Engineer_Change_Order_-_201427817_Loop_Clamp_VICD.pdf
PDF 545 KB Posted
- Attached to
- C-5 Lavatory
- Solicitation number
- FA8525-17-R-0005
About this file
Engineering Change Order - FA8525-17-R-0005
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ENGINEERING ORDER NO.
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
SYMBOL
PHONE
DATE: PAGE OF
(S)
PAGES
4. DWG NO.
14. CORROSION CONT. MON.
15. NDI
16.
17. DWG CHANGED BY
18. CHANGE CHECKED BY
19. EO/DWG RELEASED BY
DWG SIZE DWG SHEET LATEST DWG REV LTR
2. DWG TITLE
20. DESCRIPTION OF CHANGES/REMARKS
AF IMT 3925, 20030819, V1
12. EO PREPARED/REQUESTED BY
13. ENGINEERING APPROVAL
11. DOCUMENTS AFFECTED (TO/TCTO/SPEC/Other)
OTHER COMMENTS
5. NEXT ASSY
ENGINEERING ORDER
8. TYPE OF ENGINEERING ORDER 9. REASONS FOR CHANGE
ADVANCE CHANGE ERROR CORRECTION
DEVIATION AUTHORIZED DESIGN CHANGE
CHANGE NOTICE DRAWING CLARIFICATION
INFORMATION UPDATED DRAWING
6. USED ON
10. DISPOSITION OF SPARES
REWORK
MODIFY
SCRAP
REPLACE
3. DWG CAGE CODE
7. OPR CAGE CODE
DATE
SYMBOL
PHONE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
REPLACES AF FORM 2600, 19940701, WHICH IS OBSOLETE
1. ENGINEERING ORDER NO.
DATE: PAGE OF PAGES
4. DWG NO.2. DWG TITLE
(Continuation Sheet)
5. DESCRIPTION OF CHANGES/REMARKS
AF IMT 3926, 20030819 (V1) REPLACES AF FORM 2601, 19940701, WHICH IS OBSOLETE
ENGINEERING ORDER
3. DWG CAGE CODE
| WR7_13B_DATE: 18-May-2017 00:00 |
| 3 DWG CAGE CODE: 98752 |
| 5 DESCRIPTION OF CHANGESREMARKS: 1. In Note 3, change clamp material: |
WAS: CLAMP MATERIAL: ALUMINUM ALLOY, 2024-T42
IS: CLAMP MATERIAL: ALUMINUM ALLOY, 2024-T42 OR 2024-T4
2. In Note 3, delete weight requirement:
DELETE: WEIGHT LBS/IN: .101
3. Zone C5, change hole location dimension:
WAS: .295
IS: .295 MAX
4. Zone D4, change clamp width dimension:
WAS: .600
IS: F
5. In dimensional table, Zone C2, add dimension F:
F -01 .600 -03 .600 -05 .600 -07 .600 -11 .600 -13 .600 -15 .640 -17 .640 -21 .600 -23 .600
6. In Suggested Sources table, Zone B7, change vendor name and address for all part nos.:
WAS: TRANSDIGM INC.
5000 TRIGGS ST.
LOS ANGELES, CA 90022-4833
IS: TRANSDIGM INC.
ADELWIGGINS GROUP
5000 TRIGGS ST.
LOS ANGELES, CA 90022-4833
| WR7_18A_SYMBOL: |
| WR7_2_4_DWG_NO: 201427817 |
| Page: 2 |
| WR7_17B_DATE: |
| WR7_15A_SYMBOL: |
| WR7_15B_DATE: |
| WR7_10_DISPOSITION_OF_SPARE: |
| WR7_13A_SYMBOL: WLSEAB |
| WR7_17_DWG_CHANGED_BY: |
| WR7_7C_LATEST_DWG_TEV_LTR: - |
| WR7_12B_DATE: 18-May-2017 00:00 |
| WR7_18_CHANGE_CHECKED_BY: |
| WR7_8_TYPE_OF_ENG_ORDER: CHANGE NOTICE |
| WR7_6_USED_0N: MA0001A |
| WR7_19_EO_DWG_RELEASED_BY: |
| WR7_12_EO_PREPARED_REQ_BY: Carl Eddy |
| 1 ENGINEERING ORDER NO: |
| WR7_7A_DWG_SIZE: D |
| WR7_15_NDI: |
| WR7_1_ENGINEERING_ORDER_NO: |
| 2 DWG TITLE: Clamp, Loop |
| WR7_9_REASONS_FOR_CHANGE: UPDATED DRAWING |
| WR7_13C_PHONE: 468-6849 |
| WR7_13_ENG_APPROVAL: Ben Puckett |
| WR7_5_NEXT_ASSY: 201427105 |
| WR7_12A_SYMBOL: WLSEAB |
| WR7_17A_SYMBOL: |
| 4 DWG NO: 201427817 |
| WR7_19A_SYMBOL: |
| WR7_1A_DATE: 18-May-2017 00:00 |
| WR7_16A_SYMBOL: AFLCMC/WLS |
| WR7_16_OTHER: Russell E. Alford |
| WR7_14A_SYMBOL: |
| WR7_14_CORROSION_CONT_MON: |
| WR7_16B_DATE: 24-May-2017 00:00 |
| WR7_20_DESC_OF_CHANG_REMRKS: See continuation sheet. |
| WR7_18B_DATE: |
| WR7_14B_DATE: |
| WR7_19B_DATE: |
| WR7_7_OPR_CAGE_CODE: 98752 |
| WR7_2_3_DWG_CAGE_CODE: 98752 |
| WR7_11_DOC_AFFECTED: |
| WR7_10B_OTHER_COMMENTS: Disposition of spares: use as-is. |
| WR7_2_DWG_TITLE: Clamp, Loop |
| WR7_7B_DWG_SHEET: 1 |
| DATE: 20170517 |
| Of: 2 |
| WR7_12C_PHONE: 468-6847 |
File details come from the government source that posted it. Updated .