FA8552-18-R-0005_Round_2_Questions.pdf

PDF 67 KB Posted

Attached to
HH-60G Degraded Visual Environment System(DVES)
Solicitation number
FA8552-18-R-0005
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
PaveHawk_DVES_SRD_1_1.pdf PDF
Section_L_09182018.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
DVES_PWS_Rev_2.pdf PDF
FA855218R00050005.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
Attachment_3_Cost_Models.xlsx XLSX spreadsheet
Section_M_Evaluation_Factors_for_Award_09042018.pdf PDF
FA8552-18-R-0005_Round_1_Questions.pdf PDF
Amended_CDRLs_3_Sep_2018.pdf PDF
FA855218R00050004.pdf PDF
DVES_PWS_Rev_1.pdf PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors_09042018.pdf PDF
Attachment_1_Cross_Reference_Matrix.xlsx XLSX spreadsheet
FA855218R00050003.pdf PDF
FA855218R00050002.pdf PDF
TMCR_Attachment_4_TOLCVP_(DVES).pdf PDF
TMCR_Attachment_3_TOLCMP_(DVES).pdf PDF
TMCR_Attachment_2_Functionality_Matrix_(DVES).xlsx XLSX spreadsheet
TMCR_Attachment_1_AF_Business_Rules_(DVES).xlsx XLSX spreadsheet
DVES_Tech_Doc_Release_Agreement.pdf PDF
FA855218R00050001-Amendment.pdf PDF
FA855218R0005-Final.pdf PDF
DVES_PWS_Final_9_Jul.pdf PDF
Attachment_1_Cross_Reference_Matrix.pdf PDF
CDRLS_A001_A00A.pdf PDF
Special_Packaging_Instructions.pdf PDF
Signed_19_30143_QASP.PDF PDF
DVES_Tech_Doc_Release_Agreement.pdf PDF
CDRLS_A019_A01A.pdf PDF
PaveHawk_DVES_SRD_Final.pdf PDF
Attachment_3_Cost_Model_Spreadsheet.xlsx XLSX spreadsheet
CDRLS_A00M_A00X.pdf PDF
Attachment__4_Total_Resources_Volume.XLSX XLSX spreadsheet
FORM_158_Packaging_Requirements.pdf PDF
Section_M_Evaluation_Factors_For_Award.pdf PDF
CDRLS_A01B_A01L.pdf PDF
DVES_Government_Technical_Data_List.pdf PDF
CDRLS_A00B_A00L.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.pdf PDF
CDRL_A018_TMCR.PDF PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
CDRLS_A00Y_A017.pdf PDF
DD254_Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference Document Question Answer

1 N/A Is there a spare Ethernet port on the SMFCD or Gigabit Ethernet Switch available for DVES system use?

There are currently 4 Ethernet ports available on the SMFCD.

However, those ports are planned to be used for a future modification program, so the Ethernet ports are not available for DVES use.

2 N/A Is the physical mounting ICD for the AN/AAQ-29 gimbal (FLIR) onto the aircraft available?

The AN/AAQ-29 ICD is not available. However, The installation diagram, complete with part numbers, is available in the TO 1H-60(H)G-4-1, Figure 50.

3 RFP Are the requirements of FAR 52.216-11 Cost Contract - No Fee (APR 1984) only applicable to the Travel CLIN 0008?

It is intended that FAR 52.216-11 is applicable to the Travel CLIN (0008) only.

4 RFP

Regarding DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (OCT 2016), can you please identify the Covered Defense Information associated with this effort?

Covered Defense Information as it applies to the DVE system is define in DFARS 252.204-7301. Which means unclassified controlled technical information or other information that requires safeguarding or dissemination controls pursuant to and consistent with law, regulations, and Government wide policies. Technical information” means technical data or computer software, as those terms are defined in the clause at DFARS 252.227-7013, Rights in Technical Data-Non Commercial Items, regardless of whether or not the clause is incorporated in this solicitation or contract. Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, technical orders, catalog-item identifications, data sets, studies and analyses and related information, and computer software executable code and source code.

5 PWS What is the intent of the simulator kits? Will they be used for training or are they meant to “simulate” the DVES sensors for laboratory usage?

The simulator kits will be used to simulate the sensors for laboratory usage.

6 PWS If they are to be used for training, do we have a location where the simulators are? The simulators are at Kirtland AFB.

7 Section L II.A.2 Regarding Section L II.A.2 - Does 8.5” x 14” (Legal size) paper count as 1 or 2 pages in this page-limited environment.

Per Section L - Section L II.A.2 - Print shall be no smaller than a font size of 12 and in Times New Roman. Paper size shall be 8 1/2” X 11,” excluding any drawings, diagrams, and/or supporting illustrations, spreadsheets, etc. Charts, graphs, drawings, diagrams, supporting illustrations, or spreadsheets shall not be greater than 8 1/2” x 14.”. Under these conditions, paper count is 1 page.

FA8552-18-R-0005 Round 2 Questions

8 Section L II.E.1.9

The following is in respect to the government response to “FA8552-18-R- 0005 Round 1 Questions.pdf” question # 53. Substituting "major subcontractors" for "subcontractors valued at equal to or greater than $2Million" in Section L, Paragraph E.1.9 would result in “major subcontractors (for the entire effort to include Options)”.

The inclusion of the phrase “for the entire effort to include Options” after major subcontractors would be inconsistent with the definition of major subcontractors in Section L, Paragraph E.1.6 (page 8-9) which limits it to a $2M threshold “for CLIN(s) 0001, 0002, 0003, 0005, and 0006” only.

Please clarify whether the calculation for the $2M threshold for “major subcontractors” and the requirements for Section L, Paragraph E.1.9 “All offerors and subcontractors valued at equal to or greater than $2 Million (for the entire effort to include Options)” are to be calculated consistently, and if so should both be limited to “CLIN(s) 0001, 0002, 0003, 0005, and 0006” only.

As written currently in Section L, Paragraph E.1.9, we interpret the calculation for the $2M threshold to include Options CLINs 1001, 1002, 2001, 2002, 3001, 3002. If this is not the case, please amend instructions in Section L, Paragraph E.1.9 to remove the phrase “(for the entire effort to include Options)” and reference subcontractors as “major subcontractors consistent with Section L, Paragraph E.1.6 definition.

Section L II.E.1.9 paragraph has been amended as follows, "All offerors and major subcontractors shall provide data other than certified cost and pricing data using spreadsheet Cost Formats A, B, and C (see RFP Attachment 3) along with accompanying schedules, lists, and narratives to substantiate the cost realism for CLIN(s) 0001, 0002, 0003, 0005, and 0006."

9 PWS 4.12.3

Per the PWS, Section 4.12.3, are there any other requirements for the Voluntary Protection Plan other than any personnel working for the contractor will abide by the VPP at the site of installation?

There are no additional VPP requirements other than PWS paragraph 4.12.3.

10 CDRL A018 TMCR TM‐86‐01

PWS Section 3.10.2

It is not clear in CDRL A018/PWS 3.10.2 what scope should be bid for S1000D maintenance; please clarify.

Refer to TMCR paragraph 7. TO Development for S1000D requirements.

11 PWS 3.11.6

PWS Paragraph 3.11.6 mentions "at no additional cost to the Government", which language is not normally seen in a PWS. Please confirm this is a typo and should be deleted for these CPFF CLINs.

Because the effort described in PWS paragraph 3.11.6 is part of a Cost Plus Fixed Fee (CPFF) CLIN, this language is not required and has been removed from the paragraph.

12 PWS 3.3

Please confirm that this paragraph pertains to the NRE "PoP completion" only. There is no requirement for a warranty for the production kits (Option Periods I‐III)

PWS paragraph 3.3 does pertain to the NRE period of performance. The PWS has been revised to specify this.

13 PWS 3.16

PWS Paragraph 3.16 mentions "at no additional cost to the Government" with relation to the CPFF PI/VI CLINs. Incorporation of changes required during PI/VI will be performed on the respective CPFF CLINs. Please confirm that inclusion of the "at no additional cost to the Government" language is a typo and should be deleted for these CPFF CLINs.

PWS paragraph 3.16 refers to the production kits. As stated in the paragraph, "The kits shall be the final configuration resulting from the Government approved final TDP, incorporating all changes required during the PI and VI at no additional cost to the Government." Because the production kits are contained in the firm fixed price CLINs 1001, 2001, and 3001, the statement "at no additional cost to the Government" is appropriate and will remain in the PWS paragraph.

14 Section L.E.1.12

Other Direct Costs (ODCs) requires that “Offerors shall submit supporting schedules showing proposed ODCs, including their analysis. This cost data shall reconcile to the ODCs supported in the RFP Attachment 4, Excel Cost Model…” The Cost Model and Total Resources templates do not have any provision for bidding ODCs other than Travel. Shall the Offeror(s) add ODCs other than travel to the Cost Model Format A worksheets, together with adding additional worksheet(s) to provide the detail support for the proposed ODCs? What CLIN(s) should ODC’s other than Travel be bid against?

There is no addition of Travel in Format A. Travel is a proposable CLIN in Format C. Travel is not included in the TEP. If an offeror has ODC costs applicable to CLINs 0001, 0002, 0003, 0005, and 0006, the Format A can be adjusted to accommodate. Travel should not be proposed under CLINs 0001, 0002, 0003, 0005, and 0006 as there is a specific CLIN for that on Format C. ODC costs on CLINs other than 0001, 0002, 0003, 0005, and 0006, do not require a breakout as it will be a Firm Fixed Price.

15 Section L.E.1.12

The instructions for the Cost/Price proposal are silent regarding data required to support the proposed CLIN 0008 – Travel, which is Cost Reimbursable, No Fee. Please confirm that bidders only need to provide total cost for Travel in Section B of the RFP and in Cost Format C tab of Attachment 3. No supporting detail for travel is being requested.

As Stated in L&M "CLIN 0008 (CRNF): Travel will not be included in the TEP calculation. Travel should be proposed in Format C but will not evaluated within the TEP."

At industry day, a question was asked relative to the FFP nature of CLIN 0004 (Lab/Simulator Kits). The government response rationalizing the FFP CLIN type was that these kits are B‐kit components only and that ‘all the risk is in the A‐kit, which will not be delivered on this CLIN.’ If this is the intent of CLIN 0004, request that the government amend CLIN 0004 to add "(B‐kit components only)" since A Kits are not needed for lab/simulator kits.

PWS paragraph 3.15 has been amended to specify that the lab and simulator kits shall only contain Group B kit Line Replaceable Unit (LRU) components.

17 Section L II.A

The chart in Section L.II.A lists "Voluntary Protection Program Information" as part of Volume I; however, there are no other details in Section L or M defining what "Voluntary Protection Program Information" bidders should include in Volume I. Please clarify this requirement.

The Voluntary Protection Program Information is not required since "work being performed on an Air Force installation by contractor employees working 1,000 hours or more in any calendar quarter" is not anticipated. This requirement has been removed from Section L II.A.

18 PWS 3.8.10

Please clarify the Government's intent in PWS, Paragraph 3.8.10. The last sentence in the first paragraph states: "The Contractor shall provide any supporting data required for flight clearance authority to the Government."

Is the reference to “supporting data” meant to encompass only that which the contractor has previously created and/or delivered in support of this DVES contract? Please clarify that the Government did not intend this statement to be an open‐ended request for data that is not otherwise required to be delivered under the terms of this contract. Industry is concerned that this is an open ended requirement which cannot be properly scoped until the approved MACC/TACC has been completed. Please provide additional clarification that will allow this to be bid affordably and not bid cost in excess of the Government expectations for this requirement.

It is anticipated that the supporting data required for flight clearance will include documents that the contractor has already created when designing and certifying its system or documents developed for this DVES contract. However, specific document requirements cannot be defined at this point.

19 FA8552-18-R-0005 Round 1 Questions

The following is in respect to the government response to “FA8552-18-R- 0005 Round 1 Questions.pdf” question # 43. Please clarify your answer to question 43 where the Government stated “The maintenance and flight manuals are required to be delivered in both paper and IETM formats…”. Is it the Government’s intention for IETMs to be developed for aircrew manuals as part of this modification effort?

There no requirement for Flight Manuals to be delivered in IETM format. However, they will be delivered in paper for the as specified in Table 3.

20 FA8552-18-R-0005 Round 1 Questions

In the USG answer to question 46, USG stated that Attachment 4 had been updated. There was no attachment 4 included in Amendment 3. (Note:

Attachment 3 was updated)

The Government answer to FA8552-18-R-0005 Round 1 Questions #46 contained a typo. Attachment 3 was updated and posted to FBO. Attachment 4 has not been amended since the initial posting.