RFP_Atch_8_-_Price_Model_11-03-15.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- C-5 Engineering Requirements Review Support Program Federal contract opportunity
- Solicitation number
- FA8525-16-R-0002
About this file
Price Model
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Model
| SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 |
| FOR OFFICIAL USE ONLY |
| Company Name: |
| Address: |
| POC: |
| Phone Number: |
| CAGE Code: |
| Request for Proposal No. FA8525-15-R-92801 |
| C-5 Engineering Requirements Review Support |
FULLY BURDENED, FIRM-FIXED-PRICE, LABOR RATES
BASIC PERIOD ORDERING PERIOD II ORDERING PERIOD III ORDERING PERIOD IV ORDERING PERIOD V
| Item No. | Description | LABOR RATE | LABOR RATE | LABOR RATE | LABOR RATE | LABOR RATE |
| X004 - X007 | Program Manager | |||||
| X004 - X007 | Logistician | |||||
| X004 - X007 | Engineering Technician | |||||
| X004 - X007 | Documentation/Technical Writer | |||||
| X004 - X007 | Database Management Specialist | |||||
| X004 - X007 | Quality Assurance/Configuration Mgmt. Analyst | |||||
| X004 - X007 | Electronic/Electrical Engineer | |||||
| X004 - X007 | Aerospace/Mechanical Engineer |
| NOTES: |
| The Government will use the proposed fully burdened labor rates in its calculation of the proposed prices for CLINs X004, X005, X006 & X007 (Basic and Ordering periods II - V). |
| A fully burdened labor rate is a direct labor rate burdened with indirects (overhead and G&A), profit, and cost of money as applicable. |
| All proposed labor rates shall be rounded to two decimal places. |
| The fully burdened labor rates proposed above are FFP rates, and will be fixed for the entire applicable contract period. |
| Estimated contract periods are as follows: |
| Basic Period: 01 April 2016 - 31 March 2017, Ordering Period II: 01 April 2017 - 31 March 2018, Ordering Period III: 01 April 2018 - 31 March 2019, Ordering Period IV: 01 April 2019 - 31 March 2020, |
| Ordering Period V: 01 April 2020 - 31 March 2021, Ordering Period VI: 01 April 2021 - 30 September 2021 |
| BASIC PERIOD | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 0001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 0002 | Engineering Services in accordance with PWS 14-WLSE-24 paragraph 4.2.8 (excluding 4.2.8.4) Work Card, IDE Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 0003 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2 and 4.2.8. | CRNF | Lot | 1 | |||||
| 0004 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3 and 4.2.7: Additional Reviews of Existing Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 0005 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4 and 4.2.7: Creation of New Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 0006 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5 and 4.2.7: Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 0007 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1 and 4.2.6: Engineering Studies and Analysis | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 0008 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 excluding paragraphs 4.2.2 and 4.2.8 | CRNF | Lot | 1 | |||||
| 0009 | Travel and Per Diem as requried and approved by PCO in support of PWS 14-WLSE-24. Travel charges shall be in accordance with FAR Subpart 31 .2 | CRNF | Lot | 1 | |||||
| 0010 | Engineering Data in accordance with PWS 14-WLSE-24 and CDRLS | NSP | Lot | 1 |
NOTE: All proposed unit prices shall be rounded to two decimal places. EVALUATED PRICE FOR BASIC PERIOD $ - 0
| ORDERING PERIOD II | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 1001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 1002 | Engineering Services in accordance with PWS 14-WLSE-24 paragraph 4.2.8 (excluding 4.2.8.4) Work Card, IDE Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 1003 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2 and 4.2.8. | CRNF | Lot | 1 | |||||
| 1004 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3 and 4.2.7: Additional Reviews of Existing Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 1005 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4 and 4.2.7: Creation of New Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 1006 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5 and 4.2.7: Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 1007 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1 and 4.2.6: Engineering Studies and Analysis | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 1008 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 excluding paragraphs 4.2.2 and 4.2.8 | CRNF | Lot | 1 | |||||
| 1009 | Travel and Per Diem as requried and approved by PCO in support of PWS 14-WLSE-24. Travel charges shall be in accordance with FAR Subpart 31 .2 | CRNF | Lot | 1 | |||||
| 1010 | Engineering Data in accordance with PWS 14-WLSE-24 and CDRLS | NSP | Lot | 1 |
NOTE: All proposed unit prices shall be rounded to two decimal places. EVALUATED PRICE FOR ORDERING PERIOD II $ - 0
| ORDERING PERIOD III | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 2001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 2002 | Engineering Services in accordance with PWS 14-WLSE-24 paragraph 4.2.8 (excluding 4.2.8.4) Work Card, IDE Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 2003 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2 and 4.2.8. | CRNF | Lot | 1 | |||||
| 2004 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3 and 4.2.7: Additional Reviews of Existing Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 2005 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4 and 4.2.7: Creation of New Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 2006 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5 and 4.2.7: Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 2007 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1 and 4.2.6: Engineering Studies and Analysis | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 2008 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 excluding paragraphs 4.2.2 and 4.2.8 | CRNF | Lot | 1 | |||||
| 2009 | Travel and Per Diem as requried and approved by PCO in support of PWS 14-WLSE-24. Travel charges shall be in accordance with FAR Subpart 31 .2 | CRNF | Lot | 1 | |||||
| 2010 | Engineering Data in accordance with PWS 14-WLSE-24 and CDRLS | NSP | Lot | 1 |
NOTE: All proposed unit prices shall be rounded to two decimal places. EVALUATED PRICE FOR ORDERING PERIOD III $ - 0
| ORDERING PERIOD IV | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 3001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 3002 | Engineering Services in accordance with PWS 14-WLSE-24 paragraph 4.2.8 (excluding 4.2.8.4) Work Card, IDE Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 3003 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2 and 4.2.8. | CRNF | Lot | 1 | |||||
| 3004 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3 and 4.2.7: Additional Reviews of Existing Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 3005 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4 and 4.2.7: Creation of New Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 3006 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5 and 4.2.7: Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 3007 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1 and 4.2.6: Engineering Studies and Analysis | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 3008 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 excluding paragraphs 4.2.2 and 4.2.8 | CRNF | Lot | 1 | |||||
| 3009 | Travel and Per Diem as requried and approved by PCO in support of PWS 14-WLSE-24. Travel charges shall be in accordance with FAR Subpart 31 .2 | CRNF | Lot | 1 | |||||
| 3010 | Engineering Data in accordance with PWS 14-WLSE-24 and CDRLS | NSP | Lot | 1 |
| NOTE: All proposed unit prices shall be rounded to two decimal places. | EVALUATED PRICE FOR ORDERING PERIOD IV | $ - 0 | |||||||
| ORDERING PERIOD V | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 4001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 4002 | Engineering Services in accordance with PWS 14-WLSE-24 paragraph 4.2.8 (excluding 4.2.8.4) Work Card, IDE Integrated Schedule Sustainment | FFP | MO | 12 | $ - 0 | ||||
| 4003 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2 and 4.2.8. | CRNF | Lot | 1 | |||||
| 4004 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3 and 4.2.7: Additional Reviews of Existing Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 4005 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4 and 4.2.7: Creation of New Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| Program Manager | $ - 0 | $ - 0 | |||||||
| LABOR CATEGORIES | Logistician | $ - 0 | $ - 0 | ||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 4006 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5 and 4.2.7: Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 4007 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1 and 4.2.6: Engineering Studies and Analysis | FFP | Lot | 1 | $ - 0 | $ - 0 | |||
| LABOR CATEGORIES | Program Manager | $ - 0 | $ - 0 | ||||||
| Logistician | $ - 0 | $ - 0 | |||||||
| Engineering Technician | $ - 0 | $ - 0 | |||||||
| Documentation/Technical Writer | $ - 0 | $ - 0 | |||||||
| Database Management Specialist | $ - 0 | $ - 0 | |||||||
| Quality Assurance/Configuration Mgmt. Analyst | $ - 0 | $ - 0 | |||||||
| Electronic/Electrical Engineer | $ - 0 | $ - 0 | |||||||
| Aerospace/Mechanical Engineer | $ - 0 | $ - 0 | |||||||
| 4008 | Contractor Furnished Parts / Materials Subcontracts (Items and / or Services) in support of Engineering Services required in PWS 14-WLSE-24 excluding paragraphs 4.2.2 and 4.2.8 | CRNF | Lot | 1 | |||||
| 4009 | Travel and Per Diem as requried and approved by PCO in support of PWS 14-WLSE-24. Travel charges shall be in accordance with FAR Subpart 31 .2 | CRNF | Lot | 1 | |||||
| 4010 | Engineering Data in accordance with PWS 14-WLSE-24 and CDRLS | NSP | Lot | 1 |
| NOTE: All proposed unit prices shall be rounded to two decimal places. | EVALUATED PRICE FOR ORDERING PERIOD V | $ - 0 | |||||||
| ORDERING PERIOD VI | |||||||||
| Estimated | Estimated | Extended | |||||||
| Item No. | Description | Type | Unit | Quantity | Labor Rate | Labor Hours | Labor Dollars | Unit Price | Price |
| 5001 | Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4: ERR Review of Existing Maintenance Tasks, Integrated Schedule Sustainment | FFP | MO | 6 | $ - 0 | $ - 0 | |||
| NOTE: All proposed unit prices shall be rounded to two decimal places. | EVALUATED PRICE FOR ORDERING PERIOD VI | $ - 0 | |||||||
| TOTAL EVALUATED PRICE (BASIC & ORDERING PERIODS) | $ - 0 | ||||||||
| SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104 | |||||||||
| FOR OFFICIAL USE ONLY |
&"Arial,Bold"&10Source Selection Information - See FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
File details come from the government source that posted it. Updated .