Attachment__4_Total_Resources_Volume.XLSX

XLSX spreadsheet 282 KB Posted

Attached to
HH-60G Degraded Visual Environment System(DVES)
Solicitation number
FA8552-18-R-0005
Issued by

About this file

Total Resources Volume

View the file

Other files

File Type Posted
PaveHawk_DVES_SRD_1_1.pdf PDF
Section_L_09182018.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
DVES_PWS_Rev_2.pdf PDF
FA855218R00050005.pdf PDF
FA8552-18-R-0005_Round_2_Questions.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
Attachment_3_Cost_Models.xlsx XLSX spreadsheet
Section_M_Evaluation_Factors_for_Award_09042018.pdf PDF
FA8552-18-R-0005_Round_1_Questions.pdf PDF
Amended_CDRLs_3_Sep_2018.pdf PDF
FA855218R00050004.pdf PDF
DVES_PWS_Rev_1.pdf PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors_09042018.pdf PDF
Attachment_1_Cross_Reference_Matrix.xlsx XLSX spreadsheet
FA855218R00050003.pdf PDF
FA855218R00050002.pdf PDF
TMCR_Attachment_4_TOLCVP_(DVES).pdf PDF
TMCR_Attachment_3_TOLCMP_(DVES).pdf PDF
TMCR_Attachment_2_Functionality_Matrix_(DVES).xlsx XLSX spreadsheet
TMCR_Attachment_1_AF_Business_Rules_(DVES).xlsx XLSX spreadsheet
DVES_Tech_Doc_Release_Agreement.pdf PDF
FA855218R00050001-Amendment.pdf PDF
FA855218R0005-Final.pdf PDF
DVES_PWS_Final_9_Jul.pdf PDF
Attachment_1_Cross_Reference_Matrix.pdf PDF
CDRLS_A001_A00A.pdf PDF
Special_Packaging_Instructions.pdf PDF
Signed_19_30143_QASP.PDF PDF
DVES_Tech_Doc_Release_Agreement.pdf PDF
CDRLS_A019_A01A.pdf PDF
PaveHawk_DVES_SRD_Final.pdf PDF
Attachment_3_Cost_Model_Spreadsheet.xlsx XLSX spreadsheet
CDRLS_A00M_A00X.pdf PDF
FORM_158_Packaging_Requirements.pdf PDF
Section_M_Evaluation_Factors_For_Award.pdf PDF
CDRLS_A01B_A01L.pdf PDF
DVES_Government_Technical_Data_List.pdf PDF
CDRLS_A00B_A00L.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.pdf PDF
CDRL_A018_TMCR.PDF PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
CDRLS_A00Y_A017.pdf PDF
DD254_Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOE Material Summary

Consolidated Bill(s) of Material located as a separate attachment files which were delivered with the Cost Volume and CD

SAMPLE-Labor Summary

An Employee of:Total of All Government Fiscal YearsLabor CategoryBOE Reference3.1 EMD, System Design
3.1.1 RFCM Prime Mission Equipment3.1.2 System Engineering3.1.3 Reserved3.1.4 Technology Readiness Assessment3.1.5 Critical Technology Demonstration3.1.6 Program Protection Plan3.1.7 Antenna Study3.1.8 Data Rights3.1.9 Lead Free Control Plan3.1.10 Corrosion Prevention and Control Plan3.1.11 Configuration Management3.1.12 Program Management3.1.13 Risk Management3.1.14 Subcontractor/ Supplier Management3.1.15 Data Management
Notional CWBS3.1.1.1 RFCM External Controls and Sustaining Engineering Planning3.1.1.2 RFCM Software Design3.1.1.3 RFCM Aircraft Interface and Compatibility Design3.1.2.1 Human Factors Engineering3.1.2.2 Interface Control Working Group3.1.2.3 Technical Performance Measures3.1.2.4 System Engineering Management Plan3.1.6.1 Inspection and Audit3.1.6.2 Cybersecurity3.1.6.3 Anti-Tamper3.1.6.4 Security3.1.6.5 Security Classification Data3.1.8.1 Unlimited Rights3.1.8.2 Government Purpose Rights3.1.8.3 Limited or Restricted Rights3.1.11.1 Data Accession List3.1.12.1 Contractor Integrated Performance Management3.1.12.2 Integrated Baseline Reviews3.1.12.3 Status Reports3.1.12.4 Contract Funds Status Report3.1.12.5 Integrated Master Schedule3.1.15.1 Data Repository3.1.15.2 Government Furnished Data
3.1.1.2.1 Software Functional Qualification Test3.1.1.3.1 Electrical3.1.1.3.2 Environmental Control3.1.1.3.3 Airworthiness Certification3.1.6.5.1 Safeguarding Classified Material3.1.15.2.1 Government Furnished Documentation
WBS/Item NumberWBS Description
1.0Electronic Warfare System
1.1Radio Frequency Counter Measures Prime Mission Product (RFCM PMP)
1.1.1RFCM Subsystem 1…n (specify)1.1.1 Total hours204
1.1.1.1SS1, Component 1
ABC Company1.1.1.1.1DesignSenior Engineer10
ABC Company1.1.1.1.2FabricateTechnician25
ABC CompanyJunior Engineer80
ABC CompanyMachinist15
ABC CompanyElectrical Engineer20
ABC Company1.1.1.1.3IntegrateSenior Engineer3
ABC CompanySystems Engineer20
ABC CompanyTechnician17
ABC Company1.1.1.1.4TestSenior Engineer4
Test Engineer10
1.1.1.2SS1, Component 2...n
1.1.1.#SIMILAR BREAKDOWN TO 1.1.1.1 EXAMPLE
1.1.2RFCM Software Release 1…n (specify)1.1.2 Total hours8050080
1.1.2.1CSCI 1
ABC Company1.1.2.1.1DesignSoftware Engineer20300
ABC Company1.1.2.1.2FabricateSoftware Engineer20100
ABC Company1.1.2.1.3IntegrateSoftware Engineer20100
ABC Company1.1.2.1.4TestSoftware Engineer2080
1.1.3RFCM Prime Mission Product Integration, Assembly, Test, and Checkout
1.2Platform Integration, Assembly, Test, and Checkout (Trial Kit Install)
1.3Systems Engineering (SE)
1.4Program Management (PM)
1.5System Test and Eval (ST&E)
1.5.1Developmental Test and Evaluation (DT&E)
1.5.2Operational Test and Evaluation (OT&E)
1.5.3Mock-ups/System Integration Labs (SILs)
1.5.4Test and Evaluation Support
1.5.5Test Facilities
1.6Training
1.6.1Equipment
1.6.2Services
1.6.3Facilities
1.7Data
1.7.1Technical Publications
1.7.2Engineering Data
1.7.3Management Data
1.7.4Support Data
1.7.5Data Repository
1.8Peculiar Support Equipment (PSE)
1.8.1Test and Measurement Equipment
1.8.2Support and Handling Equipment
1.9Common Support Equipment (CSE)
1.9.1Test and Measurement Equipment
1.9.2Support and Handling Equipment
1.10Operational/Site Activation
1.10.1System Assembly, Installation, and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Site Construction
1.10.4Site/Ship/Vehicle Conversion
1.10.5Sustainment/Interim Contractor Support
1.11Industrial Facilities
1.11.1Construction/Conversion/Expansion
1.11.2Equipment Acquisition or Modernization
1.11.3Maintenance (Industrial Facilities)
1.12Initial Spares and Repair Parts
1.13Anti Tamper/Program Protection
1.13.1Plan
1.13.2Implementation/Test

CLIN 0001 BOE Labor Summary

An Employee of:Labor CategoryBOE Reference3.2 Systems Engineering3.3 Maintenance Support3.4 Support Equipment3.5 Familiarization Source Data3.6 Orientation and Familiarization3.7 Software3.8 Engineering Analysis
3.2.1 System Performance Requirements3.2.2 Configuration Management3.2.3 Diminshing Manufacturing Sources and Material Shortages3.7.1 Software Transition and Use3.7.2 Software Development Plan (SDP)3.7.3 Computer Programming Manual (CPM)3.7.4 Software Requirements Specification (SRS)3.7.5 Software Transition Plan (STrP)3.7.6 Software Design Description (SDD)3.7.7 Software Product Specification (SPS)3.7.8 Software Version Description (SVD)3.7.9 Firmware Support Manual (FSM)3.7.10 Software Test Plan (STP)3.7.11 Software Test Description (STD)3.7.12 Software Test Report (STR)3.7.13 Software User Manual (SUM)3.7.14 Software Architecture Document (SAD)3.7.15 Integrated Development Environment (IDE)3.7.16 IDE Data Rights and Lcensing3.8.1 System Engineering Master Plan (SEMP)3.8.2 Materials and Processes3.8.3 Crash Load Factors3.8.4 Factor of Safety3.8.5 Strength and Deformation3.8.6 Human Factors3.8.7 Weight and Balance3.8.8 Electrical Power Distribution3.8.9 Technical Report-Studies/Services3.8.10 Airworthiness3.8.11 Cybersecurity/Information Assurance (IA)
Notional CWBS3.7.15.1 IDE Acceptance Test Plan (ATP)3.7.15.2 IDE Data Deliverables3.8.6.1 Pilot Vehicle Interface (PVI) and Maintainer Vehicle Interface (MVI) Analysis3.8.6.2 Human Engineering systems analysis Report (HESAR)3.8.6.3 Human Engineering Design Approach Document - Maintainer (HEDAD-M)3.8.11.1 Cybersecurity In Technical Data3.8.11.2 Cybersecurity Requirements3.8.11.3 System Architecture Analysis Report3.8.11.4 Security Assessment Plan (SAP)

WBS/Item Number WBS Description

Use or disclosure of proposal data on this sheet is subject to the restriction on the title page of this proposal or quotation.

BAE SYSTEMS Proprietary Information

CLIN 0001 BOE Labor Summary

&P

CLIN 0005 BOE Labor Summary

An Employee of:Labor CategoryBOE Reference3.2 Systems Engineering3.3 Maintenance Support3.4 Support Equipment3.5 Familiarization Source Data3.6 Orientation and Familiarization3.7 Software3.8 Engineering Analysis
3.2.1 System Performance Requirements3.2.2 Configuration Management3.2.3 Diminshing Manufacturing Sources and Material Shortages3.7.1 Software Transition and Use3.7.2 Software Development Plan (SDP)3.7.3 Computer Programming Manual (CPM)3.7.4 Software Requirements Specification (SRS)3.7.5 Software Transition Plan (STrP)3.7.6 Software Design Description (SDD)3.7.7 Software Product Specification (SPS)3.7.8 Software Version Description (SVD)3.7.9 Firmware Support Manual (FSM)3.7.10 Software Test Plan (STP)3.7.11 Software Test Description (STD)3.7.12 Software Test Report (STR)3.7.13 Software User Manual (SUM)3.7.14 Software Architecture Document (SAD)3.7.15 Integrated Development Environment (IDE)3.7.16 IDE Data Rights and Lcensing3.8.1 System Engineering Master Plan (SEMP)3.8.2 Materials and Processes3.8.3 Crash Load Factors3.8.4 Factor of Safety3.8.5 Strength and Deformation3.8.6 Human Factors3.8.7 Weight and Balance3.8.8 Electrical Power Distribution3.8.9 Technical Report-Studies/Services3.8.10 Airworthiness3.8.11 Cybersecurity/Information Assurance (IA)
Notional CWBS3.7.15.1 IDE Acceptance Test Plan (ATP)3.7.15.2 IDE Data Deliverables3.8.6.1 Pilot Vehicle Interface (PVI) and Maintainer Vehicle Interface (MVI) Analysis3.8.6.2 Human Engineering systems analysis Report (HESAR)3.8.6.3 Human Engineering Design Approach Document - Maintainer (HEDAD-M)3.8.11.1 Cybersecurity In Technical Data3.8.11.2 Cybersecurity Requirements3.8.11.3 System Architecture Analysis Report3.8.11.4 Security Assessment Plan (SAP)

WBS/Item Number WBS Description

Use or disclosure of proposal data on this sheet is subject to the restriction on the title page of this proposal or quotation.

BAE SYSTEMS Proprietary Information

CLIN 0006 BOE Labor Summary

An Employee of:Labor CategoryBOE Reference3.2 Systems Engineering3.3 Maintenance Support3.4 Support Equipment3.5 Familiarization Source Data3.6 Orientation and Familiarization3.7 Software3.8 Engineering Analysis
3.2.1 System Performance Requirements3.2.2 Configuration Management3.2.3 Diminshing Manufacturing Sources and Material Shortages3.7.1 Software Transition and Use3.7.2 Software Development Plan (SDP)3.7.3 Computer Programming Manual (CPM)3.7.4 Software Requirements Specification (SRS)3.7.5 Software Transition Plan (STrP)3.7.6 Software Design Description (SDD)3.7.7 Software Product Specification (SPS)3.7.8 Software Version Description (SVD)3.7.9 Firmware Support Manual (FSM)3.7.10 Software Test Plan (STP)3.7.11 Software Test Description (STD)3.7.12 Software Test Report (STR)3.7.13 Software User Manual (SUM)3.7.14 Software Architecture Document (SAD)3.7.15 Integrated Development Environment (IDE)3.7.16 IDE Data Rights and Lcensing3.8.1 System Engineering Master Plan (SEMP)3.8.2 Materials and Processes3.8.3 Crash Load Factors3.8.4 Factor of Safety3.8.5 Strength and Deformation3.8.6 Human Factors3.8.7 Weight and Balance3.8.8 Electrical Power Distribution3.8.9 Technical Report-Studies/Services3.8.10 Airworthiness3.8.11 Cybersecurity/Information Assurance (IA)
Notional CWBS3.7.15.1 IDE Acceptance Test Plan (ATP)3.7.15.2 IDE Data Deliverables3.8.6.1 Pilot Vehicle Interface (PVI) and Maintainer Vehicle Interface (MVI) Analysis3.8.6.2 Human Engineering systems analysis Report (HESAR)3.8.6.3 Human Engineering Design Approach Document - Maintainer (HEDAD-M)3.8.11.1 Cybersecurity In Technical Data3.8.11.2 Cybersecurity Requirements3.8.11.3 System Architecture Analysis Report3.8.11.4 Security Assessment Plan (SAP)

WBS/Item Number WBS Description

Use or disclosure of proposal data on this sheet is subject to the restriction on the title page of this proposal or quotation.

BAE SYSTEMS Proprietary Information

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.