RFP_Attch_4_Past_Performance_Questionnaire.pdf

PDF 38 KB Posted

Attached to
Aircraft Launching, Landing, and Ground Handling Equipment
Solicitation number
FA8526-12-R-30668
Issued by

About this file

Past Performance Questionnaire

View the file

Other files

File Type Posted
FA852612R30668______0004.pdf PDF
C-17_Lift_Trailer_Questions_and_Answers.pdf PDF
This_First_Article_process.pdf PDF
RFP_Atch_3_-_Transmittal_Ltr.pdf PDF
Form_158.pdf PDF
35d3-3-79-1_Insp_and_PM.pdf PDF
5552A_1a1___2013C0001-R.pdf PDF
8544A_1a1__2012C0001-R.pdf PDF
35d3-3-79-1_General_Info.pdf PDF
35d3-3-79-1_Test.pdf PDF
35d3-3-79-1_Use_and_Shipping_Prep.pdf PDF
35d3-3-79-1_Operation.pdf PDF
Form1423_CDRL.pdf PDF
Form1653_1230668_Consolidated_(2).pdf PDF
1052_88277_NULL_NULL_0001_NULL_.pdf PDF
Current_EDL_1730-01-560-2167BE_24_Jan_13.pdf PDF
5509A_1a1___2013C0001-R.pdf PDF
8579G.pdf PDF
RFP_Atch_2_-_Client_Authorization.pdf PDF
8923_08118_WH_F.pdf PDF
RFP_Attch_1_FACTS.pdf PDF
FA852612R30668_Amend_0003_RFP.pdf PDF
FA852612R30668______0002.pdf PDF
FA852612R30668______0001.pdf PDF
35d3-3-79-1 Test.pdf PDF
Current EDL 1730-01-560-2167BE.pdf PDF
35d3-3-79-1 Insp and PM.pdf PDF
35d3-3-79-1 Use and Shipping Prep.pdf PDF
RFP Atch 2 - Client Authorization.pdf PDF
FA852612R30668.pdf PDF
Form 158.pdf PDF
35d3-3-79-1 General Info.pdf PDF
Form1423 CDRL.pdf PDF
RFP Attch 4 Past Performance Questionnaire —
Form1653.pdf PDF
RFP Attch 1 FACTS UPDATED 11 Jul 2012.pdf PDF
RFP Atch 3 - Transmittal Ltr.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(WHEN COMPLETED) SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104. FOR OFFICIAL USE ONLY

ATTACHMENT 4

PRESENT/PAST PERFORMANCE QUESTIONNAIRE

RFP FA8526-12-R-30668

PLEASE PROVIDE THE FOLLOWING INFORMATION ABOUT YOURSELF:

Name/Signature and Role Relative to Contract (e.g. Buyer, Program Manager):_________________________________________________________________________ Agency or Business: _______________________________________________________________________________________________________________________ Address: _________________________________________________________________________________________________________________________________ Telephone No. ________________________________ FAX No. _____________________________________

Return your completed questionnaire either electronically, by fax or by mail. See Section L of the solicitation for appropriate email address, mailing address, or fax number.

NOTICE: WHEN COMPLETED, THIS QUESTIONNAIRE WILL BE CONSIDERED SENSITIVE AND SHALL NOT BE RELEASED TO THE OFFEROR.

Part I. SPECIFIC PROGRAM INFORMATION.

Contractor/Business: _____________________________________________ CAGE Code: __________

Program Title and Brief Description: _____________________________________________________________________________________________________________

Role in the Program/Work Performed As: _____Prime _____Subcontractor _____Vendor/Supplier

Contract Number: ________________________________ Number of Years?: Basic:________ Option: _________

Contract Type(s): List all applicable contract types, i.e. Firm-Fixed-Price, Time & Materials, Cost, etc._________________________________________________________________________________________________________________________________________

PART II. GENERAL PROGRAM INFORMATION.

Period of Performance:

1. Original Schedule (assuming all options exercised): Beginning Date _________ through ____________

2. Current Schedule (assuming all options exercised): Beginning Date _________ through ____________

3. Reason for difference (if applicable) ____________________________________________________________________________________________________

Contract Dollar Value:

1. Original MAX Contract $ Value (assuming all options exercised):_____________________________________________________________________________

2. Current MAX $ Value (assuming all options exercised): _____________________________________________________________________________________

3. Primary Causes of Changes: ___________________________________________________________________________________________________________

NOTE: In Part III., should your response be other than “satisfactory,” please provide supporting documentation in “Additional Remarks” on page 4 of 5.

PART III. PERFORMANCE ASSESSMENTS.

Please check the appropriate rating for each of the following questions:

N/A=Not Applicable U=Unsatisfactory M=Marginal S=Satisfactory V=Very Good E=Exceptional

N/A U M S V E

1. Extent to which Company’s products and/or services met the specification /performance requirements:

2. Configuration Management (first product delivered same as last):

3. Machining multiple critical features to tight tolerances such as +0.0003/-.00025 inch

4. Welding Structural and/or stainless steel pieces in thickness up to 2.00 inch

5. Assemble and test end item capable of operating on 208V-440V, 50-400 HZ, 3 phase power and/or 240V-120V, 50-60 HZ, 1 phase power

6. Assemble and test end item incorporating 3000 psig (or greater) rated electrically powered servo-hydraulic system

7. Assemble and test end item incorporating purpose built (non-Commercial-off-the-shelf) circuit cards) in the item control system

8. Testing required purpose built or specially adapted test tooling to apply externally imposed test loads of 50,000 lbs and less in varied load conditions and directions

9. Testing required handling and braking tests of towed vehicle under towing conditions at speeds of 20 MPH or greater

10. Quality of Completed Product:

11. Overall management of subcontracting efforts (if applicable):

12. Quality of Technical Manuals or Commercial Manuals (if applicable):

13. Customer’s Satisfaction with warranty response times and corrective actions (if applicable):

14. Adequate Number of Dedicated Resources For Your Program:

15. Timely recognition and notification of administrative, engineering, production, problems affecting the program:

16. Company performed independently without significant customer direction/oversight?

17. Monitoring of Program Schedules and Critical Milestones:

18. Completed Work on Time:

19. Extent to which small businesses, veteran-owned small businesses, small disadvantaged businesses and other socio-economic business sectors were utilized in the performance of the contract

20. Has action been initiated to cancel or terminate the contract for default? If yes, explain.

21. Have there been any disputes/claims relative to the contract? If yes, explain.

22. Describe the contractor’s or company’s strong and/or weak points identified as a result of technical performance and any technical performance risk identified during the life of the contract. __________________________________________________________________________________________________________________________________

23. If given a choice, would you award to this contractor again? If not, please explain.

24. Do you feel you “got what you paid for” ? Please explain. ___________________________________________________________________________________________

25. Additional Remarks.

RFP FA8526-12-R-30668

PRESENT/PAST PERFORMANCE QUESTIONNAIRE

ASSESSMENT RATING SYSTEM

E EXCEPTIONAL: Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD: Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY: Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL: Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE: Did not apply to this acquisition; or, questionnaire respondent has no knowledge of, and/or did not observe, the contractor’s performance in this area.

NOTICE TO QUESTIONNAIRE RESPONDENTS: Please do not include this page when returning the completed questionnaire.

Part I. SPECIFIC PROGRAM INFORMATION.
ASSESSMENT RATING SYSTEM

File details come from the government source that posted it. Updated .