Atch_6_FirstArticle_Form260.pdf

PDF 129 KB Posted

Attached to
Overhaul the UH-1N Main Rotor Hub Assembly Federal contract opportunity
Solicitation number
FA8524-25-R-0005
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is an AFMC Form 260 First Article Requirements document associated with a solicitation for overhauling the UH-1N Main Rotor Hub Assembly. The form specifies requirements for first article testing of 1 unit, which will be in addition to the production quantity and will serve as a manufacturing standard.

Key requirements include contractor testing for material, finish, dimensional, and functionality specifications per Drawing 204-012-101 Rev. BP. A test plan is required within 45 days of contract start, with 30 days notice required before testing begins. The test report must be submitted within 150 days of contract start to DLA Central Receiving at Robins AFB, GA. The report must include certifications for hardware/materials, dimensional checks, calibration records, job travelers, and test results. Long lead time items and special production facility requirements apply. The estimated cost of government testing/inspection is $1,730. First article testing cannot be waived, and approved articles will be forwarded to Supply while disapproved articles will be returned to the contractor.

View the file

Other files for this federal contract opportunity

Other files attached to Overhaul the UH-1N Main Rotor Hub Assembly, newest first.
File Type Posted
FA8524-25-R-0005 0004.pdf PDF
FA8524-25-R-0005 0003.pdf PDF
FA8524-25-R-0005-0002.pdf PDF
Question_Answers_2_05March2025.pdf PDF
QA_27Feb2025.pdf PDF
FA8524-25-R-0005 0001.pdf PDF
FA852425R0005.pdf PDF
Atch_2_PKGRQMT_REPORT.pdf PDF
FA852425R0005.pdf PDF
Atch_4_GFPFA852425R0005_16Jan2025.pdf PDF
Atch_5_Pre-Qual_24June2024.pdf PDF
Exhibit_A_C_01212025.pdf PDF
Atch_1_PWS_FINAL_8Jan2025.pdf PDF
Atch_3_TRNSPDATA_REPORT.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

25 NOV 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

97499 / 204-012-101-029G

4. NSN

1615015099741GA

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Material, Finish, Dimensional, and Functionality specifications

B. The detailed technical requirements for First Article approval tests are contained in

Drawing 204-012-101 Rev. BP or later and associated sub assembly drawings per TO 3R1-6-4-4.

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and traci.polk@us.af.mil

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

See REMARKS Note 1

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 2Generated by PRPS using Jasper Reports on 10 Dec 2024

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within calendar days from date contract.

(2) Notify calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,730.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 2Generated by PRPS using Jasper Reports on 10 Dec 2024

12. REMARKS

Bailey, Andrew CNAME: 25 NOV 2024DATE:

Note 1: Ship First Article Test Report to:

Attn: Traci Polk DLA Central Receiving/DDWG-ER Special Handling: FA UNIT-DO NOT POST 455 Byron St, Bldg 376 Robins AFB, GA 31098-1887 Note 2: First article test report should include:

1. Certifications for all purchased hardware/material.

2. Dimensional check worksheet.

3. A copy of the latest calibration certifications for all measuring instruments used to perform the dimensional checks.

4. Certifications for any work not performed by the contractor, if applicable.

5. Job travelers. Job travelers should include process from start to finish, even if the first article is requested without coatings.

6. Results of all testing requirements indicated on drawing.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Bailey, Andrew C

AFLCMC/WI U E D

478-926-0927

468-0927

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

AFMC IMT 260, 20230316, V-5,

Version 2Generated by PRPS using Jasper Reports on 10 Dec 2024

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

97499 / 204-012-101-015G

4. NSN

1615015099742GA

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Material, Finish, Dimensional, and Functionality specifications

B. The detailed technical requirements for First Article approval tests are contained in

Drawing 204-012-101 Rev. BP or later and associated sub assembly drawings per TO 3R1-6-4-4.

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and traci.polk@us.af.mil

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

See REMARKS Note 1

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 10 Dec 2024

F. FIRST ARTICLE DELIVERY

(1) Due within calendar days from date contract.

(2) Notify calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,730.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 10 Dec 2024

12. REMARKS

Bailey, Andrew CNAME: 25 NOV 2024DATE:

Note 1: Ship First Article Test Report to:

Attn: Traci Polk DLA Central Receiving/DDWG-ER Special Handling: FA UNIT-DO NOT POST 455 Byron St, Bldg 376 Robins AFB, GA 31098-1887 Note 2: First article test report should include:

1. Certifications for all purchased hardware/material.

2. Dimensional check worksheet.

3. A copy of the latest calibration certifications for all measuring instruments used to perform the dimensional checks.

4. Certifications for any work not performed by the contractor, if applicable.

5. Job travelers. Job travelers should include process from start to finish, even if the first article is requested without coatings.

6. Results of all testing requirements indicated on drawing.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Bailey, Andrew C

AFLCMC/WI U E D

478-926-0927

468-0927

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 10 Dec 2024

first article requirements 9741
first article requirements 9742

File details come from the government source that posted it. Updated .