FA855218R00050005.pdf
PDF 21 KB Posted
- Attached to
- HH-60G Degraded Visual Environment System(DVES)
- Solicitation number
- FA8552-18-R-0005
About this file
Amendment #5
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JU
2. AMENDMENT/MODIFICATION NO.
FA8552-18-R-0005-0005
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Leigh Ann Taylor/WIUKB leigh.taylor.3@us.af.mil Phone: (478) 926- 7441 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8552
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA855218R0005
9B. DATED (SEE ITEM 11)
31-JUL-2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to identify changes to the Section L- Instructions, Conditions and Notices to Offerors, PWS, SRD, RFP, Attachment 2- Sustainment Technical Acceptability Matrix, as follows:
RFP Amendment 5 Changes
Section L Changes
1. Section L Table II.A- The requirement for Voluntary Protection Program
Information has been removed.
2. Section L II.E.1.9- The paragraph has been revised as follows: “All offerors and major subcontractors shall provide data other than certified cost and pricing data using spreadsheet Cost Formats A, B, and C (see RFP Attachment 3) along with accompanying schedules, lists, and narratives to substantiate the cost realism for CLIN(s) 0001, 0002, 0003, 0005, and 0006.”
PWS Changes
1. PWS paragraph 3.3 has been amended as follows: The Contractor shall be responsible for all repair/maintenance of the HH-60G DVES system and Contractor Furnished Equipment (CFE) support equipment, beginning with DVES modification effort, up to the NRE PoP completion.
The Contractor shall be responsible for correcting all quality deficiencies for all assets delivered under the entire contract.
2. PWS paragraph 3.11.6 has been amended to remove the phrase “at no additional cost to the Government.”
3. PWS Paragraph 3.15 has been amended to add “These kits shall contain B-kit Line Replaceable Unit (LRU) components.”
SRD Changes
1. SRD paragraph 4.6.2.5- “on-operational” has been corrected to
“non-operational.”
2. SRD paragraph 4.7.3.3- the word “may” has been removed.
RFP Attachment 2: Sustainment Technical Acceptability Matrix Changes
1. Row added for SRD paragraph 3.7.2.2.2.
2. Column C for row associated with SRD paragraph 3.9.3.3 amended to:
Amendment/Modification FA8552-18-R-0005-0005
“Routine maintenance actions for removal and replacement of DVES, exclusive of calibration/alignment, shall require no more than the existing HH-60G line maintenance tool kit (e.g. the General Mechanics Tool Kit (NSN: 5180-01-587-8129) and/or an Electrical Repairer Tool Kit (NSN:
5180-01-587-8128)). Use of boresight and calibration devices and aids are permitted.”
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages DVES_PWS_Rev_2.pdf Performance Work Statement
19SEP2018 44
PaveHawk_DVES_SRD_1_1.pdf System Requirements Document
19SEP2018 94
Attachment_2_Sustainment_Technical_Accept ability_Matrix.xlsx Sustainment Technical Acceptabilty Matrix
19SEP2018
File details come from the government source that posted it.