PD_Revision_01_4June2010.pdf
PDF 7 KB Posted
- Attached to
- Universal Hydraulic Test Stands Federal contract opportunity
- Solicitation number
- FA8533-10-R-20138
About this file
Revision 01 to Purchase Description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q As 22 June.pdf | ||
| FA853310R20138______0003.pdf | ||
| Q As 8 June.pdf | ||
| FA853310R20138______0002.pdf | ||
| Proposal_Requirements_and_Basis_for_Award_June_2010.pdf | ||
| FA853310R20138______0001.pdf | ||
| EDL_Electric.pdf | ||
| ELINSC001-C004.pdf | ||
| ELINSB001-B004.pdf | ||
| ELINSD001-D005.pdf | ||
| Attachment2.doc | DOC document | |
| Attachment5.doc | DOC document | |
| ELINF001.pdf | ||
| FA853310R20138_17may.pdf | ||
| Attachment4.doc | DOC document | |
| EDL_Diesel.pdf | ||
| ELINSG001-G002.pdf | ||
| Attachment1.doc | DOC document | |
| Attachment6.doc | DOC document | |
| ELINSE001-E002.pdf | ||
| FinalUHTSSOW.pdf | ||
| PD07WRGBZOENF10.pdf | ||
| Attachment3.doc | DOC document | |
| ELINSA001-A003.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION PD07WRGBZOENF10
Revision 01, dated 4 June 2010
PD07WRGBZOENF10, Universal Hydraulic Test Stand (UHTS) - Dual system, trailer-mounted dated 29 October 2009 is revised to include the following updated paragraph:
Remove existing paragraph 3.11.11.6 Couplings, and replace it with the following:
3.11.11.6 Couplings. Couplings shall be provided with the UHTS first production (first article) units only for use during testing and equipped as specified. All couplings shall be Aeroquip 145/155 Series Soft Sealing couplings or equivalent and be approved for use at the rated pressures and shall not leak or discharge any fluid (except for normal surface wetting) when disconnected. A sufficient quantity of hose end and bulk head style couplings for use on the runaround blocks, as well as all necessary adapters, shall be supplied with each UHTS first production unit to configure the UHTS with a -12 supply (3000 psi working pressure minimum) and -16 return (1000 psi working pressure minimum) as well as a -16 supply (3000 psi working pressure minimum) and -24 return (1000 psi working pressure minimum). Plug assemblies with retention chain and cap assemblies with retention chain shall be provided for all couplings.
File details come from the government source that posted it. Updated .