This is Amendment 0001 to solicitation FA8524-25-R-0005 issued by the Air Force Sustainment Center at Robins AFB for the overhaul of UH-1N Main Rotor Hub Assembly components. The amendment extends the proposal due date to March 28, 2025 at 4:00 PM.
The amendment provides additional technical information regarding current retirement life hours for various rotor components, including: MR Yoke (25,000 hrs), Trunnion (25,000 hrs), Pitch Horn (4,800 hrs), multiple MR Grip variants (25,000 hrs), Drag Brace models (4,800 hrs), O/B Fittings (3,000 hrs), Pin (3,000 hrs), Strap (3,000 hrs), I/B Fitting (3,000 hrs), and Pillow Block (On Condition). This technical information was added to ensure clarity, compliance and completeness of the procurement process. All other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8524-25-R-0005 0004.pdf | ||
| FA8524-25-R-0005 0003.pdf | ||
| FA8524-25-R-0005-0002.pdf | ||
| Question_Answers_2_05March2025.pdf | ||
| QA_27Feb2025.pdf | ||
| FA852425R0005.pdf | ||
| Atch_6_FirstArticle_Form260.pdf | ||
| Atch_5_Pre-Qual_24June2024.pdf | ||
| Exhibit_A_C_01212025.pdf | ||
| Atch_1_PWS_FINAL_8Jan2025.pdf | ||
| Atch_3_TRNSPDATA_REPORT.pdf | ||
| Atch_2_PKGRQMT_REPORT.pdf | ||
| FA852425R0005.pdf | ||
| Atch_4_GFPFA852425R0005_16Jan2025.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8524-25-R-0005-0001
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD20602400659
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
SOF - FIXED WING/ROTARY WING, AFSC/PZAAA
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 327 3661
ROBINS AFB GA 31098-1670
BUYER: Jorja A. Chesnut/PZAAA jorja.chesnut@us.af.mil
7. ADMINISTERED BY (If other than item 6) CODEFA8524
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852425R0005
9B. DATED (SEE ITEM 11)
28-JAN-2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 28-MAR-2025 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8524-25-R-0005-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
1. The purpose of this amendment is to revise the solicitation by adding the information below to ensure clarity, compliance, and completeness of the procurement process and extend the proposal due date to 28 March 2025 @ 4:00pm.
2. This amendment includes additional technical information below that may be needed concerning the current retirement of components.
a.
Nomenclature Part Number Current Retirement Life (HRS) MR Yoke 204-011-102-17 25,000 Trunnion 204-011-105-1 25,000 Pitch Horn 204-011-120-5 4,800 MR Grip 204-011-121-5G 25,000 MR Grip 204-011-121-9G 25,000
MR Grip 204-011-121-125 G 25,000
Drag Brace 204-011-140-1 4,800 Drag Brace 204-011-140-3 4,800 Drag Brace 204-011-140-5 4,800 O/B Fitting 204-012-103-3 3,000 O/B Fitting 204-012-103-5 3,000 Pin 204-012-104-5 3,000 Strap 204-310-101-101 3,000 I/B Fitting 212-010-103-007 3,000 Pillow Block 204-011-108-3 On Condition
3. All other terms and conditions of the original solicitation remain unchanged.