FA852516R0002_FBO.pdf

PDF 8 MB Posted

Attached to
C-5 Engineering Requirements Review Support Program Federal contract opportunity
Solicitation number
FA8525-16-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

RFP

View the file

Other files for this federal contract opportunity

Other files attached to C-5 Engineering Requirements Review Support Program, newest first.
File Type Posted
16-92801_PWS_Final_1_Dec_2015.pdf PDF
Contractor_Questions_Update_2.docx DOCX document
FA852516R0002_______0002.pdf PDF
ppi_tool.accdb —
Contractor_Questions.docx DOCX document
Contractor_Questions.docx DOCX document
FA852516R0002_______0001.pdf PDF
RFP_Atch_12-DD_Form_1423_CDRL_A004 1 .pdf PDF
RFP_Atch_7-PPI_for_Offerors.docx DOCX document
RFP_Atch_8_-_Price_Model_11-03-15.xlsx XLSX spreadsheet
RFP_Atch_5-Transmittal_Letter.doc DOC document
RFP_Atch_1-PWS 1 .pdf PDF
RFP_Atch_6-Authorization_Letter.doc DOC document
RFP_Atch_4-PP_Questionnaire.doc DOC document
RFP_Atch_17-DD_Form_1423_CDRL_C002 1 .pdf PDF
RFP_Atch_13-DD_Form_1423_CDRL_A005 1 .pdf PDF
RFP_Atch_11-DD_Form_1423-CDRL_A003 1 .pdf PDF
RFP_Atch_18-DD_Form_1423_CDRL_C003 1 .pdf PDF
RFP_Atch_10-DD_Form_1423_CDRL_A002 1 .pdf PDF
RFP_Atch_3-Consent_Form.doc DOC document
RFP_Atch_9-DD_Form_1423_CDRL_A001 1 .pdf PDF
Wage_Determination.pdf PDF
RFP_Atch_15-DD_Form_1423_CDRL_A007 1 .pdf PDF
RFP_Atch_19-DD_Form_1423_CDRL_C004 1 .pdf PDF
RFP_Atch_2-RFP_Relevancy_Table.doc DOC document
RFP_Atch_16-DD_Form_1423_CDRL_C001 1 .pdf PDF
RFP_Atch_14-DD_Form_1423_CDRL_A006 1 .pdf PDF
RFP_Atch_20-DD_Form_1423_CDRL_C005 1 .pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8525-16-R-0002

X

X

6.SOLICITATION ISSUE DATE

5 NOV 2015

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 541330

8(A) SIZE STANDARD: $15.00

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

See "Instructions to Offerors" and "Evaluation Basis for Award" provisions on pages 72-78 and 79-92, respectively for information relative to proposal preparation and the Government's evaluation methodology.

Contract awarded as a result of this solicitation will be a single awards, Indefinite Delivery Indefinite Quantity (IDIQ). The guaranteed minimum is one month of services for the life of the contract (basic plus any options exercised) and will be met with issuance of a task order with the award of the basic IDIQ contract. The maximum to be ordered is five years of services.

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8525

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:C

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Engineering Services

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

5-DEC-2015 3:30PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

GALAXY (C-5), AFLCMC/WLSK

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 6501

ROBINS AFB GA 31098-1670

BUYER: Valerie L.Evans/WLSK valerie.kirchhefer@us.af.mil Phone: (478) 222- 1225 Fax: (000) 000-0000 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JS

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA852516R0002

DUE: 5 DEC 2015 3:30 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Valerie L Kirchhefer/WLSK

GALAXY (C-5), AFLCMC/WLSK

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 6501

ROBINS AFB GA 31098-1670

Request for Proposal FA8525-16-R-0002

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

This solicitation contains one twelve-month ordering period and four options for additional annual ordering periods. Period of performance will be stated on each individual order. Prices should be entered on Attachment 8, the Price Model.

BASIC ORDERING PERIOD

Orders may be placed from date of award through 12 months.

Period of Performance to be stated on each individual order.

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

000101 AA

000102 AB

Annual review of 12.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4 R425 Associated Document(s) Line Item(s)

FD20601692801 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2000

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

Engineering Services

Annual Review of 12.5% of Maintenance Tasks

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Work Card and Integrated Data Environment (IDE) Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

000201 AA

000202 AB

R425 Work Card and Integrated Data Environment (IDE) Engineering Services in support of ERR and in accordance with PWS 14-WLSE-24, paragraph 4.2.8 Associated Document(s) Line Item(s)

FD20601692801 0003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of

12 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

CAPP

Contractor Furnished Parts/Materials Subcontracts in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2, 4.2.8, and 4.2.9 Associated Document(s) Line Item(s)

FD20601692801 0005

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

000401 AA

000402 AB

Review of additional 7.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3, 4.2.7 and 4.2.7 R425 Associated Document(s) Line Item(s)

FD20601692801 0007

Limitations of Liability: Other Than High Value Item

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Creation of New Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

000501 AA

000502 AB

Creation of New Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Applicability: HERCULES Cargo Aircraft ;

Engineering Services

Creation of New Maintenance Tasks

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Conditioned-Based Maintenance Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

000601 AA

000602 AB

Conditioned-Based Maintenance (CBM) Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0011

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Conditioned-Based Maintenance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Studies and Analysis Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

000701 AA

000702 AB

Engineering Studies and Analysis Engineering Services in support of ERR in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, and 4.2.6 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0013

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of

1 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

000801 AA

000802 AB

CAPP

Contractor Furnished Parts/Materials Subcontracts (Items and/or Services) in support of Engineering Services required in PWS 14-WLSE-24, excluding paragraphs 4.2.2, 4.2.8, and 4.2.9 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model.

Associated Document(s) Line Item(s)

FD20601692801 0015

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

000901 AA

000902 AB

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF PWS 14-WLSE-24. TRAVEL REIMBURSED IAW FAR 31.2

Associated Document(s) Line Item(s)

Travel

FD20601692801 0017

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Data

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 LO See Attachment 8 See Attachment 8

CLIN ACRN ACRN Total

0010 AA

DATA

Engineering Data Associated Document(s) Line Item(s)

FD20601692801 0019

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

Engineering Data

1 LO

OPTION I--SECOND ORDERING PERIOD

Option may be exercised any time prior to the expiration of the Basic Ordering Period.

Orders may be placed during the 12 months following the Basic Ordering Period.

Period of Performance to be stated on each individual order.

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

100101 AA

100102 AB

Annual review of 12.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4:

R425 Associated Document(s) Line Item(s)

FD20601692801 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Annual Review of 12.5% of Maintenance Tasks

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Work Card and Integrated Data Environment (IDE) Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

100201 AA

100202 AB

R425 Work Card and Integrated Data Environment (IDE) Engineering Services in support of ERR and in accordance with PWS 14-WLSE-24, paragraph 4.2.8 Associated Document(s) Line Item(s)

FD20601692801 0003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of

12 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

CAPP

Contractor Furnished Parts/Materials Subcontracts in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2, 4.2.8, and 4.2.9 Associated Document(s) Line Item(s)

FD20601692801 0005

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

100401 AA

100402 AB

Review of additional 7.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3, 4.2.7 and 4.2.7 R425 Associated Document(s) Line Item(s)

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Creation of New Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

100501 AA

100502 AB

Creation of New Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Engineering Services

Creation of New Maintenance Tasks

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Conditioned-Based Maintenance Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

100601 AA

100602 AB

Conditioned-Based Maintenance (CBM) Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0011

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Conditioned-Based Maintenance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Studies and Analysis Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

100701 AA

100702 AB

Engineering Studies and Analysis Engineering Services in support of ERR in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, and 4.2.6 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0013

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

100801 AA

100802 AB

CAPP

Contractor Furnished Parts/Materials Subcontracts (Items and/or Services) in support of Engineering Services required in PWS 14-WLSE-24, excluding paragraphs 4.2.2, 4.2.8, and 4.2.9 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model.

Associated Document(s) Line Item(s)

FD20601692801 0015

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

100901 AA

100902 AB

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel

FD20601692801 0017

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Data

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 LO See Attachment 8 See Attachment 8

CLIN ACRN ACRN Total

1010 AA

DATA

Engineering Data Associated Document(s) Line Item(s)

FD20601692801 0019

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Engineering Data

1 LO

OPTION II--THIRD ORDERING PERIOD

Option may be exercised any time prior to the expiration of the Second Ordering Period.

Orders may be placed during the 12 months following the Second Ordering Period.

Period of Performance to be stated on each individual order.

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

200101 AA

200102 AB

Annual review of 12.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4:

R425 Associated Document(s) Line Item(s)

FD20601692801 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

12 MO TBC

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Proposed Period of Performance

12 MO

Engineering Services

Work Card and Integrated Data Environment (IDE) Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

200201 AA

200202 AB

R425 Work Card and Integrated Data Environment (IDE) Engineering Services in support of ERR and in accordance with PWS 14-WLSE-24, paragraph 4.2.8 Associated Document(s) Line Item(s)

FD20601692801 0003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee

Contractor Furnished Parts/Materials Subcontracts

Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

CAPP

Contractor Furnished Parts/Materials Subcontracts in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2, 4.2.8, and 4.2.9 Associated Document(s) Line Item(s)

FD20601692801 0005

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

200401 AA

200402 AB

Review of additional 7.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3, 4.2.7 and 4.2.7 R425 Associated Document(s) Line Item(s)

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Creation of New Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

200501 AA

200502 AB

Creation of New Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Engineering Services

Creation of New Maintenance Tasks

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Conditioned-Based Maintenance Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

200601 AA

200602 AB

Conditioned-Based Maintenance (CBM) Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0011

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Conditioned-Based Maintenance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Studies and Analysis Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

200701 AA

200702 AB

Engineering Studies and Analysis Engineering Services in support of ERR in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, and 4.2.6 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0013

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

200801 AA

200802 AB

CAPP

Contractor Furnished Parts/Materials Subcontracts (Items and/or Services) in support of Engineering Services required in PWS 14-WLSE-24, excluding paragraphs 4.2.2, 4.2.8, and 4.2.9 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model.

Associated Document(s) Line Item(s)

FD20601692801 0015

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

200901 AA

200902 AB

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel

FD20601692801 0017

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Data

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 LO See Attachment 8 See Attachment 8

CLIN ACRN ACRN Total

2010 AA

DATA

Engineering Data Associated Document(s) Line Item(s)

FD20601692801 0019

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Engineering Data

1 LO

OPTION III--FOURTH ORDERING PERIOD

Option may be exercised any time prior to the expiration of the Third Ordering Period.

Orders may be placed during the 12 months following the Third Ordering Period.

Period of Performance to be stated on each individual order.

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

300101 AA

300102 AB

Annual review of 12.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4:

R425 Associated Document(s) Line Item(s)

FD20601692801 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Proposed Period of Performance

12 MO

Engineering Services

Work Card and Integrated Data Environment (IDE) Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

300201 AA

300202 AB

R425 Work Card and Integrated Data Environment (IDE) Engineering Services in support of ERR and in accordance with PWS 14-WLSE-24, paragraph 4.2.8 Associated Document(s) Line Item(s)

FD20601692801 0003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Contractor Furnished Parts/Materials Subcontracts

Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

CAPP

Contractor Furnished Parts/Materials Subcontracts in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2, 4.2.8, and 4.2.9 Associated Document(s) Line Item(s)

FD20601692801 0005

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

300401 AA

300402 AB

Review of additional 7.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3, 4.2.7 and 4.2.7 R425 Associated Document(s) Line Item(s)

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Creation of New Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

300501 AA

300502 AB

Creation of New Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Engineering Services

Creation of New Maintenance Tasks

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Conditioned-Based Maintenance Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

300601 AA

300602 AB

Conditioned-Based Maintenance (CBM) Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0011

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Conditioned-Based Maintenance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Studies and Analysis Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

300701 AA

300702 AB

Engineering Studies and Analysis Engineering Services in support of ERR in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, and 4.2.6 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0013

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

300801 AA

300802 AB

CAPP

Contractor Furnished Parts/Materials Subcontracts (Items and/or Services) in support of Engineering Services required in PWS 14-WLSE-24, excluding paragraphs 4.2.2, 4.2.8, and 4.2.9 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model.

Associated Document(s) Line Item(s)

FD20601692801 0015

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

300901 AA

300902 AB

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel

FD20601692801 0017

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Data

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 LO See Attachment 8 See Attachment 8

CLIN ACRN ACRN Total

3010 AA

DATA

Engineering Data Associated Document(s) Line Item(s)

FD20601692801 0019

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Engineering Data

1 LO

OPTION IV--FIFTH ORDERING PERIOD

Option may be exercised any time prior to the expiration of the Fourth Ordering Period.

Orders may be placed during the 12 months following the Fourth Ordering Period.

Period of Performance to be stated on each individual order.

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

400101 AA

400102 AB

Annual review of 12.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.2, 4.2.7 and 4.2.8.4:

R425 Associated Document(s) Line Item(s)

FD20601692801 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Engineering Services

Annual Review of 12.5% of Maintenance Tasks Proposed Period of Performance

12 MO

Engineering Services

Work Card and Integrated Data Environment (IDE) Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

400201 AA

400202 AB

R425 Work Card and Integrated Data Environment (IDE) Engineering Services in support of ERR and in accordance with PWS 14-WLSE-24, paragraph 4.2.8 Associated Document(s) Line Item(s)

FD20601692801 0003

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Contractor Furnished Parts/Materials Subcontracts

Item No.

Contractor Furnished Parts/Materials Subcontracts

Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

CAPP

Contractor Furnished Parts/Materials Subcontracts in support of Engineering Services required in PWS 14-WLSE-24 paragraph 4.2.2, 4.2.8, and 4.2.9 Associated Document(s) Line Item(s)

FD20601692801 0005

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

12 MO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

400401 AA

400402 AB

Review of additional 7.5% of Existing Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.3, 4.2.7 and 4.2.7 R425 Associated Document(s) Line Item(s)

Engineering Services

Review of Additional 7.5% of Existing Maintenance Tasks

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

12 MO TBC

Proposed Period of Performance

12 MO

Engineering Services

Creation of New Maintenance Tasks Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

400501 AA

400502 AB

Creation of New Maintenance Tasks Engineering Services in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.4, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0009

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Engineering Services

Creation of New Maintenance Tasks

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Conditioned-Based Maintenance Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

400601 AA

400602 AB

Conditioned-Based Maintenance (CBM) Conditioned-Based Maintenance (CBM) Tailoring of Scheduled Maintenance Tasks in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, 4.2.5, and 4.2.7 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0011

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Engineering Services

Conditioned-Based Maintenance

1 MO TBC

Proposed Period of Performance

1 MO

Engineering Services

Studies and Analysis Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

1 MO To be Negotiated To be Negotiated

Sub CLIN ACRN ACRN Total

400701 AA

400702 AB

Engineering Studies and Analysis Engineering Services in support of ERR in accordance with PWS 14-WLSE-24 paragraphs 4.2.1, and 4.2.6 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model. R425 Associated Document(s) Line Item(s)

FD20601692801 0013

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

1 MO TBC

Proposed Period of

Contractor Furnished Parts/Materials Subcontracts

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

400801 AA

400802 AB

CAPP

Contractor Furnished Parts/Materials Subcontracts (Items and/or Services) in support of Engineering Services required in PWS 14-WLSE-24, excluding paragraphs 4.2.2, 4.2.8, and 4.2.9 Prices to be negotiated on individual orders in accordance with Attachment 8, Price Model.

Associated Document(s) Line Item(s)

FD20601692801 0015

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Est Unit Cost Total Estimated Cost

1 LO See Attachment 8 See Attachment 8

Sub CLIN ACRN ACRN Total

400901 AA

400902 AB

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel

FD20601692801 0017

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be cited on individual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .