RFP_Atch_2-RFP_Relevancy_Table.doc

DOC document 78 KB Posted

Attached to
C-5 Engineering Requirements Review Support Program Federal contract opportunity
Solicitation number
FA8525-16-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

RFP Relevancy Table

View the file

Other files for this federal contract opportunity

Other files attached to C-5 Engineering Requirements Review Support Program, newest first.
File Type Posted
16-92801_PWS_Final_1_Dec_2015.pdf PDF
FA852516R0002_______0002.pdf PDF
Contractor_Questions_Update_2.docx DOCX document
ppi_tool.accdb —
Contractor_Questions.docx DOCX document
Contractor_Questions.docx DOCX document
FA852516R0002_______0001.pdf PDF
RFP_Atch_6-Authorization_Letter.doc DOC document
RFP_Atch_4-PP_Questionnaire.doc DOC document
RFP_Atch_17-DD_Form_1423_CDRL_C002 1 .pdf PDF
Wage_Determination.pdf PDF
RFP_Atch_15-DD_Form_1423_CDRL_A007 1 .pdf PDF
RFP_Atch_19-DD_Form_1423_CDRL_C004 1 .pdf PDF
RFP_Atch_16-DD_Form_1423_CDRL_C001 1 .pdf PDF
RFP_Atch_14-DD_Form_1423_CDRL_A006 1 .pdf PDF
RFP_Atch_20-DD_Form_1423_CDRL_C005 1 .pdf PDF
RFP_Atch_13-DD_Form_1423_CDRL_A005 1 .pdf PDF
RFP_Atch_11-DD_Form_1423-CDRL_A003 1 .pdf PDF
RFP_Atch_18-DD_Form_1423_CDRL_C003 1 .pdf PDF
RFP_Atch_10-DD_Form_1423_CDRL_A002 1 .pdf PDF
RFP_Atch_3-Consent_Form.doc DOC document
RFP_Atch_9-DD_Form_1423_CDRL_A001 1 .pdf PDF
RFP_Atch_12-DD_Form_1423_CDRL_A004 1 .pdf PDF
RFP_Atch_7-PPI_for_Offerors.docx DOCX document
RFP_Atch_8_-_Price_Model_11-03-15.xlsx XLSX spreadsheet
RFP_Atch_5-Transmittal_Letter.doc DOC document
FA852516R0002_FBO.pdf PDF
RFP_Atch_1-PWS 1 .pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP # FA8525-16-R-0002

ATTACHMENT 2

RELEVANCY TABLE

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Present/Past Performance “RELEVANCY TABLE”

(TO BE COMPLETED BY OFFEROR, JOINT VENTURE MEMBER, AND CRITICAL SUBCONTRACTOR, FOR EACH EFFORT IDENTIFIED IN THE PPI TOOL)

RELEVANCY TABLE

(Complete with each effort identified for evaluation in the PPI Tool) Request the offeror/joint venture member/critical subcontractor complete a separate Relevancy Table for each effort identified for evaluation in the PPI Tool. This table, in addition o th the information provided by the offeror in the PPI Tool, will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirement. Offeror/joint venture member/critical subcontractor shall only complete column three. Offeror’s/joint venture member’s/critical subcontractor’s answers are applicable only to the effort identified inthe PPI Tool, not the offeror’s/joint venture member’s/critical subcontractor’s proposed solutions to the instant effort. Please be as specific as possible with the fill-in information provided.

CONTRACTOR:

CAGE CODE:

CONTRACT NUMBER:

PROGRAM TITLE:

CONTR AGENCY/CUSTOMER:

Category
Fill-in for the Proposed Effort (GOVT has completed this column)

(DO NOT CHANGE)

Fill-in for the Effort Identified in para. B Above (Offeror/Joint Venture Member/Critical Subcontarctor completes) The effort required:

1. Nature of Business Area(s) Involved
CASS, CAMP or MSG-3 derived maintenance program support
Yes or No
FMECA Analysis
Yes or No

Sytems Safety Analysis

Yes or No

C&A Compliance Support
Yes or No
Maint./Supply Data Support
Yes or No
T.O./Tech Data Development
Yes or No
SVWC Development
Yes or No
Other (specify)
Yes or No
1B. Nature of Business Area(s) Marketplace
Commercial
Yes or No
Government
Yes or No
3. Type of System Technology
Large Transport Aircraft (identify)
Yes or No
Other Aircraft (identify)
Yes or No
Other System (identify)
Yes or No
4. Processes Implemented
MSG-3
Yes or No
RCM
Yes or No
HVM
Yes or No
Other (list type)
Yes or No

4. Performance Location

Specify Location:

5. Contract Type(s)

Specify Type:

6. Extent of subcontractor involvement

Yes or No

If yes, state nature of involvement:

7. Certifications, Qualifications, Industry Memberships
List the items pertaining to your company and personnel
ABET accredited engineer or EIT or PE
Yes or No
IAM-3/IAT-3 CISSP
Yes or No
A4A Membership
Yes or No
Other (list type)
Yes or No
8. Program Complexity
Standard Visual Workcard (SVWC) development
Yes or No
Tech data development in accordance with MIL-STD-38784
Yes or No
Techsight/X, and Serna packages
Yes or No
Engineering analysis of maintenance tasks and task intervals
Yes or No
Support and sustainment of IDE software application
Yes or No

File details come from the government source that posted it. Updated .