FA855218R0005-Final.pdf

PDF 204 KB Posted

Attached to
HH-60G Degraded Visual Environment System(DVES)
Solicitation number
FA8552-18-R-0005
Issued by

About this file

RFP

View the file

Other files

File Type Posted
PaveHawk_DVES_SRD_1_1.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
Section_L_09182018.pdf PDF
DVES_PWS_Rev_2.pdf PDF
FA855218R00050005.pdf PDF
FA8552-18-R-0005_Round_2_Questions.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
Attachment_3_Cost_Models.xlsx XLSX spreadsheet
FA855218R00050004.pdf PDF
Section_M_Evaluation_Factors_for_Award_09042018.pdf PDF
FA8552-18-R-0005_Round_1_Questions.pdf PDF
Amended_CDRLs_3_Sep_2018.pdf PDF
DVES_PWS_Rev_1.pdf PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors_09042018.pdf PDF
Attachment_1_Cross_Reference_Matrix.xlsx XLSX spreadsheet
FA855218R00050003.pdf PDF
FA855218R00050002.pdf PDF
TMCR_Attachment_4_TOLCVP_(DVES).pdf PDF
TMCR_Attachment_3_TOLCMP_(DVES).pdf PDF
TMCR_Attachment_2_Functionality_Matrix_(DVES).xlsx XLSX spreadsheet
TMCR_Attachment_1_AF_Business_Rules_(DVES).xlsx XLSX spreadsheet
DVES_Tech_Doc_Release_Agreement.pdf PDF
FA855218R00050001-Amendment.pdf PDF
DVES_PWS_Final_9_Jul.pdf PDF
Attachment_1_Cross_Reference_Matrix.pdf PDF
Attachment__4_Total_Resources_Volume.XLSX XLSX spreadsheet
FORM_158_Packaging_Requirements.pdf PDF
Section_M_Evaluation_Factors_For_Award.pdf PDF
CDRLS_A01B_A01L.pdf PDF
DVES_Government_Technical_Data_List.pdf PDF
CDRLS_A001_A00A.pdf PDF
Special_Packaging_Instructions.pdf PDF
Signed_19_30143_QASP.PDF PDF
DVES_Tech_Doc_Release_Agreement.pdf PDF
CDRLS_A019_A01A.pdf PDF
PaveHawk_DVES_SRD_Final.pdf PDF
Attachment_3_Cost_Model_Spreadsheet.xlsx XLSX spreadsheet
CDRLS_A00M_A00X.pdf PDF
CDRLS_A00B_A00L.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.pdf PDF
CDRL_A018_TMCR.PDF PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
CDRLS_A00Y_A017.pdf PDF
DD254_Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8552-18-R-0005

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE:

8(A) SIZE STANDARD:

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *180

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8552

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Estimated

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

1-OCT-2018 4:30PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

BUYER: Leigh Ann Taylor/WIUKB leigh.taylor.3@us.af.mil Phone: (478) 926- 7441 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA855218R0005

DUE: 1 OCT 2018 4:30 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Leigh A Taylor/WIUKB

SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

FA8552-18-R-0005

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

BASIC CONTRACT PERIOD: The 24 month period effective from the date of contract award.

HH-60G Degraded Visual Environment Non-Recurring Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Non-Recurring Engineering IAW attached PWS Associated Document(s) Line Item(s)

FD20601930143 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

1 LO *24 Months

Proposed Delivery

1 LO

HH-60G Degraded Visual Environment Prototype Installation Kit

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 KT

Prototype Installation Kit Associated Document(s) Line Item(s)

FD20601930143 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 KT *18 Months

Proposed Delivery

A TBD 1 KT

HH-60G Degraded Visual Environment Verification Installation Kit

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 KT

Verification Installation Kit Associated Document(s) Line Item(s)

FD20601930143 0003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

HH-60G Degraded Visual Environment Verification Installation Kit

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery

A TBD 1 KT *22 Months

Proposed Delivery

A TBD 1 KT

HH-60G Degraded Visual Environment Lab/Simulator Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

6 KT

Lab/Simulator Kits

IAW PWS

Associated Document(s) Line Item(s)

FD20601930143 0004

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ F3QCBJ 6 KT *18 Months

Proposed Delivery

+ F3QCBJ 6 KT

HH-60G Degraded Visual Environment Prototype Installation Labor

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Prototype Installation Labor Associated Document(s) Line Item(s)

FD20601930143 0005

HH-60G Degraded Visual Environment Prototype Installation Labor

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 LO *18 Months

Proposed Delivery

A TBD 1 LO

HH-60G Degraded Visual Environment Verification Installation Labor

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Verification Installation Labor Associated Document(s) Line Item(s)

FD20601930143 0006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 LO *22 Months

Proposed

A TBD 1 LO

Data

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Data

DATA IAW DD1423

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Conference Agenda

Item No.

0007AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

Conference Agenda

+ IAW1423 1 LO

Conference Minutes

Item No.

0007AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A002-Conference Minutes

DI-ADMN-81250B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

Item No.

0007AC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A003-Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DI-PSSS-81656B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Scientific and Technical Reports

Item No.

0007AD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A004-Scientific and Technical Reports

DI-MISC-80711A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed

+ IAW1423 1 LO

Technical Manual Research and Analysis Source Data

Item No.

0007AE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A005-Technical Manual Research and Analysis Source Data

DI-TMSS-81354

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Training Materials

Item No.

0007AF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A006-Training Materials

DI-ILSS-80872

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Training Materials

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Development Plan (SDP)

Item No.

0007AG

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A007-Software Development Plan (SDP)

DI-IPSC-81427B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

System/Subsystem Specification (SSS)

Item No.

0007AH

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A008-System/Subsystem Specification (SSS)

System/Subsystem Specification (SSS)

DI-IPSC-81431A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Computer Programming Manual (CPM)

Item No.

0007AJ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A009-Computer Programming Manual (CPM)

DI-IPSC-81447A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Computer Programming Manual (CPM)

Proposed Delivery

+ IAW1423 1 LO

Software Requirements Specification (SRS)

Item No.

0007AK

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00A-Software Requirements Specification (SRS)

DI-IPSC-81433A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Transition Plan (STrP)

Item No.

0007AL

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00B-Software Transition Plan (STrP)

DI-IPSC-81429A

Associated Document(s) Line Item(s)

FD20601930143 0007

Software Transition Plan (STrP)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

System/Subsystem Design Description (SSDD)

Item No.

0007AM

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00C-System/Subsystem Design Description (SSDD)

DI-IPSC-81432A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Interface Design Description (IDD)

Item No.

0007AN

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00D-Interface Design Description (IDD)

DI-IPSC-81436A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Interface Control Document (ICD)

Item No.

0007AP

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00E-Interface Control Document (ICD)

DI-SESS-81248B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Interface Control Document (ICD)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Design Description (SDD)

Item No.

0007AQ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00F-Software Design Description (SDD)

DI-IPSC-81435A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Product Specification (SPS)

Item No.

0007AR

Not Separately Priced Quantity U/I Unit Price

A00G-Software Product Specification (SPS)

Software Product Specification (SPS)

DI-IPSC-81441A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Version Description (SVD)

Item No.

0007AS

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00H-Software Version Description (SVD)

DI-IPSC-81442A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Software Version Description (SVD)

Proposed Delivery

+ IAW1423 1 LO

Firmware Support Manual (FSM)

Item No.

0007AT

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00J-Firmware Support Manual (FSM)

DI-IPSC-81448B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Test Plan (STP)

Item No.

0007AU

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00K-Software Test Plan (STP)

DI-IPSC-81438A

Associated Document(s) Line Item(s)

FD20601930143 0007

Software Test Plan (STP)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Test Description (STD)

Item No.

0007AV

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00L-Software Test Description (STD)

DI-IPSC-81439A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Software Test Report (STR)

Item No.

0007AW

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00M-Software Test Report (STR)

DI-IPSC-81440A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software User Manual (SUM)

Item No.

0007AX

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00N-Software User Manual (SUM)

DI-IPSC-81443A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Software User Manual (SUM)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Architecture Document (SAD)

Item No.

0007AY

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00P-Software Architecture Document (SAD)

DI-SESS-82043

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Interface Requirements Specification (IRS)

Item No.

0007AZ

Not Separately Priced Quantity U/I Unit Price

A00Q-Interface Requirements Specification (IRS)

Interface Requirements Specification (IRS)

DI-IPSC-81434A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Human Engineering Systems Analysis Report (HESAR)

Item No.

0007BA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00R-Human Engineering Systems Analysis Report (HESAR)

DI-HFAC-80745C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Human Engineering Systems Analysis Report (HESAR)

Proposed Delivery

+ IAW1423 1 LO

Acceptance Test Plan

Item No.

0007BB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00S-Acceptance Test Plan

DI-QCIC-80553A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Systems Engineering Master Plan (SEMP)

Item No.

0007BC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00T-Systems Engineering Master Plan (SEMP)

DI-SESS-81785A

Associated Document(s) Line Item(s)

FD20601930143 0007

Systems Engineering Master Plan (SEMP)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Weight and Balance Report for Aircraft

Item No.

0007BD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00U-Weight and Balance Report for Aircraft

DI-MGMT-81501A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Information Assurance (IA) Design Review Information Package (DRIP)

Item No.

0007BE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00V-Information Assurance (IA) Design Review Information Package (DRIP)

DI-MGMT-81845

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Information Assurance (IA) Test Plan

Item No.

0007BF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00W-Information Assurance (IA) Test Plan

DI-MGMT-81844

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Information Assurance (IA) Test Plan

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Information Assurance (IA) Test Report

Item No.

0007BG

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00X-Information Assurance (IA) Test Report

DI-MGMT-81843

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Security Test Plan

Item No.

0007BH

Not Separately Priced Quantity U/I Unit Price

A00Y-Security Test Plan

Security Test Plan

DI-NDTI-81351

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

System Safety Hazard Analysis Report (SSHAR)

Item No.

0007BJ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00Z-System Safety Hazard Analysis Report (SSHAR)

DI-SAFT-80101C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

System Safety Hazard Analysis Report (SSHAR)

Proposed Delivery

+ IAW1423 1 LO

Programmatic Environmental Safety and Health Evaluation (PESHE) Plan

Item No.

0007BK

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A010-Programmatic Environmental Safety and Health Evaluation (PESHE) Plan

DI-ENVR-81840

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Reliability and Maintainability Predictions Report

Item No.

0007BL

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A011-Reliability and Maintainability Predictions Report

DI-SESS-81497A

Associated Document(s) Line Item(s)

FD20601930143 0007

Reliability and Maintainability Predictions Report

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Failure Modes, Effects, and Criticality Analysis Report

Item No.

0007BM

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A012-Failure Modes, Effects, and Criticality Analysis Report

DI-SESS-81495A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Status Report

Item No.

0007BN

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A013-Status Report

DI-MGMT-80368A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Human Engineering Design Approach Document - Maintainer (HEDAD-M)

Item No.

0007BP

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A014-Human Engineering Design Approach Document - Maintainer (HEDAD-M)

DI-HFAC-80747C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Human Engineering Design Approach Document - Maintainer (HEDAD-M)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Reserved

Item No.

0007BQ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A015-Reserved Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Test/Inspection Report

Item No.

0007BR

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A016-Test/Inspection Report

DI-NDTI-80809B

Test/Inspection Report

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Product Drawings/Models and Associated Lists

Item No.

0007BS

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A017-Product Drawings/Models and Associated Lists

DI-SESS-81000E/T

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Product Drawings/Models and Associated Lists

Proposed Delivery

+ IAW1423 1 LO

TMCR

Item No.

0007BT

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A018-TMCR

TM-08-01

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Logistics Product Data

Item No.

0007BU

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A019-Logistics Product Data

DI-SESS-81758A

Associated Document(s) Line Item(s)

FD20601930143 0007

Logistics Product Data

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Engineering Data for Provisioning

Item No.

0007BV

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01A-Engineering Data for Provisioning

DI-SESS-81874

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Program Protection Implementation Plan (PPIP)

Item No.

0007BW

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01B-Program Protection Implementation Plan (PPIP)

DI-SESS-81874

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Contractor's Risk Management Plan

Item No.

0007BX

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01C-Contractor's Risk Management Plan

DI-MGMT-81808

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Contractor's Risk Management Plan

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Integrated Program Management Report (IPMR)

Item No.

0007BY

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01D-Integrated Program Management Report (IPMR)

DI-MGMT-81861A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Reserved

Item No.

0007BZ

Not Separately Priced Quantity U/I Unit Price

A01E-Reserved

Reserved

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Presentation Materials

Item No.

0007CA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01F-Presentation Materials

DI-ADMN-81373

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Presentation Materials

Proposed Delivery

+ IAW1423 1 LO

Integrated Logistics Support Plan

Item No.

0007CB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01G-Integrated Logistics Support Plan

DI-ILSS-80095

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Item Unique Identification (IUID) Marking Activity, Validation and Verification

Item No.

0007CC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01H-Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

DI-MGMT-81804A

Associated Document(s) Line Item(s)

FD20601930143 0007

Item Unique Identification (IUID) Marking Activity, Validation and Verification

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Item Unique Identification (IUID) Marking Plan

Item No.

0007CD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01J-Item Unique Identification (IUID) Marking Plan

DI-MGMT-81803

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Counterfeit Prevention Plan

Item No.

0007CE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01K-Counterfeit Prevention Plan

DI-MISC-81832

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status of Government Furnished Equipment (GFE) Report

Item No.

0007CF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01L-Status of Government Furnished Equipment (GFE) Report

DI-MGMT-80269

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Status of Government Furnished Equipment (GFE) Report

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Contractor Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

Contractor Travel and Per Diem Travel IAW Attached PWS.

Travel shall be approved in advance by the PCO. Travel charges shall be IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20601930143 0008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

1 LO

Proposed Delivery

As Required

HH-60G Degraded Visual Environment System Familiarization

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

HH-60G Degraded Visual Environment System Familiarization

System Familiarization Associated Document(s) Line Item(s)

FD20601930143 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

1 LO *18 Months

Proposed Delivery

1 LO

Commencing 18 Months after receipt of contract for duration of five (5) months.

OPTION PERIOD I: The 12 month period immediately following the basic contract period. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.

HH-60G Degraded Visual Environment Production Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

31 KT

Prodcution Kits Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

HH-60G Degraded Visual Environment Production Kits

Required Delivery

31 KT TBD

Proposed Delivery

31 KT

Data

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

1002AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Conference Agenda

Type / Ship To Quantity (U/I) Req No / Pri Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Conference Minutes

Item No.

1002AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A002-Conference Minutes

DI-ADMN-81250B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status Report

Item No.

1002AC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

A013-Status Report

DI-MGMT-80368A

Status Report

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Presentation Materials

Item No.

1002AD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01F-Presentation Materials

DI-ADMN-81373

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

OPTION PERIOD II: The 12 month period immediately following the Option Period I. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.

HH-60G Degraded Visual Environment Production Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

31 KT

Prodcution Kits Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

31 KT TBD

Proposed Delivery

31 KT

Data

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A

Data

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Item No.

2002AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.