FFP Addendum 1.docx

DOCX document 13 KB Posted

Attached to
Reconfiguration of Visualization Laboratory Federal contract opportunity
Solicitation number
FA8601-10-B-0006
Issued by
Department of the Air Force Materiel Command

About this file

Addedum 1

View the file

Other files for this federal contract opportunity

Other files attached to Reconfiguration of Visualization Laboratory, newest first.
File Type Posted
Map of Twin Base Golf Course.pdf PDF
BID OPENING.docx DOCX document
RECONFIGURE VIZUALIZATION LAB- Site Visit Roster.docx DOCX document
090036_RFI 3 Response.docx DOCX document
090036_RFI 2- Response.docx DOCX document
090036_RFI 1.docx DOCX document
Specs Addendum 1_Section 01 01 50.pdf PDF
Project Drawings.pdf PDF
General Wage Decision 30 July_OH 29.docx DOCX document
Project Specifications.pdf PDF
FA8601-10-B-0006 Solicitation.pdf PDF
Drawing Addendum 2_Cable Tray Routing.pdf PDF
Specs Addendum 1_Section 01 33 00.pdf PDF
FFP Addendum 2.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 1

TO

DRAWINGS AND SPECIFICATIONS

FOR

Reconfigure Visualization Lab, Facility 20248

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

PROJECT NUMBER: ZHTV 090036

1. The contract Drawings and Specifications are hereby amended in part as follows:

A. On sheet E101 provide (1) P1A type fixture instead of the (1) R2 type fixture and (1) R2A type fixture shown in room 305B. Adjust the ceiling grid layout so that the fixture is centered in the room. See sheet E301 for light fixture schedule.

B. On sheet E101 provide (1) R4A type fixture instead of the (1) R1 type fixture and (1) R1A type fixture shown in room 305A. Adjust the ceiling grid layout so that the fixture is centered in the room. See sheet E301 for light fixture schedule.

C. On sheet E101 provide (2) R4 type fixtures and (1) R4A type fixture instead of the (3) R1 type fixture and (2) R1A type fixture shown in room 306A. Adjust the ceiling grid layout so that the overall fixture layout is centered in the room. See sheet E301 for light fixture schedule.

D. Replace specification section 01 01 50 (Project General Requirements) and section 01 33 00 (Submittal Procedures) with the revised versions dated 03/10. A copy of the revised section is attached.

2. This Addendum Number 1 hereby forms and is made a part of the above named project drawings and specifications.

24 March 2010