This is a Purchase Description document for federal contract B20128 issued on 23 September 2025 for a De-ionized (DI) Water System to be delivered to the 402d Commodities Maintenance Group (CMXG) at Warner Robins Air Logistics Complex, Robins Air Force Base, Georgia.

The contractor must provide a complete two-unit DI water system comprised of duplicate Reverse Osmosis (RO) skids with downstream Electrolyzed De-ionization units capable of producing a minimum of 25 gallons per minute with simultaneous operation capability. The system includes two RO units (Part # PGI38), two Electro-Deionization units (Part # EDI650), two Single Phase Step Down Transformers (Part # C1F005XES), two Anti-Scaling Assemblies (Part # 821030-A), two Chlorine Destruct Assemblies (Part # 821030-CD), and one Dual Alternating Lead/Lag Controller (Part # 430006). The system must fit within a 10' by 10' space and integrate with existing distribution pumps and control valves. Delivery is required within 6 months of award to 123 Eagle St., B20128, Robins AFB, GA 31098, Attention: Thomas Decker (Primary Government Representative) or Kyle Hathaway (Alternate).

The contractor must perform installation, connect piping to existing water supply and storage tank, install electrical connections, provide one day of start-up training for six government personnel, and provide technical support for future membrane changes. The contractor shall establish and maintain a safety program per OSHA standards, complete Environmental Management Systems (EMS) and Energy Management System (EnMS) awareness training, submit a Safety Plan within 10 calendar days of award, implement supply chain risk management procedures, and process all invoices and receiving reports through the Wide Area Workflow (WAWF) system. No options, government-furnished equipment, or appendices are included with this requirement.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

B20128 – DI Water System

23 September 2025

1.0 DESCRIPTION. The Contractor shall provide all the materials, parts, travel, tools, training, and labor necessary to provide a complete two (2) De-ionized (DI) water system to the 402d Commodies Maintenance Group (CMXG) Warner Robins Air Logistics Complex (WR- ALC) at Robins Air Force Base (AFB), Georgia.

1.1 The contractor shall provide start-up training and verification of the equipment to CMXG personnel. This system shall be comprised of duplicate Reverse Osmosis (RO) skids that will alternate usage and have Electrolyzed De-ionization units downstream of them to further purify our process water. These units shall produce at a minimum of 25gpm and shall have the ability to run simultaneously if the water demand increases. This DI system shall be able to accommodate existing distribution pumps and control valves and integrate them into its local logic. De-scaling and chlorination injectors shall be provided by the contractor to extend the lifecycle of the membranes on the system. This DI system shall also, due to spatial constraints in the installation location, fit within a 10’ by 10’ square. The contractor shall handle piping tie-ins to existing water supply and distribution to the existing DI storage tank. Additional specifications can be listed in sub-bullet lists.

1.2 Included items:

Description Quantity Serial # Part #

Reverse Osmosis 2 TBD PGI38 Electro-Deionization Units 2 TBD EDI650 Single Phase Step Down Transformer 2 TBD C1F005XES Anti-Scaling Assembly 2 TBD 821030-A Chlorine Destruct Assembly 2 TBD 821030-CD Dual Alternating Lead/Lag Controller 1 TBD 430006

2.0 Service Support.

2.1 Delivery.

2.1.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for the 402d Commodies Maintenance Group (CMXG). Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

The following individuals will serve as Government Representatives for CMXG.

2.2 Shipping/Delivery/Period of Performance. The Contractor shall provide delivery within 6 months of award.

2.3 Ship To Address.

Attention: Thomas Decker

Unit: 402 CMXG/MXDEA

DODAAC: F3QCCM

Address: 123 Eagle St., B20128, Robins AFB, GA 31098

2.4 Incidental Services.

2.4.1 Installation. The contractor will set the equipment per their equipment layout. They will install the connections from incoming feedwater, as well as outgoing (to the storage tank). They will install electrical connections to pre-ran electrical drops done by MXSG.

2.4.2 Training. Six (6) Government personnel will require training over the course of one day.

2.4.3 Technical Support. The membranes will need to be changed every few years on the RO portion of the system.

2.5 Warranty. The Contractor shall provide services to the Customer as outlined in Seller's

Documentation. All work will be carried out with due care and attention and that Seller will use suitably qualified personnel. In the event of a warranty claim, Seller shall, at its sole option and as Customer's sole remedy, repeat the service at its own expense or refund the service fee actually paid to Seller. If Seller determines that any warranty claim is not, in fact, covered by this service warranty, Customer shall pay Seller its then customary charges for any additionally required service. Seller's service warranty is conditioned on Customer's (a) operating and maintaining the Equipment in accordance with Seller's instructions, (b) not making any unauthorized repairs or alterations which affect the service, and (c) not being in default of any payment obligation to Seller. Seller's service warranty does not cover damage caused by negligent operation of the water system by Customer, chemical action or abrasive material or misuse which has damaged the equipment serviced, usage of non-potable feed water with SDI equipment, or improper installation. The warranties set forth in this section are seller's sole and exclusive warranties. Seller makes no other warranties of any kind, express or implied, including without limitation, any warranty of merchantability or fitness for purpose.

Primary Government Representative Alternate Government Representative Name: Thomas Decker Name: Kyle Hathaway Unit: 402 CMXG/MXDEA Unit: 402 CMXG/MXDEA Phone: 478-960-9884 Phone: 478-222-4087 Email: thomas.decker.6@us.af.mil Email: kyle.hathaway.3@us.af.mil

2.6 Options. None.

3.0 Government Furnished Equipment and Services or Government Furnished Property (GFP) and services. None.

4.0 General Information.

4.1 Contractor Program Manager. Not Required

4.2 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building B20128 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 8:00 am to 3:00 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.

4.3 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.4 Security Requirements.

4.4.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Base Defense Operations.

4.4.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 32 CFR Part 117.21, National Industrial Security Program Operating Manual (NISPOM).

4.4.3 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base.

The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).

4.4.4 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security (OPSEC) Program”, DoD Manual 5205.02 “DoD Operations Security (OPSEC) Program Manual” and AFI 10-701 “Operations Security (OPSEC)” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.4.5 Security Incident or Violation. The Contractor shall immediately notify the

Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.5 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:

DoDI5000.83 DAFI 63-113, Program Protection Planning for Life Cycle

Management, SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and

Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53

Rev 5, Security and Privacy Controls for Information Systems and Organizations.

4.6 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.

4.7 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base

Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry. Information may be obtained by calling the following phone number: Commercial 478-222-1972.

4.8 Agency Affirmative Procurement Program. In accordance with FAR 23.107-1 and

FAR 23.107-2, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an http://www.biopreferred.gov/ item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.8.1 The Contractor shall provide estimates and verification of recovered material for

EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

4.9 Environmental Management Systems (EMS) Awareness. Environmental Management

Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes.

Failure to provide documentation of EMS Training may result in termination of the contract.

4.9.1 EMS training is provided by Environmental Management. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926-1176)

4.9.2 Option 1: Contractors can register for an account through The Environmental

Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f

Search for Course ID: EMS110UHHZ00293 Directions:

1. Hover your mouse over the Courses and Transcripts tab.

2. Click on Transcripts

3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.

4. When you are on the transcript, click on the blue “Search for Course” button.

5. When the pop up appears enter the course name or course number and press search.

6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.

(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)

4.9.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training

PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, jessica.parker.15@us.af.mil. Once the presentation is received, the https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:jessica.parker.15@us.af.mil contractor is responsible for ensuring that all his/her employees view the training.

(CDRL A001 DI-MGMT-80368A/T, Status Report/EMS Training)

4.10 ISO 50001-Energy Management System. Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

4.10.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

4.10.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.

4.10.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract. (CDRL A002 DI-MGMT-80368A/T, Status Report/EnMS Training)

4.11 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.11.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-

596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A003, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).

4.11.2 The Contractor Safety Plan shall address in detail the items listed in the Contract

Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance.

The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.12 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the

Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478) 926-3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), Contract Surveillance Management Office (CSMO) Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information

(CDRL A004, DI-SAFT-81563 NOT 2, Accident/Incident Report)

4.13 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76-7023, Continuation of Essential Contractor Services.

4.14 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

4.15 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:

https://piee.eb.mil/

5.0 Appendices. None