About this file

This is a Questions and Answers document for Air Force Sustainment Center solicitation FA857126Q3000, containing clarifications on technical specifications for two cage systems: a Production Support Center (PSC) cage and a Pylon Wing Interface (PWI) cage being procured for Robins Air Force Base.

For the PSC cage, responses clarify that mesh specifications are 2" x 2" x 10 gauge; door heights are 10' x 10'; padlock hasp locks are required; wire decking is 48" deep (with 42" deep frames plus 3" frame thickness on each side); beam level capacity should be 2,500 lbs or higher; both the 4' swing door and 10' sliding door are positioned on the 105' face; and the cage is four-sided (freestanding, not against walls). For the PWI cage, the government confirms that existing upright beams are already in place and only wire decking is needed; beam level capacity specification is not applicable; the cage is four-sided; and wire decking should be 48" deep. Key clarifications address that contractors must supply complete assemblies (not just panels), that slotted uprights may be substituted with teardrop-punched uprights, that the two-row configuration requires 18 frames rather than 17, and that unloading will occur on a first-come, first-served basis with the facility expediter, with no unloading during lunch hours (11:00 AM to 11:45 AM). The Q&A period closed on March 5, 2026.

View the file

Other files for this federal contract opportunity

Other files attached to BAF 78384 PSC & PWI Cage Material Robins AFB, newest first.
File Type Posted
PD Hughey Revised.pdf PDF
PD Hughey Revised.docx DOCX document
Q and A FA857126Q3000 Updated 05 March 2026.docx DOCX document
Q and A FA857126Q3000 Updated 04 March 2026.docx DOCX document
B125_ PSC Cage.pdf PDF
B125_ PWI Cage.pdf PDF
Q and A FA857126Q3000 Updated 26 Feb 2026.docx DOCX document
Q and A FA857126Q3000.docx DOCX document
Combo Solicitation PSC and PWI Cage Material.pdf PDF
PD.pdf PDF
Provisions and Clauses list 1.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Responses

1. Can you confirm is mesh on the cage should be 2” x 2” x 10ga OR if it is DEA? Yes, Mesh 2” x 2 X 10ga

2. What is the height of the doors requested. 10’ X 10’

3. Are you needing a padlock hasp lock for the doors? Yes

PSC cage:

1. This shows 42” deep frames with 48” deep wire decking. Should the wire deck be 42”d, or are the frames actually 48”d? The wire decking is 48” because the distance between the frames is 42” and each frame is 3’ thick. 42” + 3” + 3” = 48”

2. There is no beam level capacity noted, but the wire decking capacity is listed at 2500 lbs. Are you looking for 2500 lbs beam level capacity? Beam level 2500 or higher

3. Will the 4’ swing door and the 10’ sliding door both be on the 105’ face of the cage? Yes

4. Is the cage 2,3, or 4 sided? In other words, is the cage in a corner of the room (2 sided), against a back wall (3 sided) or not against any wall (4 sided). 4 sided

PWI cage:

1. There is a requirement for wire decks, but no mention of uprights or beams needed. Do you have a counts and sizes for these? We already have the upright beams for this cage.

2. There is no beam level capacity noted, but the wire decking capacity is listed at 2500 lbs. Are you looking for 2500 lbs beam level capacity? N/A

3. Is the cage 2,3, or 4 sided? In other words, is the cage in a corner of the room (2 sided), against a back wall (3 sided) or not against any wall (4 sided). 4 sided

Assuming they are requesting a continuous run of racking, if there are (16) each 8’ wide sections, you would require 17 frames (uprights), not 18. 18 frames (uprights) would give you (17) each 8’ wide sections.

The run is not continuous it’s two row that why extra frames upright is needed.

Can you let us know which way to quote? Also, it mentions that the frames are 42” deep, but the wire decking is 48” deep. Let us know which depth the customer requires.

Wire decking 48 “ deep.

1. We do not provide the pallet racks; we only supply the pallet rack panels and doors that attach to the racks. Do you have a layout for this?

You have to supply everything in the order to be acceptable.

2. Could you please provide the layouts or drawings for the requested cages so that we can ensure our quote matches the exact requirements?

Drawings were already posted to SAM.gov.

1. Asking for slotted uprights – we manufacture a teardrop punched uprights. Will that work? Yes

2. The wire deck depth should be the same as the upright – I have attached a wire deck specification sheet if that would help. You are asking for wire decks that don't match the frame depth? Yes, I would like 48" deep rack frame with 48" deep wire deck

1. For CLIN 0002 (PWI Cage), the PD states wire decking is required for existing uprights and beams.

In order to quote accurately, can you please provide:

• Existing upright depth (in inches)

• Existing beam length (in inches)

• Beam inside step type/depth

• Number of beam levels requiring decking We have acquired the wire decking for the PWI cage.

NOTE: PD has been revised to show this change in section 1.1

2. For delivery coordination purposes, can you confirm whether unloading equipment (forklift) will be available at Building 125, Dock 2 at time of delivery?

We call for an expediter once the driver arrives, they will unload delivery as soon as they can. It’s a First Come First Services system. The expediter takes lunch from 11:00 AM to 11:45 AM no unloading.

File details come from the government source that posted it. Updated .