FFP Addendum 1.docx
DOCX document 13 KB Posted
- Attached to
- Reconfiguration of Visualization Laboratory Federal contract opportunity
- Solicitation number
- FA8601-10-B-0006
About this file
Addedum 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Map of Twin Base Golf Course.pdf | ||
| BID OPENING.docx | DOCX document | |
| RECONFIGURE VIZUALIZATION LAB- Site Visit Roster.docx | DOCX document | |
| 090036_RFI 3 Response.docx | DOCX document | |
| 090036_RFI 2- Response.docx | DOCX document | |
| 090036_RFI 1.docx | DOCX document | |
| Specs Addendum 1_Section 01 01 50.pdf | ||
| Project Drawings.pdf | ||
| General Wage Decision 30 July_OH 29.docx | DOCX document | |
| Project Specifications.pdf | ||
| FA8601-10-B-0006 Solicitation.pdf | ||
| Drawing Addendum 2_Cable Tray Routing.pdf | ||
| Specs Addendum 1_Section 01 33 00.pdf | ||
| FFP Addendum 2.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER 1
TO
DRAWINGS AND SPECIFICATIONS
FOR
Reconfigure Visualization Lab, Facility 20248
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: ZHTV 090036
1. The contract Drawings and Specifications are hereby amended in part as follows:
A. On sheet E101 provide (1) P1A type fixture instead of the (1) R2 type fixture and (1) R2A type fixture shown in room 305B. Adjust the ceiling grid layout so that the fixture is centered in the room. See sheet E301 for light fixture schedule.
B. On sheet E101 provide (1) R4A type fixture instead of the (1) R1 type fixture and (1) R1A type fixture shown in room 305A. Adjust the ceiling grid layout so that the fixture is centered in the room. See sheet E301 for light fixture schedule.
C. On sheet E101 provide (2) R4 type fixtures and (1) R4A type fixture instead of the (3) R1 type fixture and (2) R1A type fixture shown in room 306A. Adjust the ceiling grid layout so that the overall fixture layout is centered in the room. See sheet E301 for light fixture schedule.
D. Replace specification section 01 01 50 (Project General Requirements) and section 01 33 00 (Submittal Procedures) with the revised versions dated 03/10. A copy of the revised section is attached.
2. This Addendum Number 1 hereby forms and is made a part of the above named project drawings and specifications.
24 March 2010