HM 7
HM
HM
HM BG1 1
G1 W
REFER TO SHEET A401 FOR INFORMATION REGARDING BID OPTION A
TRIM SET TO MATCH NEW HARDWARE.
W/OWNERS SECURITY GROUP.
CONDITION. MODIFY HARDWARE SET AS NECESSARY TO ENSURE PROPER OPERATION. COORDINATE
SALVAGE AND RE-USE EXISTING ELECTRONIC KEYPAD AND LOCK MECHANISM. REFURBISH TO LIKE-NEW
SINGLE DUMMY TRIM ON MAIN CORRIDOR SIDE - DOOR IS EGRESS ONLY.
PAINT TO MATCH EXISTING ADJACENT DOORS
3-0 x 7-0
3-0 x 7-0
3-0 x 7-0
3-0 x 7-0
WD ST HM PT 01 01 - - - -
- HM A PT 01 01 - - - -
WD - ST HM A PT 01 01 - - - -
- ST HM A PT 01 01 - - - -
- ST HM A PT 01 01 - - - -
- ST HM A PT 01 01 - - - -
WD - ST HM A PT 01 01 - - - -
ST HM PT 01 01 - - - -
3-0 x 7-0
3-0 x 7-0
3-0 x 7-0
- ST HM A PT 01 01 - - - -
3-0 x 7-0 WD - ST HM A PT 01 01 - - - -
WD ST HM A PT 01 01 - - - -
306A
306B
306C
306D
306E
306F
306G
3-0 x 7-0
305Aa
305Ab
ST B PT 01 01 - - - -
PT 01 01 - - - - -- -- -
INTERIOR FINISH SPECIFICATIONS & GENERAL NOTES 11
I001
M. KELLY M. KELLY SCHMITZ
FC-1
WC-1
CA-1
CA-2
WP-1
WP-2
RB-1
FR-1
CP-1
PF-1
WALLCOVERING: (WC)
PAINT: (WP)
FLOOR RESILIENT: (FR)
PANEL FABRIC: (PF)
CEILING PAINT: (CP)
CEILING ACOUSTIC: (CA)
REFERENCE THIS DRAWING FOR FINISH SPECIFICATIONS.
REFERENCE ELEVATIONS FOR ALL MILLWORK FINISHES.
ARE TO OCCUR AT CENTERLINE OF DOOR.
ALL CHANGES IN FLOORING BETWEEN ROOMS WITH DOORS
ALL WALLS ARE TO BE PAINTED WP-1 UNLESS NOTED OTHERWISE.
ADJACENT WALL FINISH UNLESS NOTED OTHERWISE.
ALL WALL REVEALS ARE TO BE PAINTED TO MATCH
UNLESS OTHER WISE NOTED.
A SEMI GLOSS FINISH TO MATCH ADJACENT WALL FINISH
ALL ACCESS PANELS OR DIFFUSERS ARE TO BE PAINTED
TO MATCH ADJACENT WALL FINISH, UNLESS NOTED OTHERWISE.
PAINT FACE OF BULKHEAD AND UNDERSIDE OF BULKHEAD
AND BELOW ALL MILLWORK COUNTERS AND CABINETS.
CONTINUE SPECIFIED PAINT AND WALLCOVERINGS ABOVE
UNLESS NOTED OTHERWISE
ALL GYPSUM BOARD CEILINGS ARE TO BE PAINTED CP-1
INSIDE CORNER, UNLESS OTHERWISE NOTED.
ALL TRIM AND BASE TO TERMINATE INTO NEAREST
FINISH UNLESS OTHERWISE NOTED.
A SEMI- GLOSS FINISH TO MATCH ADJACENT WALL
ALL FIRE EXTINGUISHER CABINETS ARE TO BE PAINTED
GENERAL NOTES
A
B
REFERENCE FINISH PLAN FOR FINISHES AND DRAWING NOTES.
REMARKS
F L
O O
R
B A
S E
W A
L L
C E
IL
IN
G
R E
M A
R K
S
FINISH SCHEDULE
R O
O M
N U
M B
E R
R O
DEMONSTRATION AREA
BATTLE CAB
FOYER
306A
306B
306C
306D
306E
CLOSET
LAB 1
LAB 2
CORRIDOR
306F
306G
DISPLAY MEASUREMENT
PROGRAMMING
MECHANICAL ROOM
305A
305B
EGRESS CORRIDOR
ELECTRICAL
ROOM
ALL COLUMNS ARE TO BE PAINTED WP-1, UNLESS NOTED OTHERWISE.
INSTALL METHOD: MONOLITHIC
MULTI LEVEL PATTERN LOOP
COLOR: OPAQUE BLACK/63500
NAME: MIRROR IMAGE TILE/59466
SHAW CONTRACT GROUP
4" HIGH
COLOR: 63 BURNT UMBER
JOHNSONITE
SDT-1
COLOR: CHARCOAL/LIGHT GRAY 66
SIZE: 12X12X1/8
CONDUCTIVE TILE
FLEXCO FLOORING
TYPE II, 25 OZ.
52" WIDE/100% VINYL
COLOR: 030 PEWTER
NAME: PLEAT 395550
MAHARAM
STATIC DISSIPATIVE TILE: (SDT)
WP-3
TO BE PAINTED WP-2, SEMIGLOSS, UNLESS NOTED OTHERWISE.
ALL HOLLOW METAL DOORS, DOOR FRAMES AND SIDELIGHTS
FL-1
FLOOR LAMINATE: (FL)
C
D
E
F
G
H
I
J
K
L
M
N
O
P
CP-2
WP-4
REFERENCE INTERIOR DRAWING I-401 FOR TYPICAL FLOOR TRANSITIONS.
FINISH SPECIFICATIONS
UNBACKED FOR WRAPPED PANELS
NUMBER: 82 / 66" WIDE
PRODUCT LINE: XP
STYLE: RESONANCE 5136
CARNEGIE
BASE RESILIENT: (RB)
AND SPECIFICATION FROM OTHER MANUFCATURERS.
THESE FINISHES ARE THE BASIS OF DESIGN AND ARE NOT INTENED TO LIMIT THE SELECTION OF EQUAL COLORS
FLOOR CARPET: (FC)
DETECTORS OR FIRE ALARM STROBES.
DO NOT PAINT SPRINKLER HEADS, SMOKE AND HEAT
DUCTWORK, ETC. TO MATCH ADJACENT WALL/CEILING FINISH.
PAINT ALL EXPOSED PIPING, CONDUIT, ELECTRICAL DEVICES,
FR-1 RB-1
FC-1 RB-1 CA-1
FC-1 RB-1 WP-4 CA-1
FR-1 RB-1 CA-1
FL-1 RB-1 WP-1 CA-1
FL-1 RB-1 WP-1 CA-1
FR-1 RB-1 WP-1 CA-1
FR-1 RB-1 WP-1 CA-1
RB-1 WP-1 CA-1
FC-1 RB-1 WP-1 CA-1
FR-1 RB-1 WP-1 CA-1
FL-1 RB-1 WP-1 CA-1
SDT-1
1WP-1,3
WP-1,3 CA-2/CP-2
FOR DETAILS
SEE ACCESS FLOORING SPECIFICATIONS
SIZE: 2X2
COLOR: 3607 GREY DUSKSTYLE: PIANO/
FORBO MARMOLEUM
TATE ACCESS FLOOR SYSTEM
SEE SPECIFICATIONS FOR DETAILS
2X2 ACOUSTICALTILE
FINE FISSURED CERAMAGUARD
ARMSTRONG CEILINGS
FOR DETAILS
SEE ACCESS FLOORING SPECIFICATIONS
MR6005 FT / SIZE: 2X2
COLOR: WINTER GRAY MATRIX
STANDRAD LAMINATE OFFERING
TATE ACCESS FLOOR SYSTEM
WP-1 / PF-1
FINISH: SATIN
COLOR: DORIAN GRAY
SW7017
SHERWIN WILLIAMS
FINISH: SATIN
COLOR: NUANCE
SW7049
SHERWIN WILLIAMS
FINISH: SATIN
COLOR: NUANCE
SW7049
SHERWIN WILLIAMS
FINISH: SEMIGLOSS
COLOR: GAUNTLET GRAY
SW7019
SHERWIN WILLIAMS
FINISH: SATIN
COLOR: SASSY GREEN
SW6416
SHERWIN WILLIAMS
FINISH: SATIN
COLOR: DORIAN GRAY
SW7017
SHERWIN WILLIAMS
WD-1
FINISH: 01 CLEAR
VENEER: PLAIN SLICED NATURAL BIRCH
EGGERS INDUSTRIES
WOOD DOOR TO MATCH
WOOD VENEER: (WD)
ALL SCHEDULED WOOD VENEER DOORS TO MATCH WD-1.
1, 2
1, 2
REFERENCE DRAWING I.402 FOR WALL PANEL DESIGN.
SEE SPECIFICATIONS FOR DETAILS
FORMATIONS FLOATING CEILING
ARMSTRONG CEILINGS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
INTERIOR FINISH PLAN
I101
M. KELLY M. KELLY SCHMITZ
DRAWING NOTES
REFERENCE DRAWING I-401/B FOR TRANSITION DETAIL FROM CARPET TO RESILIENT FLOORING.
REFERENCE DRAWING I-401/A FOR TRANSITION DETAIL FROM RESILIENT TO STATIC DISSIPATIVE TILE.
REFERENCE DRAWING I-401/D FOR TRANSITION DETAIL FROM RESILIENT TO LAMINATE FLOORING.
04 REFERENCE DRAWING I-401/C FOR TRANSITION DETAIL FROM RESILIENT TO VINYL COMPOSITION FLOORING.
05 PAINT METAL DOOR FRAME TO MATCH ADJACENT, EXISTING, BUILDING STANDARD FRAMES.
06 PAINT WALL TO MATCH OPPOSITE, EXISTING, BUILDING STANDARD WALLS.
07 PAINT HOLLOW METAL DOOR AND FRAME TO MATCH ADJACENT, EXISTING, BUILDING STANDARD DOORS.
305B 305A
306C 306D 306E 306F
306A
306G
306B
PF-1
W C
WP-3
W P
06 06
07 05
DNDN
DNUP
ROOM
COMM
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
FURNITURE PLAN
I201
M. KELLY M. KELLY SCHMITZ
NOTES
1. REFERENCE FFE PACKAGE FOR FURNITURE SPECS AND DETAILS.
305B 305A
306C 306D 306E 306F
306A
306G
306B
T-1M-1
M-2
S-1(16) DNDN
DNUP
ROOM
COMM
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
I-401
INTERIOR FLOOR TRANSITION DETAILS
M. KELLY M. KELLY
FLOORING
RESILIENT
CONCRETE SLAB
TILE
STATIC DISSIPATIVE
B. CARPET TO RESILIENT FLOORING
A. RESILIENT FLOORING TO STATIC DISSIPATIVE TILE
CONCRETE SLAB
CARPET
TILE
VINYL COMPOSITION
C. RESILIENT TILE TO VINYL COMPOSITION TILE
D. RESILIENT TILE TO LAMINATE FLOORING
CONCRETE SLAB
TILE
VINYL COMPOSITION
CONCRETE SLAB
LAMINATE FLOOR TILE
LINOLEUM TILE
COLOR TO MATCH RB-1
CTA-XX-N
JOHNSONITE TRANSITION
TILE
LINOLEUM
COLOR TO MATCH RB-1
" RESILIENT� CARPET TO �
JOHNSONITE TRANSITION CTA-XX-C,
FS-XX-DW2. COLOR TO MATCH RB-1.
JOHNSONITE 1" FEATURE STRIP
COLOR TO MATCH RB-1
JOHNSONITE SSR-XX-B
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
I402
INTERIOR ELEVATIONS
M. KELLY M. KELLY SCHMITZ
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
030 2 4 6FT1/4
SCALE
010 2 4 6FT1/4
SCALE
BATTLE CAB / WALL PANEL DESIGN
4’-11" 6’-8�"
20’-0"
2’-0" 2’-0" 6’-0"
020 2 4 6FT1/4
SCALE
DEMONSTRATION ROOM / WALL PANEL DESIGN
4’-0"
A F
F
2’-0"
16’-0"
FABRIC PF-1.
WRAPPED PANEL
NORTH WALL
FABRIC PF-1
WRAPPED PANEL
FABRIC PF-1
WRAPPED PANEL
FABRIC PF-1
WRAPPED PANEL
FABRIC PF-1
WRAPPED PANEL
2’-0"4’-0"
14’-0"
2’-0" 2’-0" 2’-0"
1’-9"
040 2 4 6FT1/4
SCALE
DEMONSTRATION ROOM / WALL PANEL DESIGN
SOUTH WALL
WEST WALL
DEMONSTRATION ROOM / WALL PANEL DESIGN
12’-0"14’-0"
7 5/8 "
2’-0"2’-0"4’-0"
OPEN TO OPEN TO ABOVE
OPEN TO OPEN TO ABOVEOPEN TO OPEN TO ABOVEOPEN TO OPEN TO ABOVE
20’-0"
4’-0"
FABRICPF-1
WRAPPED PANEL
A F
F
A F
F
S101
THIRD FLOOR
01FRAMING PLAN
AHU SUPPORT .
DETAIL 02
HEADER SUPPORT FOR LOUVER OPENING .
SECTION 03
3/8
SCALE
0 2 4FT
MECHANICAL ROOF OPENING .
DETAIL 04
FRAMING PLAN, SECTIONS, AND DETAILS
BUKALA SHARPSHAIR - .
B1
NTS
NTS
NTS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
S101
S101
FOR EXISTING PIPING
ALLOW PASSAGE
STOP BEAMS TO
EXISTING PIPING.
306C
306B
306A
306C
306A
306B
W12x16
W x
W x
W x
W12x16
W x
C6x8.2
C6x8.2
FACE OF AHU
ALIGN WITH
FACE OF AHU
ALIGN WITH
W12x19
PL �"
(2) �" DIA BOLTS
BOTTOM FLANGE
4’-0" OC, MIN (2) PER BEAM,
�" EPOXY ANCHOR AT
1.
FLAT AND STABLE ON FLOOR.
SHIM STEEL ASSEMBLY TO LAY
NOTES:
TENSIONED, AT 11" OC
BOLT FULLY
�" DIA ASTM A325
TO MECHANICAL
OPENING, REFER
6" MIN11"3"
ELEVATION SECTION
ANTI-CORROSION COATING
REINFORCEMENT WITH
EXPOSED ENDS OF
(TYP 4 SIDES) COAT
".DO NOT OVERCUT"
OPENING IN PRECAST
WHEN CUTTING
NOTE:
B1
CONCRETE JOIST TEE
CONCRETE ROOF BEAM
CONCRETE ROOF BEAM
ROOF DECK
OPENING PRIOR TO CUTTING
VERIFY CLEARANCE FOR
WITH MECHANICAL. FIELD
ROOF OPENING. COORDINATE
ANTI-CORROSION COATING
REINFORCEMENT WITH
EXPOSED ENDS OF
(TYP 4 SIDES) COAT
."OR JOISTS
DO NOT CUT BEAMS"
. DO NOT OVERCUT""
OPENING IN PRECAST
WHEN CUTTING ROOF
NOTE:
EXTERIOR INTERIOR
C6x8.2
PL�"x6"
A A
A-A
AWAY FROM WALL
PLATE TO SHED WATER
SLOPE GROUT AT TOP OF
GROUT LEVELING COURSE.
ASTM C1107 NONSHRINK
M001
DRANSMAN FYE NADER
MECHANCIAL SYMBOLS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
A
M3
AHU-1
R2
S1
G
(ABV)
(ABV)
CB-1
MH-1
ABV
ABV.
TW
AAV
MAV
F & T
A
X
A
A
R
ABV.
SG-1
RG-1
BDD
R
20X12
UC �"
20X12 L
C NC
NO
PSD
OR
AD
LD-1
OR
S R
H
T
STANDARD MECHANICAL SYMBOLS
GENERAL SYMBOLS
PLUMBING SYMBOLS
PIPING SYMBOLS HVAC DUCTWORK SYMBOLS
HVAC CONTROL SYMBOLS
HVAC DUCTWORK SYMBOLS (CONT.)
NOTES:
CO
VFD
AFMS
PUMP SUCTION DIFFUSER
45 DEGREE DROP
PIPE ELBOW DOWN
PIPE ELBOW UP
UNION
THERMOMETER WELL
CONCENTRIC REDUCER
ECCENTRIC REDUCER
FLEXIBLE CONNECTION
PLUG VALVE
O.S. & Y VALVE.
QUICK OPENING VALVE
PIPE TEE DOWN
PIPE TEE UP
BLOW-OFF STRAINER
ABBREVIATION OF PIPE CONTENTS
AUTOMATIC FLOW CONTROL VALVE
AUTOMATIC AIR VENT
PUMP
ABBREVIATION OF ITEM
THERMOMETER
PRESSURE GAGE & COCK
MANUAL AIR VENT
(SELF CONTAINED)
TRAP, STEAM W/ TYPE (F & T = FLOAT &
THERMOSTAT; BT = BUCKET, TT = THERMOSTATIC)
PIPE CAP
ALIGNMENT GUIDE (A = TYPE)
ANCHOR (A =TYPE)
EXPANSION JOINT (A = TYPE)
EXPANSION LOOP
FLEXIBLE CONNECTOR
PITCH OF PIPE (R = RISE; D = DROP)
IN DIRECTION OF FLOW
PRESSURE/TEMPERATURE PORT
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE
RELIEF VALVE
BALANCING VALVE
PRESSURE REDUCING VALVE
CHECK VALVE
CALIBRATED BALANCING VALVE
CHECK VALVE W/BALL DRIP
GATE ANGLE VALVE
GLOBE ANGLE VALVE
STRAINER
SUPPLY AIR
RETURN OR EXHAUST AIR
(INCHES W.G.)
DUCT PRESSURE CLASS INDICATOR
UNDER CUT DOOR,WITH SIZE & CFM
LOUVERED DOOR,WITH SIZE & CFM
UNIT HEATER, HORIZONTAL THROW
MANUAL SPLITTER DAMPER
FLEXIBLE DUCT CONNECTION
SUPPLY GRILLE (WALL OR SIDE OF DUCT,
SIMILAR FOR RETURN/EXHAUST GRILLES)
ACCESS DOOR (VERTICAL OF HORIZONTAL)
RECTANGULAR BRANCH TAKE-OFF
RETURN GRILLE (CEILING OR BOTTOM OF DUCT)
CEILING DIFFUSER (CEILING OR BOTTOM OF DUCT)
INTERNAL INSULATION
AUTOMATIC AIR DAMPER
VOLUME DAMPER
BACKDRAFT DAMPER
(200 = CFM QUANTITY)
AIR EXHAUST OR RETURN
(RG OR EG = GRILLE; RR OR ER = REGISTER)
(200 = CFM QUANTITY)
FIRE DAMPER - VERTICAL POSITION
(HORIZONTAL AIR FLOW; AD = ACCESS DOOR)
FIRE DAMPER - HORIZONTAL POSITION
(VERTICAL AIR FLOW; AD = ACCESS DOOR)
(HORIZONTAL AIR FLOW; AD = ACCESS DOOR)
(VERTICAL AIR FLOW; AD = ACCESS DOOR)
SMOKE DAMPER - VERTICAL POSITION
SMOKE DAMPER - HORIZONTAL POSITION
DUCT PITCH IN DIRECTION OF FLOW
(R = RISE; D = DROP)
(DIMENSIONS ARE CLEAR INTERNAL)
AIR SUPPLY OUTLET W/THROW DIRECTION
DUCT SIZE; FIRST NUMBER SHOWN IS
DIMENSION OF SIDE SHOWN
(SG = GRILLE; CD = CEILING DIFFUSER;
SR = REGISTER)
AIR SUPPLY DUCT ELBOW UP
AIR RETURN, OUTSIDE OR EXHAUST DUCT ELBOW UP
AIR SUPPLY DUCT ELBOW DOWN
AIR RETURN, OUTSIDE OR EXHAUST DUCT ELBOW DOWN
LINEAR DIFFUSER (200 = CFM QUANTITY)
UNIT HEATER, VERTICAL THROW
SANITARY WASTE STACK AND VENT NUMBER
KITCHEN EQUIPMENT/LABORATORY EQUIPMENT NUMBER
ROOF LEADER/DOWNSPOUT NUMBER
FLOOR PENETRATION LINE (ISOMETRIC)
VENT THRU ROOF (ISOMETRIC)
PIPE UP TO FIXTURE OR EQUIPMENT INDICATED
WATER ISOMETRIC NUMBER
INTERCEPTOR W/ TYPE (G=GREASE; O=OIL)
BACKWATER VALVE
BACKFLOW PREVENTER (RP=REDUCED PRESSURE;
DC=DUAL CHECK)
HUB DRAIN OUTLET W/ TRAP
FLOOR DRAIN W/ TRAP
RUNNING TRAP W/ CLEANOUT
COLD WATER
HOT WATER
HOT WATER RETURN
VENT PIPING
ROOF DRAIN
ROOF DRAIN W/ SCUPPER DRAIN
PIPING ABOVE FLOOR OR GRADE
(ABV=TYPE; SEE ABBREVIATIONS)
PIPING BELOW FLOOR OR GRADE
(ABV=TYPE; SEE ABBREVIATIONS)
FLOOR OR GRADE CLEANOUT
CATCH BASIN W/ DESIGNATION
MANHOLE W/ DESIGNATION
HOT WATER WITH HEAT TRACE
A
FOR ADDITIONAL CONTROL SYMBOLS & ABBREVIATIONS.
REFER TO HVAC CONTROL SCHEMATIC DRAWINGS
APPLICABLE.
AND APPLIES TO THE SET OF DRAWINGS TO THE EXTENT
THIS LEGEND IS COMPOSED OF STANDARD SYMBOLS
B
SELF OPERATED VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
ROOM THERMOSTAT
HUMIDISTAT
CARBON DIOXIDE SENSOR
MOTOR STARTER
VARIABLE FREQUENCY DRIVE
(C=CLOSED; NC=NORMALLY CLOSED; NO=NORMALLY OPEN)
FAN
STEAM HUMIDIFIER
DUCT CAP
PARALLEL BLADE AIR DAMPER
OPPOSED AIR DAMPER
AIR FLOW MEASURING STATION
DRAWING NOTE HEX
CONNECT TO EXISTING
DETAIL OUTLINE
DETAIL OR SECTION BUBBLE
USE "LETTERS" FOR SECTIONS
USE "NUMBERS" FOR DETAILS
EQUIPMENT MARK NUMBER
SHEET NUMBER WHERE SECTION/DETAIL IS SHOWN
ABBREVIATION OF ITEM
M002
DRANSMAN FYE NADER
MECHANCIAL ABBREVIATIONS
COORDINATOR ENGINEERING CHIEF
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
655 Eden Park Drive
Cincinnati, OH 45202-6000
FAX 513 621 6530
WEB www.kzf.com
Architecture | Engineering | Interiors | Planning
W
02.10.10
KZF Project# 5664.07
BUILDING 20248
RECONFIGURE VISUALIZATION LAB, F/20248
WPAFB Project# 090036
100% SUBMITTAL: 10 FEBRUARY 2010
STANDARD MECHANICAL ABBREVIATIONS
NOTES:
AAD
AAV
A/C
ACCU
ACM
ACU
AD
AF
AFC
AFF
AFG
AHU
AL
ALV
AP
AS
ATV
AV
AW
AWV
AUTOMATIC AIR DAMPER
AUTOMATIC AIR VENT
AIR CONDITIONING
AIR COOLED CONDENSING UNIT
AIR COMPRESSOR
AIR CONDITIONING UNIT
AREA DRAIN
AIR FILTER
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
ALUMINUM
ALARM VALVE
ACCESS PANEL
AIR SEPARATOR
ATMOSPHERIC VENT
AIR VENT
ACID RESISTANT WASTE
ACID RESISTANT WASTE VENT
BC
BD
BDD
BDV
BFP
BH
BHP
BOD
BOP
BP
BT
BOT
BTU
BTUH
BWV
BASEBOARD CONVECTOR
BYPASS DAMPER
BALL DRIP VALVE
BACKFLOW PREVENTER
BOX HYDRANT
BRAKE HORSEPOWER
BOTTOM OF DUCT
BOTTOM OF PIPE
BOOSTER PUMP
BATHTUB
BOTTOM
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
BACK WATER VALVE
C
CA
CB
CC ****
CC ****
CD ****
CD ****
CDWR
CDWS
CF
CFH
CFM
CH
CI
CIP
CKV
CO
COMP
COND
CR
CS
CSW
CT
CU ****
CU ****
CUH
C
CVR
CENTIGRADE TEMPERATURE
COMPRESSED AIR
CATCH BASIN
COOLING COIL
CABINET CONVECTOR
CEILING DIFFUSER
CONDENSATE DRAIN
CHILLED DRINKING WATER RETURN
CHILLED DRINKING WATER SUPPLY
CHEMICAL FEED
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CHILLER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CAST IRON
CAST IRON PIPE
CHECK VALVE
CLEANOUT
COMPRESSOR
CONDENSATE
CONDENSATE RETURN (STEAM)
CUP SINK
COLD SOFT WATER
COOLING TOWER
CONDENSING UNIT
COPPER
CABINET UNIT HEATER
COEFFICIENT, VALVE FLOW
CONSTANT VOLUME REHEAT BOX
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DB ****
DB ****
DCW
DD
DF
DHW
DHWR
DHWS
DI
DIA
DM
DN
DPI
DPS
DPT
DPR
DPV
DS
DV
DW
DWG
DECIBEL
DOMESTIC COLD WATER
DECK DRAIN
DRINKING FOUNTAIN
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER SUPPLY
DEIONIZED WATER
DIAMETER
DAMPER MOTOR
DOWN
DIFFERENTIAL PRESSURE INDICATOR
DIFFERENTIAL PRESSURE SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
DAMPER
DRY PIPE VALVE
DOWNSPOUT
DELUGE VALVE
DISTILLED WATER
DRAWING
EA
EADB
EARH
EAWB
EB
EF
EFF
EG
EH
EJ
EP
ES
ESEW
ESW
ET
EW
EWC
EWT
EXH
EXT
EXHAUST AIR
ENTERING AIR RELATIVE HUMIDITY
ELECTRIC BELL
EXHAUST AIR FAN
EFFICIENCY
EXHAUST AIR GRILLE
EXHAUST HOOD
EXPANSION JOINT
ELECTRIC PNEUMATIC
EMERGENCY SHOWER
EMERGENCY SHOWER & EYE WASH
EXTENDED SIDE WALL SPRINKLER
EXPANSION TANK
EMERGENCY EYE WASH
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
EXHAUST
EXISTING
EXTERNAL
FA
FCU
FD ****
FD ****
FDC
FDV
FDVC
FE
FEC
FH ****
FH ****
FHC
FHR
FHS
FLR
FMD
FOR
FOS
FOV
FPM
FPS
FS
FT
FU
FW
FPWH
FPYW
FAHRENHEIT TEMPERATURE
FIRE ALARM
FAN COIL UNIT
FIRE DAMPER
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FIRE DEPARTMENT VALVE
FIRE DEPARTMENT VALVE CABINET
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE HYDRANT
FUME HOOD
FIRE HOSE CABINET
FIRE HOSE RACK
FIRE HOSE STATION
FLOOR
FLOW MEASURING DEVICE
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
FEET PER MINUTE
FEET PER SECOND
FLOW SWITCH
FEET
FIXTURE UNIT
FEED WATER (BOILER)
G
GA
GAL
GALV
GCO
GO
GP
GDH
GPH
GPM
GPR
GAS
GAUGE OR GAGE
GALLON
GALVANIZED
GRADE CLEANOUT
GAS OUTLET
GAS PANEL
GAS DUCT HEATER
GALLONS PER HOUR
GALLONS PER MINUTE
GAS PRESSURE REGULATOR
H **** H ****
HB
HC
HD
HG
HO
HP
HPC
HPS
HR
HS
HSW
HTG
HVU
HWR
HWS
HX
HZ
HUMIDIFIER
HUMIDISTAT
HOSE BIBB
HEATING COIL
HUB DRAIN
HOT GAS (REFRIGERANT)
HUB OUTLET
HORSEPOWER
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM SUPPLY
HOUR
HOSE STATION
HOT SOFT WATER
HEATING
HEATING & VENTILATING UNIT
HEATING WATER RETURN
HEATING WATER SUPPLY
HEAT EXCHANGER
HERTZ
IA
ID
IE
IFB
IG
IH
IN
INV
ITC
IU
IW
INSTRUMENT COMPRESSED AIR
INSIDE DIAMETER
INVERT ELEVATION
INTEGRAL FACE & BYPASS
INTAKE GRILLE
INTAKE HOOD
INCHES
INVERT
INSPECTOR’S TEST CONNECTION
INDUCTION UNIT
INDIRECT WASTE
JS
KW
KWH
JANITOR’S SINK
KILOWATT
KILOWATT-HOUR
M
MA ****
MA ****
MADB
MARH
MAV
MAWB
MAX
MB
MBD
MBH
MCT
MECH
MH
MIN
MPC
MPS
MR
MTK
MV
MAIN CONTROL AIR SUPPLY
MEDICAL COMPRESSED AIR
MIXED AIR
MIXED AIR RELATIVE HUMIDITY
MANUAL AIR VENT
MAXIMUM
MIXING BOX
MANUAL BALANCING DAMPER
MARKED CEILING TILE
MECHANICAL
MANHOLE
MINIMUM
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM SUPPLY
MOP RECEPTOR
MAIN HALON TANK
MEDICAL VACUUM
N
NO
N O
NPSH
NTS
NITROGEN
NORMALLY CLOSED
NORMALLY OPEN
NITROUS OXIDE
NET POSITIVE SUCTION HEAD
NOT TO SCALE
O
OA
OADB
OAI
OARH
OAWB
OBD
OD
OS&Y
OXYGEN
OUTSIDE AIR
OUTSIDE AIR INTAKE
OUTSIDE AIR RELATIVE HUMIDITY
OPPOSED BLADE DAMPER
OUTSIDE DIAMETER
OUTSIDE SCREW & YOKE
PBD
PCV
PE
PF
PH
PI
PIV
PRS
PRV
PS
PSC
PSF
PSI
PSIA
PSIG
PV
PRESSURE GAUGE
PARALLEL BLADE DAMPER
PREHEAT COIL
PRESSURE CONTROL VALVE
PROCESS DRAIN
PNEUMATIC ELECTRIC
PHASE
PRESSURE INDICATOR
POST INDICATOR VALVE
PRESSURE REDUCING STATION
PRESSURE REDUCING VALVE
PRESSURE SWITCH
POST SIAMESE CONNECTION
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH - ABSOLUTE
POUNDS PER SQUARE INCH - GAUGE
PROCESS VENT
QV QUICK OPENING VALVE
SA ****
SA ****
SADB
SAN
SARH
SAWB
SB
SCH
SCV
SD ****
SD ****
SDA
SF ****
SF ****
SFM
SG
SH
SK
SMC
SP ****
SP ****
SPRK
SQIN
SR
ST ****
ST ****
STM
SV
SW
SUPPLY AIR
SHOCK ABSORBER
SANITARY SEWER
SUPPLY AIR RELATIVE HUMIDITY
SITZ BATH
SPEED CONTROL
SCHEDULE
SECTIONALIZING CONTROL VALVE
SMOKE DETECTOR
SUBSOIL TILE DRAIN
SOUND ATTENUATOR
SUPPLY AIR FAN
SQUARE FOOT
SUPPLY AIR GRILLE
SHOWER
SINK
SIAMESE CONNECTION
STANDPIPE
STATIC PRESSURE
SPRINKLER
SQUARE INCHES
SUPPLY RISER
STAINLESS STEEL
SERVICE SINK
STEAM TRAP
STORM SEWER
STEAM
SAFETY VALVE
SIDE WALL SPRINKLER
T
T&PV
TB
TCP
TCV
TEMP
TG
TK
TOD
TOP
TR
TS ****
TS ****
TV
TW
TYP
THERMOSTAT
TEMPERATURE & PRESSURE RELIEF VALVE
THRUST BLOCK
TEMPERATURE CONTROL PANEL
TEMPERATURE CONTROL VALVE
TRENCH DRAIN
TEMPERATURE
TRANSFER AIR GRILLE
TANK
TOP OF DUCT
TOP OF PIPE
TEMPERED WATER RETURN
TAMPER SWITCH
TEMPERED WATER SUPPLY
TURNING VANES
TREATED WATER
TYPICAL
UC
UG
UH
UR
UV
UN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .