C-5_Product_Discription_(Revised).pdf
PDF 200 KB Posted
- Attached to
- C-5 Lavatory Federal contract opportunity
- Solicitation number
- FA8525-17-R-0005
About this file
C-5 Product Description
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFLCMC/WLS (Galaxy Division)
Air Force Life Cycle Management Center
Robins AFB, GA
Basic Date: 11/17/16, revised 05/24/17
PRODUCT DESCRIPTION (PD)
C-5M Mission Support Equipment – Lavatory Time Compliance
Technical Order (TCTO) Kit Build
Table of Contents
1.0 Product Description ………………………………………………………….……………...3
2.0 Applicable Documents ……………………………………………………….……………...3
2.1 Non Government Publications ………………………………………………………….…..3
3.0 Requirements………………………………………………………………………………...3
3.1 Design………………………………………
3.2 Kit Audits and Inspections………….……………………………………………………….4
3.3 Materials………………………………………………………………………….…………..4
3.4 Kit Configurations and Components……………………………………………………
3.5 Deliverables………………………………………………………………………………
3.6 Program and Business Management……..…………………………………………..…….5
3.7 Preservation and Packaging...………………………………………………...…………….6
3.8 Joint Meetings………………………………………………………………………………..6
3.9 Quality Assurance..…………………………………………………………………………..6
3.10 Schedule (Delivery)..………………………………………………………………………..7
4.0 Verification..………………………………………………………………………………….7
5.0 Government Furnished Property (Tooling) …..………………………………………….10
Appendix A: Conformance and Examination Components List…………………………
Appendix B: C-5 Lavatory Kit Components List ………………………………………….….13
Appendix C: Lavatory Retrofit Kit Components List ………………………………………..13
Appendix D: CDRL Requirements List..……………………………………………………...14
Appendix E: C-5M Lavatory Initial Spares List……………………………………………...15
Appendix F: Government-Furnished Property for Manufacture of Panels and Shrouds….18
PRODUCT DESCRIPTION
1.0 This Product Description (PD) outlines the requirements to order, assemble and deliver up to 50 C-5M Lavatory TCTO Kits and supporting product deliverables for the C-5M Lavatory TCTO Kit Build for C-5M aircraft. The C-5 Program Office has developed a Technical Data Package (TDP) for such product. The contractor shall follow the TDP to order, assemble and deliver Lavatory TCTO Kits. The TDP provides the build-to-print part specifications and identifies commercial suppliers from which the contractor will acquire commercial parts.
This PD also outlines the requirements to order, assemble and deliver one Lavatory Retrofit Components Kit and supporting product deliverables that are compatible for integration into the C-5M aircraft.
The product shall comply with all applicable C-5M inspections as stated in Paragraph 4 of this document prior to final acceptance.
2.0 APPLICABLE DOCUMENTS
The documents listed herein are elements of this PD. Compliance is required in order to support product conformance prior to final delivery.
2.1 Non-Government Publications
The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the contract.
AMERICAN SOCIETY FOR QUALITY (ASQ)
ANSI/ISO/ASQ 9001:2008 Quality Management Systems Requirements
Copies of these documents are available from www.asq.org or American Society for Quality, P.O. Box 3005, Milwaukee, WI 53201-3005.
3.0 REQUIREMENTS
3.1 Design
The C-5M Lavatory TCTO Kit includes Commercial Off-The-Shelf (COTS) components, C-5M unique components and miscellaneous commercial hardware installed in the Air Crew Lavatory Area, and the Troop Compartment Area. The Government previously designed a C-5M Lavatory TCTO installation kit and tested its performance via the Kit Proof and Validation/Verification processes. The outcome of this effort was a TDP that is the governing document for acquiring C- 5M Lavatory TCTO Kits.
3.2 Kit Audits and Inspections
The first and second kit scheduled for delivery shall be subjected to Kit Audits, Inspections and applicable Conformance and Examination Inspections in accordance with paragraph 4.2, 4.3 and 4.4 of this document. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A007 DI-SESS-81921 Quality Audit Site Visit Report), (CDRL A008 DI-SESS-81923 Quality Audit Finding and Response Record)
3.3 Materials
The materials of component construction are the responsibility of the contractor in accordance with the TDP. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP))
3.3.1. Certificates of Conformance. The prime contractor shall provide certificates of conformance on the materials of component construction for all items listed in Appendix A. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A008 DI-SESS-81923 Quality Audit Finding and Response Record), (CDRL A009 DI-QCIC-81187, Quality Assessment Report)
3.4 Kit Configurations and Components
There are two separate and distinct kit configurations. The components within each configuration are referenced in the Top Level Drawing (See Drawing Number: 201427863). The two separate and distinct kit configurations referenced in Top Level Drawing Number 201427863 are listed as follows:
Part Number: National Stock Number: C-5 Aircraft Configuration
201427863-10 1680K0104306AUC C-5 “A and B” Model Aircraft
201427863-30 1680K0104306BUC C-5 “C” Model Aircraft
*Note: There are 15 separate and distinct sub-kits listed under each of the two separate and distinct kit configurations. The components that comprise each sub-kit are listed in the lower indenture drawings. Kit P/N 201427863-50 is referenced on the top level drawing, but is not applicable to this effort.
3.5 Deliverables
3.5.1 The contractor shall order, assemble and deliver up to 50 C-5M Lavatory TCTO Kits with all components in accordance with the required TDP specifications. All components shall be packaged by sub-kit in accordance with the required TDP specifications. (See Appendix B) (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A009 DI-QCIC-81187, Quality Assessment Report)
3.5.2 The contractor shall deliver one Lavatory Retrofit Components Kit with all components delivered in accordance with the required TDP specifications. (See Appendix C) (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule)
3.5.3 The contractor shall deliver one set of C-5M Lavatory Initial Spares with all components delivered in accordance with the required TDP specifications. (See Appendix E) (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule)
3.6 Program and Business Management
3.6.1 Program Management. The contractor shall develop, and deliver to the Government an Integrated Master Schedule (IMS) as part of the Integrated Program Management Report for product delivery within 60 days of contract award and provide updated IMSs as required. (CDRL A001 DI- MGMT-80368A/T Status Report), (CDRL A002 DI-MGMT-81861A/T Integrated Program Management Report (IPMR))
3.6.2 A Post-Contract Award Kickoff Meeting shall be held within 15 days after contract award at the prime contractor’s facility. The contractor shall address cost planning, project schedule, planned development activities, planned Kit Audit Inspections and risk management at the contract kick-off meeting. Agenda and Meeting minutes shall be created and delivered. (CDRL A005 DI-ADMN-81249, Conference Agenda), (CDRL A006 DI-ADMN-81505/T Report Record of Meeting Minutes)
3.6.3 Semi-annual Program Management Reviews shall be conducted and/or supported. The first meeting shall be scheduled 180 days following contract award; subsequent reviews will be held semi-annually at the prime contractor’s facility or via teleconference at the discretion of the government. (CDRL A002 DI-MGMT-81861A/T Integrated Program Management Report (IPMR)), (CDRL A005 DI-ADMN-81249, Conference Agenda), (CDRL A006 DI-ADMN- 81505/T Report Record of Meeting Minutes)
3.7 Preservation and Packaging
3.7.1 Preservation and Packaging. Preservation and Packaging of the kits shall be in accordance with the latest revision of military specification MIL-STD-2073, Appendix D, for packaging of kits. The use of new or commercially available packaging materials or products is encouraged and recommended provided they are equal to or better than similar approved materials or products without increasing the overall cost to the government. (See AFMC Form 158 for further instructions)
No preservative compound or oil shall be applied if application would be harmful to the items.
Physical protection such as cushioning, wraps and containers for all items in the Kit shall be applied to minimize the possibility of damage to the kit contents. Wiring Harnesses shall be segregated in the kit with MIL-STD-130N labeling on the outside of each package. Marking requirements of the kit shall be in accordance with MIL-STD-2073.
The kits shall be marked in accordance with the two separate and distinct kit configurations referenced in the Top Level Drawing Number 201427863 as follows:
Part Number: National Stock Number: C-5 Aircraft Configuration
201427863-10 1680K0104306AUC C-5 “A and B” Model Aircraft
201427863-30 1680K0104306BUC C-5 “C” Model Aircraft
*Note: There are 15 separate and distinct sub-kits listed under each of the two separate and distinct kit configurations. The components that comprise each sub-kit are listed in the lower indenture drawings. Each sub-kit and sub-indentured components will be marked in accordance with the TDP. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP))
3.8 Joint Meetings
The contractor shall conduct quarterly joint reviews during the first period of performance, and semi-annual joint reviews during subsequent periods of performance that identify and resolve product requirements at risk. The reviews may be held at the prime contractor’s facility or via teleconference.
The contractor shall present status on project schedule and performance. Agenda and Meeting minutes shall be created and delivered by the contractor. (CDRL A001 DI-MGMT-80368A/T Status Report), (CDRL A005 DI-ADMN-81249, Conference Agenda), (CDRL A006 DI-ADMN-81505/T Report Record of Meeting Minutes)
3.9 Quality Assurance
The contractor shall develop, implement, and maintain a Quality Assurance Program Plan. (See paragraphs 2.3 and 4.9) (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP))
3.10 Schedule (Delivery)
The contractor shall develop, implement, and maintain a Delivery Schedule that fulfills the Government’s delivery requirements. (CDRL A001 DI-MGMT-80368A/T Status Report), (CDRL A002 DI-MGMT-81861A/T Integrated Program Management Report (IPMR))
3.10.1 Delivery Address.
SW3119
RIC: SDD
DEF DIST DEPOT WARNER ROBINS
455 BYRON STREET BLDG 376
ROBINS AFB, GA 31098-1887
Mark for: Bldg 368A, Kitting Warehouse
(CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP))
3.10.2 Status Report
The contractor shall develop, implement, update and deliver a C-5M Lavatory Status Report.
(CDRL A001 DI-MGMT-80368A/T Status Report)
4. VERIFICATION
4.1 Classification of Inspections
The inspection requirements specified herein are classified as follows:
A. Kit Audit Inspections (see paragraph 4.2)
B. Conformance and Examination Inspection (see paragraph 4.3 and Appendix A)
4.2 Kit Audit Inspections
The government shall perform an Audit Inspection of the first and second kit scheduled for delivery to the government (See paragraph 3.2). The contractor will provide the required indoor facility, floor space, tables and chairs needed to perform the audit inspections. These inspections will occur concurrently during the kit build-up period of the first and second kits scheduled for delivery to the government at following intervals:
A. 50% kit build complete B. 75% kit build complete C. 100% kit build complete
This inspection shall include the examination of paragraph 4.5 indicated in Table I (Examination Schedule) and the Kit Quality Provision of paragraph 4.6. Nonconformance to any specified requirement, the failure of any audit, or the presence of one or more defects shall be cause for disapproval of the product. The government will perform the inspection at the Prime Contractor facility.
(CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS- 81925 Quality Audit Site Visit Schedule), (CDRL A008 DI-SESS-81923 Quality Audit Finding and Response Record)
4.3 Conformance and Examination Inspection
The Government shall perform conformance inspections. The conformance inspections shall be performed concurrently on the specific items identified in Appendix A, and will occur during the kit build-up of the first and second kit to be delivered to the Government. The conformance inspections shall include the examination of the material manufacture Certificates of Conformance as indicated in paragraph 3.3.1. Nonconformance to any specified requirement, the failure of any audit, or the presence of one or more defects shall be cause for disapproval of the product. The government has the option to conduct this inspection at the Prime Contractor facility.
The contractor shall examine all components to verify compliance with the TDP requirements. A Contractor-generated, Government-approved checklist that identifies each relevant requirement not verified by an audit or analysis and the inspection results shall be used. Particular attention shall be given to materials, workmanship, dimensions, surface finishes, protective coatings and sealants and their application, welding, fastening, and markings. Certifications and analyses shall be provided in accordance with Table I. Each production shall be inspected to a Government-approved version of the checklist. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A007 DI-SESS-81921 Quality Audit Site Visit Report), (CDRL A008 DI-SESS- 81923 Quality Audit Finding and Response Record), and (CDRL A009 DI-QCIC-81187, Quality Assessment Report)
4.4 Responsibility for Inspection
The contractor is responsible for the inspection requirements (examinations and audits) as specified herein. The contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein. The Government reserves the right to verify any of the inspections set forth in this PD where such verifications are deemed necessary to ensure they conform to the TDP requirements. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A008 DI-SESS-81923 Quality Audit Finding and Response Record), (CDRL A009 DI-QCIC-81187, Quality Assessment Report)
4.5 Responsibility of Compliance
All Kit items shall meet all requirements of paragraphs 3 and 4. The inspection set forth in this PD shall become a part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in this PD shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling Inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of defective material, either indicated or actual, nor does it commit the Government to accept defective material. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule), (CDRL A007 DI-SESS-81921 Quality Audit Site Visit Report), (CDRL A008 DI-SESS-81923 Quality Audit Finding and Response Record), (CDRL A009 DI- QCIC-81187, Quality Assessment Report)
TABLE I. Examination Schedule
Exam no. Requirement Paragraph Verification Method
E1 4.1 Kit Audit Inspections TDP Conformance/Material Certification
E2 4.2 Conformance and Examination Inspection. TDP Conformance/Material Certification
4.6 Kit Quality Provision
a. The contractor shall comply with all applicable TDP requirements for the kit components being supplied.
b. The contractor shall flow down instructions for obtaining, handling and supplying Original Equipment Manufacturer (OEM) certified parts into all contractual agreements entered into with its vendors.
c. The contractor shall implement an inspection system, which will include inspection of all parts upon receipt to ensure conformance with requirements and to ensure that they are not damaged. All damaged items shall be replaced prior to final delivery to the Government.
d. The contractor shall maintain a system or process that will ensure traceability of all parts, through an unbroken supply chain, to the manufacturer.
e. The contractor's inspection system and procedure for ensuring parts traceability shall be available for review by the government at the request of the contracting officer.
f. The contractor shall furnish only those parts that are known to be acceptable to the government, i.e. sole source parts, approved source parts, acceptable source parts, as reflected in the government's TDP.
g. Unless otherwise approved in advance by the Government Contracting Officer, the contractor shall supply only new and unused parts that are not government surplus parts.
h. This kit contains components that must conform to a Source Control Drawing (SCD). By submitting an offer, the offeror agrees to provide source-controlled components from only approved sources identified on the applicable SCD.
(CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan (QAPP)), (CDRL A004 DI-SESS-81925 Quality Audit Site Visit Schedule)
5.0 GOVERNMENT FURNISHED PROPERTY (TOOLING)
Government furnished property in “as-is” condition will be provided in accordance with the contract/order, Appendix F, Government Furnished Property (Tooling) for the Manufacture of Panels and Shrouds. The Contractor will be given the opportunity to inspect such property prior to the property being provided. The Government makes no warranty with respect to the serviceability and/or suitability of the property for contract performance. Any repairs, replacement, and/or refurbishment shall be at the Contractor’s expense. The contractor shall manage the Government Furnished Property (Tooling) IAW FAR Part 45, Part 52.245-1 and DFARS Part 252. (CDRL A003 DI-QCIC-81794, Quality Assurance Program Plan
(QAPP))
Appendix A: Conformance and Examination Components List
P/N Drawing # NOUN
Conformance and
Examination will performed by:
Analysis Number of Pieces Required
201327771‐01 201327771
RECEPTACLE, WASTE
SERVICE OUTLET AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427599‐10 201427599
CRADLE ASSEMBLY,
WASTE TANK AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427606‐10 201427606
CRADLE ASSY,
WATER TANK AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427660‐01 201427660 INTERCOSTAL AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427677‐01 201427677
DOUBLER, WASTE
OUTLET AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427842‐01 201427842
FITTING, WASTE
RECEPTACLE AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427748‐01 201427748
WALL, CLOSET,
FRONT OUTBOARD AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427751‐01 201427751
PARTITION PANEL,
OUTBOARD, COAT
CLOSET AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427754‐01 201427754
LOWER PANEL,
CLOSET AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427756‐01 201427756 DUST COVER AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427758‐01 201427758
SHROUD , TROOP
LAVATORY, C‐5 AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427759‐10 201427759
SHROUD ASSEMBLY,
CREW AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
201427763‐10 201427763
PANEL ASSEMBLY,
FILTER SERVICE AFLCMC/WLSE
Material Via Cert of Conformance and
Dimensional Measurements via
Drawing Conformance 2
Appendix B: C-5 Lavatory Kit Components List
(See Top - Level Drawing Number: 201427863)
Appendix C: Lavatory Retrofit Kit Components List
Lavatory retrofit components kit
Part Number Drawing Number Noun QTY
201327771‐01 201327771 Receptacle, Outlet 1
201427677‐01 201427677 Doubler, waste outlet 1
201427094‐10 201427094 Door assembly, waste outlet 1
201427598‐03 201427598 Label 1
201427598‐05 201427598 Label 1
201427598‐07 201427598 Label 1
201427598‐011 201427598 Label 1
201427598‐013 201427598 Label 1
201427598‐015 201427598 Label 1
201427598‐017 201427598 Label 1
201427625‐01 201427625 guard, switch 1
201427842‐01 201427842 fitting, waste receptacle 1
201427598‐01 201427598 label, placard 1
201427598‐117 201427598 label, placard 1
201427598‐121 201427598 label, placard 1
201427588‐01 201427588 Tooling, skin cutout 1
201427759‐10 201427759 Shroud Assembly, Crew 1
201427758‐01 201427758 Shroud, Troop, Lavatory, C5 2
201427763‐10 201427763 Panel Assembly, Filter Service 1
201427754‐01 201427754 Lower Panel, Closet 1
201427751‐01 201427751 Partition Panel, Outboard, Coat Closet 1
201427748‐01 201427748 Wall, Closet, Front Outboard 1
201427756‐01 201427756 Cover, Dust 1
201427684‐05 201427684 Skin 1
Appendix D: CDRL Requirements List
DATA
ITEM #
TITLE OF CDRL DID NUMBER PARAGRAPH
A001 Status Report
DI-MGMT-
80368A/T
3.6.1, 3.8, 3.10, 3.10.2
A002 Integrated Program Management Report (IPMR)
DI-MGMT-
81861A/T
3.6.1, 3.6.3, 3.10
A003 Quality Assurance Program Plan (QAPP)
DI-QCIC-81794
3.2, 3.3, 3.3.1, 3.5.1, 3.5.2, 3.5.3, 3.7.1, 3.9, 3.10.1, 4.2, 4.3, 4.4, 4.5, 4.6, 5.0
A004 Quality Audit Site Visit Schedule
DI-SESS-81925
3.2, 3.3.1, 3.5.1, 3.5.2, 3.5.3, 4.2, 4.3, 4.4, 4.5, 4.6
A005 Conference Agenda DI-ADMN-81249 3.6.2, 3.6.3, 3.8
A006 Report Record of Meeting Minutes
DI-ADMN-81505/T 3.6.2, 3.6.3, 3.8
A007 Quality Audit Site Visit Report
DI-SESS-81921 3.2, 4.3, 4.5
A008 Quality Audit Finding and Response Record
DI-SESS-81923
3.2, 3.3.1, 4.2, 4.3, 4.4, 4.5
A009 Quality Assessment Report DI-QCIC-81187 3.3.1, 3.5.1, 4.3, 4.4, 4.5
Appendix E: C-5M Lavatory Initial Spares List
Part Number Drawing Number Item Name Qty
201427606‐10 201427606 Cradle Assy, Water Tank 4
201427660‐01 201427660 Intercostal 4
201427825‐01 201427825 Water Tank Assy 4
201427833‐01 201427833 Band Clamp 4
AS1655A08 Coupling 4
201427659‐01 201427659 Plug, Male 2
201427599‐10 201427599 Cradle Assy, Waste Tank 4
201427633‐01 201427633 Waste Tank Assy 4
201427634‐01 201427634 Strap, Waste Tank 4
201427590‐10 201427590 Tube Assy, Waste 1
201427639‐10 201427639 Tube Assy, Waste 8
201427640‐10 201427640 Tube Assy, Waste 1
201427641‐10 201427641 Tube Assy, Waste 1
201427642‐10 201427642 Tube Assy, Waste 1
201427643‐10 201427643 Tube Assy, Waste 1
201427644‐10 201427644 Tube Assy, Waste 1
201427647‐10 201427647 Tube Assy, Waste 1
201427648‐10 201427648 Tube Assy, Waste 1
201427652‐10 201427652 Tube Assy, Waste 1
201427653‐10 201427653 Tube Assy, Waste 1
201427654‐10 201427654 Tube Assy, Waste 1
201427655‐10 201427655 Tube Assy, Waste 1
201427615‐10 201427615 Bracket Assy 5
201427688‐10 201427688 Bracket Assy 1
201427689‐10 201427689 Bracket Assy 1
201427693‐10 201427693 Bracket Assy 1
201427722‐10 201427722 Bracket Assy 5
201427727‐10 201427727 Bracket Assy 3
201427774‐10 201427774 Bracket Assy 1
201427790‐10 201427790 Bracket Assy 1
201427791‐10 201427791 Bracket Assy 1
201427792‐10 201427792 Bracket Assy 1
201427826‐03 201427826 Plug, Female 1
AS1655C32 Coupling 10
737SS64‐2‐8FHT Clamp, Loop 2
201427663‐01 201427663 Sleeve, Flared, Tube Fitting 10
201427817‐15 201427817 Clamp, Loop 4
201427817‐13 201427817 Clamp, Loop 4
201427098‐01 201427098 Switch, Altitude Pressure 2
201427101‐01 201427101 Fitting, Vent 1
201427102‐01 201427102 Tube, Vent Line 1
201427613‐01 201427613 Tube, Vent Line 1
201427616‐01 201427616 Tube, Vent Line 1
201427619‐01 201427619 Isolator 10
201427622‐01 201427622 Generator, Vacuum 2
201427637‐01 201427637 Sleeve 4
201427637‐03 201427637 Sleeve 4
201427662‐01 201427662 Valve, Check 2
201427095‐01 201427095 Plate, Toilet Mount, Troop and Crew 2
201427096‐01 201427096 Channel, Mount, Crew Toilet 4
201427623‐01 201427623 Toilet Assy 3
201427093‐01 201427093 Air Compressor Assy 2
201427671‐10 201427671 Hose Assy 2
201427672‐10 201427672 Hose Assy 2
201427675‐10 201427675 Hose Assy 2
201427823‐01 201427823 Check Valve 2
201427824‐01 201427824 Air Filter 10
201427817‐03 201427817 Clamp, Loop 10
201427817‐17 201427817 Clamp, Loop 10
201427780‐10 201427780 Standoff, Clamp Assy 4
201427627‐01 201427627 Logic Control Module 2
M83536/22‐022M Relay, Motor 2
201427638‐01 201427638‐ Drain Valve Cable 2
201427817‐21 201427817 Clamp, Loop 10
201427817‐17 201427817 Clamp, Loop 2
201427817‐11 201427817 Clamp, Loop 10
201427834‐01 201427834 Valve, Fill/Drain 2
201327771‐01 201327771 Receptacle, Outlet 1
201427094‐10 201427094 Door Assy, Waste Service 2
201427626‐01 201427626 Switch Assy, Service Door 2
201427628‐01 201427628 Heater, Drain Valve 2
201427629‐01 201427629 Heater, Rinse Nipple 4
201427813‐01 201427813 Rinse Nipple 4
201427842‐01 201427842 Fitting, Waste Receptacle 2
201427621‐10 201427621 Tube Assy, Waste 2
201427632‐10 201427632 Tube Assy, Waste 2
201427656‐01 201427656 Y‐Fitting 2
201427657‐01 201427657 Hose, Water Drain 2
201427658‐01 201427658 Clamp, V‐Band 4
201427826‐01 201427826 Plug, Female 2
201427673‐10 201427673 Hose Assy 2
201427674‐10 201427674 Hose Assy 2
201427735‐10 201427735 Fitting, Vent Overflow Assy 2
201427785‐01 201427785 Fitting, Waste Tank 2
201427787‐01 201427787 Tube, Waste Drain, Flexible 2
201427835‐01 201427835 Branch Tee, .75 2
201427836‐01 201427836 T‐Fitting 2
201427837‐01 201427837 Waste Drain Valve Assy 4
201427817‐05 201427817 Clamp, Loop 20
201427817‐07 201427817 Clamp, Loop 4
201427817‐11 201427817 Clamp, Loop 20
201427817‐17 201427817 Clamp, Loop 10
201427835‐03 201427835 Branch Tee, .75 2
4E39102‐101A Waste Tube ‐ Drain 2
201427759‐10 201427759 Shroud Assy, Crew 1
201427758‐01 201427758 Shroud, Troop, Lavatory, C5 1
201427763‐01 201427763 Panel Assy, Filter Service 1
201427827‐01 201427827 Toilet Seat Assy 6
201427092‐10 201427092 Switch Mounting Plate Assy 6
201427769‐10 201427769 Plate Attachment Assy 6
201427754‐01 201427754 Lower Panel, Closet 1
201427751‐01 201427751 Partition Panel, Outboard, Coat Closet 1
201427748‐01 201427748 Wall, Closet, Front Outboard 1
201427756‐01 201427756 Cover, Dust 1
Appendix F: Government Furnished Property (Tooling) for the Manufacture of Panels and Shrouds
Government‐Furnished Property (Tooling) for the Manufacture of Panels and Shrouds
For Drawing Number Noun QTY
20147760 Tooling: B Model Crew Layup Mold (MFG Code: OGZ25) 1
20147758 Tooling: B Model Troop Layup Mold (MFG Code: OGZ25) 1
20147750 Tooling: Upper Filter Door Layup Mold (MFG Code: OGZ25) 1
20147752 Tooling: Lower Filter Door Lay Up Mold (MFG Code: OGZ25) 1
20147762 Tooling: Filter Service Lay Up Mold (MFG Code: OGZ25) 1
20147753 Tooling: Crew Door Layup Mold (MFG Code: OGZ25) 1
20147756 Tooling: Dust Cover Layup Mold (MFG Code: OGZ25) 1
File details come from the government source that posted it. Updated .