CDRLS_A019_A01A.pdf

PDF 560 KB Posted

Attached to
HH-60G Degraded Visual Environment System(DVES)
Solicitation number
FA8552-18-R-0005
Issued by

About this file

Contract Data Requirements List

View the file

Other files

File Type Posted
Section_L_09182018.pdf PDF
PaveHawk_DVES_SRD_1_1.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
DVES_PWS_Rev_2.pdf PDF
FA855218R00050005.pdf PDF
FA8552-18-R-0005_Round_2_Questions.pdf PDF
Section_M_Evaluation_Factors_for_Award_09042018.pdf PDF
FA8552-18-R-0005_Round_1_Questions.pdf PDF
Amended_CDRLs_3_Sep_2018.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.xlsx XLSX spreadsheet
Attachment_3_Cost_Models.xlsx XLSX spreadsheet
FA855218R00050004.pdf PDF
DVES_PWS_Rev_1.pdf PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors_09042018.pdf PDF
Attachment_1_Cross_Reference_Matrix.xlsx XLSX spreadsheet
FA855218R00050003.pdf PDF
FA855218R00050002.pdf PDF
TMCR_Attachment_4_TOLCVP_(DVES).pdf PDF
TMCR_Attachment_3_TOLCMP_(DVES).pdf PDF
TMCR_Attachment_2_Functionality_Matrix_(DVES).xlsx XLSX spreadsheet
TMCR_Attachment_1_AF_Business_Rules_(DVES).xlsx XLSX spreadsheet
DVES_Tech_Doc_Release_Agreement.pdf PDF
FA855218R00050001-Amendment.pdf PDF
CDRLS_A001_A00A.pdf PDF
Special_Packaging_Instructions.pdf PDF
Signed_19_30143_QASP.PDF PDF
DVES_Tech_Doc_Release_Agreement.pdf PDF
PaveHawk_DVES_SRD_Final.pdf PDF
Attachment_3_Cost_Model_Spreadsheet.xlsx XLSX spreadsheet
CDRLS_A00M_A00X.pdf PDF
FA855218R0005-Final.pdf PDF
DVES_PWS_Final_9_Jul.pdf PDF
Attachment_1_Cross_Reference_Matrix.pdf PDF
Attachment__4_Total_Resources_Volume.XLSX XLSX spreadsheet
FORM_158_Packaging_Requirements.pdf PDF
Section_M_Evaluation_Factors_For_Award.pdf PDF
CDRLS_A01B_A01L.pdf PDF
DVES_Government_Technical_Data_List.pdf PDF
CDRLS_A00B_A00L.pdf PDF
Attachment_2_Sustainment_Technical_Acceptability_Matrix.pdf PDF
CDRL_A018_TMCR.PDF PDF
Section_L_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
CDRLS_A00Y_A017.pdf PDF
DD254_Solicitation.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY

SESS

D. SYSTEM/ITEM

Degraded Visual Environment System

E. CONTRACT/PR NO.

FD2060-9-30143

F. CONTRACTOR

1. DATA ITEM NO.

A019

2. TITLE OF DATA ITEM

LOGISTICS PRODUCT DATA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81758A/T

5. CONTRACT REFERENCE

PWS Para 3.10.3

6. REQUIRING OFFICE

406 SCMS/GULABB

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

IAW AFMC Form 718

14. DISTRIBUTION

b. COPIES

8. APP CODE

See Block 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS.

A. The Prime Provisioning Activity (PPA) is identified in Block 14.

B. Specific summaries to be delivered on this contract are:

(1)__X_Provisioning Parts List (PPL) Top Down Sequence (2)____Short Form Provisioning Parts List (SFPPL) (3)____Common and Bulk Items List (CBIL) (4)__X_Design Change Notices (DCN) (5)____Statement of Prior Submission (SPS) Hard Copy Only.

(6)__X__Long Lead Items List (LLIL) Select one of the following:

______LLIL-Interim Release (Items interim released by the contractor when interim release is authorized by the contract.

______LLIL-Recommended (Items recommended as LLIL).

C. Attachment: LMI Data Product Worksheet for Logistics Product Data.

D. Block 7: Acceptance/Rejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

E. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

F. Block 9: Distribution statement C applies.

G. Blocks 10, 11, 12, & 13:

(1) PPL, SFPPL, LLIL, CBIL: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). See Paragraph 3.1 of the IPPS.

(2) DCN(s): See Paragraph 10 of the IPPS.

(3) SPS: When the IPPS is provided with the solicitation, an offeror’s SPS shall be as outlined by the solicitation. When the IPPS is furnished after award, the contractor shall furnish a SPS within thirty (30) days after receipt of the IPPS. See Paragraph 7 of the IPPS.

H. Logistics Product Data transmittal document will reflect, as a minimum, PCCN, SCC, PCC, Contract Number, Type Logistics Product Data, and Line Item Count.

I. Data element definitions will be in accordance with GEIA-HB-0007A and/or other data provided at the PGC by the PPA.

J. In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

406SCMS/GULABB

1 0 235 Byron St.

Suite 19A

Robins AFB GA

31098-1670

15. TOTAL 1 0

G. PREPARED BY

Dwayne White

H. DATE

10/06/2017

I. APPROVED BY

J. DATE

3 July 2018

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY

SESS

D. SYSTEM/ITEM

Degraded Visual Environment System

E. CONTRACT/PR NO.

FD2060-19-30143

F. CONTRACTOR

1. DATA ITEM NO.

A01A

2. TITLE OF DATA ITEM

Engineering Data for Provisioning (EDFP)

3. SUBTITLE

TBD

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

PWS Para 3.10.3

6. REQUIRING OFFICE

406 SCMS/GULABB

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

IAW AFMC Form 718

14. DISTRIBUTION

b. COPIES

8. APP CODE

See Block 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

A. The Prime Provisioning Activity (PPA) is identified in Block 14 with an asterisk (*).

B. For PPLs/SFPPLs, one set of technical data (hard copy) will be provided to the PPA with the Logistics Product Data in PLISN sequence, annotated with PLISN, PCCN, SCC, PCC, CAGE and Part Number, with accompanying transmittal correspondence.

C. For PPLs/SFPPLs, one set of technical data (electronic or hardcopy) will be provided to DLIS (** Block 14), annotated with PLISN, PCCN, SCC, PCC, CAGE, and P/N, with accompanying transmittal correspondence (with a courtesy copy provided to the PPA) D. All transmittal correspondence will cite the applicable Contract Number, PCCN, and SCC. DLIS transmittal correspondence should cite 406SCMS/GULAB_ as the PPA and provide a courtesy copy to the PPA.

E. Block 7: Acceptance/Rejection of the technical data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

F. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

G. Block 9: Distribution statement __C__ applies.

H. Blocks 10, 12, & 13: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). If complete sets are not provided, identify missing technical data and provide it 30 days prior to the Spares Provisioning Conference or as directed by the PPA. This applies to all non stock-listed items regardless of the type Logistics Product Data and SMR Code (source, maintenance, recoverability). Technical data is required for each support item appearing on all types of Logistics Product Data, first appearance only on each Logistics Product Data submission, unless directed otherwise by the PPA.

I. The prime contractor and all sub-vendors shall provide required data, translated to the English language, for the express purpose of identifying and cataloging items with a full description regardless of limited rights claims. Letters of refusal must clearly state reason(s) technical data is not being furnished to satisfy the data requirements levied and recommend alternate methods of furnishing required technical data to the PPA.

J. For DCNs, LLTILs, and CBILs, both sets of technical data will be provided to the PPA.

K. The contractor shall not assess developmental costs to the Government to furnish this technical data as SDFP, only cost necessary for reproduction and assemblage.

L. In the event SDFP submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

IF ROUTINE MAIL:

406SCMS/GULABB

*1

Suite 19A

Robins AFB, GA

31098-1670

IF PRVT CARRIER:

638 Supply Chain *1 Management Group

406SCMS/GULAB_

Suite 19A Robins AFB, GA 31098-1670

IF HARD COPY:

DLIS-KPD PSO **1

74 Washington Ave., N, Suite 7 Battle Creek, MI 49037-3084

IF ELECTRONIC:

DLISPSO@dla.mil 1

15. TOTAL 2

G. PREPARED BY

Dwayne White

H. DATE

10/06/2017

I. APPROVED BY

J. DATE

3 July 2018

A019 - LPD
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C
C. CATEGORY
SESS
E. CONTRACT/PR NO.
FD2060-9-30143
A019
DI-SESS-81758A/T
See Block 16
See Block 16
As Required
See Block 16
N/A
Draft
G. PREPARED BY
A019 - LPD (Cont)(1)
A01A - EDFP
CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C
C. CATEGORY
SESS
E. CONTRACT/PR NO.
FD2060-19-30143
A01A
DI-SESS-81874
See Block 16
See Block 16
As Required
See Block 16
N/A
Draft
G. PREPARED BY

A01A - EDFP (Cont)

2018-07-03T10:40:32-0400
WITTER.GARY.L.1062900020
2018-07-03T10:40:58-0400
WITTER.GARY.L.1062900020

File details come from the government source that posted it.