PERFORMANCE-BASED WORK STATEMENT

FOR THE LIMITED OVERHAUL OF

C-5 ENVIRONMENTAL &

FLIGHT CONTROL COMPONENTS

FD2060-07-10391

1.0 DESCRIPTION OF SERVICES. The Air Force has a requirement for depot-level repair to be performed on C-5 Environmental and Flight Control components. The government will furnish reparable condition Manifold Assemblies, as they generate. This Performance-Based Work Statement defines those services, data, and materials to be supplied by the contractor to provide sustainment support and repair for the C-5 Environmental and Flight Control components proprietary to Parker Hannifin. The depot-level maintenance to be performed includes, but is not limited to, teardown analysis and repair, testing, procurement of spare components, packaging, handling, storage, transportation, as well as data collection. Within the context of this document, support shall include the types of activities listed in paragraph 4.1 below. The associated National Stock Numbers are listed in Appendix A. These services will enable the C-5 aircraft to perform its peacetime and wartime missions.

2.0 SERVICES SUMMARY (SS). The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective
Para
Performance Threshold
Repair of C-5 Flight Control and Environmental Components.
4.2 & 4.3
No more than 1 PQDR for the total of NSNs on the contract. Consideration shall be paid at 10% of unit repair price for additional PQDRs.
Delivery Schedule
4.1.3
Assets will be delivered on time in accordance with contract schedule, to be negotiated prior to contract award, 100% of the time.
Provide notification to the government of any material deficiencies which have or have potential to adversely impact the program (DI-QCIC-80125B)
4.8 & 4.9
100 % of the time within 24 hours of discovery.

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES. Commercial Asset Visibility (CAV-AF) Internet system access and training will be provided per DD Form 1423-1, Authority DI-MGMT-81634A, by Keith Lackey, 586 CBSS/GBMSCBA, (478)926-3450, upon request.

4.0

GENERAL INFORMATION.

4.1 Repair. The contractor shall provide all plant facilities, labor and equipment, materials, resources, and services necessary to perform successful repair, calibration, and functional test required to restore the C-5 Environmental and Flight Control Components listed in Appendix A to a serviceable condition. Successful repair of the components will be in accordance with procedures outlined in the appropriate Technical Order (T.O.) listed in paragraph 5.0.B, Appendix. For T.O.s that are outdated per contractor’s specifications, contractor’s data will be used. Contractor will notify the PMS of changes/updates where there is discrepancy between the T.O. documents.

4.1.1. The contractor shall not repair any end items where the total cost of parts and labor exceed 75% of the Government stock list price of the item without authorization. When repair exceeds the 75% threshold, contractor shall contact the PMS Seller through the ACO/PCO and provide cost breakdown of the required parts. The PMS will coordinate with the Materiel Manager and Equipment Specialist to determine if Over & Above repair or condemnation will be authorized. Any/all residue from proposed contract will be disposed of in accordance with normal plant clearances as determined by the ACO/PCO and the PMS.

4.1.2. The contractor shall provide earliest delivery schedule possible per line item, per delivery order. Aircraft availability schedules are predicated on delivery estimations. Delayed deliveries impact aircraft availability, and, therefore, the C-5 day-to-day and wartime missions. One hundred percent adherence to delivery schedules is imperative.

4.2 Quality Control. The contractor shall develop and maintain a quality program that meets the requirements of ISO9001:2000 or equivalent. No component shall be replaced with any other item of different configuration or part number, as called out in the applicable overhaul T.O. and/or the Illustrated Parts Breakdown (IPB) of the applicable T.O. without prior approval from the Air Force’s assigned system engineer (730 ACSSS/GFEAA). Contractor shall notify the PCO of changes in overhaul/repair procedures, safety summary/warnings/cautions/notes, parts/part numbers, illustrations, and special tools and test equipment. The PCO will flow such information to the Equipment Specialist for Government T.O. update.

4.3 Quality Assurance. The Air Force DCMA QAR will perform on-site inspections of the contractor’s production and quality control programs to monitor performance and ensure that satisfactory services are received. Quality compliance will be monitored using the deficiency reporting systems defined in T.O. 00-35D-54. No more than 1 PQDR for the total of NSNs on the entire contract is acceptable. The contractor shall be responsible for initially validating customer complaints. However, the Air Force representative shall make final determination of the validity of customer complaint(s) in cases of disagreement. Air Force acceptance of the repaired item will be made at the contractor’s facility and will be documented via a Wide Area Workflow (WAWF), Material Inspection and Receiving Report.

4.4 Asset Packaging and Disposition. Transportation requirements shall be in accordance with the Transportation Data for Solicitations Form (DD 1653) and packaging in accordance with the Packaging Requirements Form (AFMC 158). When shipping containers are received that meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored, and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158. For instances of asset discrepancy identification, condemnation, or repair completion and final inspection, the contractor shall contact the Air Force’s Point of Contact to obtain disposition instruction for the related misidentified, condemned, or serviceable condition asset.

4.4.1 Disposition instruction will be reflective of the situation and/or the Air Force’s priority of need. Options will range from on-site demilitarization procedures to commercial shipping. Routine requirements will ship by normal traceable means (i.e., ground), and MICAP and SURGE requirements will ship by fastest traceable means (i.e., overnight).

4.4.2 FAST TRANSPORTATION will be implemented for serviceable condition assets involved with this procurement effort, IAW AFMCFAR 5352.247-9019.

4.4.3 Unique Identification. (FAR 252.211-2-6 applies). The contractor shall provide DoD unique item description, or a DoD recognized unique identification equivalent, for all delivered items for which the Government’s unit acquisition cost is $5,000.00 or more.

4.5 Performance of Service During Crisis. . The FC has determined, In accordance with DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crisis, these services are not considered to be mission essential during time of crisis.

4.6 Inspection of Services. FAR 52.246-4 applies. This clause will be inserted into the contractual document. It details the Government’s right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

4.7 CAVAF. The contractor shall report using Commercial Asset Visibility (CAVAF) (CDRL A001, DI-MGMT-81634A). The contractor shall provide data related to the tasks and efforts conducted for each reparable unit. Government contractors must use a valid Public Key Infrastructure (PKI) certificate to access/log into CAV AF. If CAVAF training is required and for information concerning the PKI requirement, contract 586 CBSS/GBMCA, Centralized Sellers Office (CSO), Robins AFB GA 31098, Phone (478) 926-3450, for additional information. The contractor shall conduct production reporting on a daily or as transactions occur basis.

4.8 Alert/Safe Alert. Electronic submission of Alert/Safe Alert GIDEP Form 97-1 is preferred; however, the contractor has the choice to use either method to notify the government of any material deficiencies which have adversely impacted or have potential to impact within 24 hours of discovery (CDRL, DI-QCIC-80125B).

4.9 GIDEP ALERT/SAFE-ALERT RESPONSE. Contractor shall prepare a GIDEP Response to Alert/Safe Alerts as required by AFMCI 21-113, paragraph A3.8.4 (page 112) (CDRL, DI-QCIC-80126B).

5.0 APPENDICES.

A.

Component Listing.

C-5 Safety Relief Valve
NSN 4820-01-318-1730UC
P/N 7720030-105
C-5 Sensing Element
NSN 6340-00-510-7900UC
P/N 7720009-103
C-5 Safety Relief Valve
NSN 4820-01-318-3568UC
P/N 7720030-106
C-5 Cylinder, Actuating, Linear
NSN 6615-00-184-5754UC
P/N 93347-1
C-5 Valve, Vent
NSN 4820-00-195-4164UC
P/N 7720022-101
C-5 Extinguisher, Fire, Aircraft
NSN 1680-00-425-7542UC
P/N 7720007-102
C-5 Nitrogen Fire Suppression
NSN 1680-01-070-4375UC
P/N 7720304-102
C-5 DEWAR Relief Valve
NSN 4820-00-270-0681UC
P/N 7720030-102
C-5 Receptacle Assembly, Flight Refueling Probe
NSN 1680-01-496-8566UC

Supersedes

NSN-1680-00-106-8527UC

P/N 4-1265-101-101

Supersedes

P/N 4-1265-101

B.

Reference Documents

Name of Publication
Sections that Apply
Date of Publication and Changes
Title of Publication

AFI 63-124

Entire

1 Aug 2005

Performance-Based Services Acquisition (PBSA)

FAR 52.246-4
Entire
August 1996
Inspection of Services -- Fixed-Price
DoD 5200.2-R
Entire
January 1987
Personnel Security Program
AFMCFAR 5352.247-9019
Entire
April 2001
Fast Transportation
AFMCI 21-113
Attachment 3, Checklist For Contract Maintenance Review Board, Para A3.8.4 (Page 112)
2 June 2005
Contract Maintenance Program For Depot Maintenance Activity Group (DMAG)
T.O. 00-35D-54
Entire
1 May 2007
USAF Deficiency Reporting, Investigation and Resolution

T.O. 13F5-16-1

Entire
1 May 2006
Operation, Service and Repair Instructions with Illustrated Parts Breakdown, Liquid Level Sensor Signal Conditioner, P/N 7720009-103, NSN 6340-00-510-7900

T.O. 5A14-2-24-3

Entire
1 July 2002
Overhaul Instructions, Lower and Upper Rudder Control Assembly CEI NO MA001A, Detail Spec. No. 41014 and 41577, Part No. 92700 and 93300
T.O. 5A14-2-24-4
Entire
1 November 2005
Illustrated Parts Breakdown, Lower and Upper Rudder Control Assembly Part NO. 92700 and 93300

T.O. 6A6-14-3

Entire
1 October 2002
Overhaul Instructions with Illustrated Parts Breakdown Aerial Refueling Receptacle CEI NO. MA0001A, DETAIL SPEC. NO. 41055, Part No. 41265-1 (FSN 1680-824-6343LH), 4-1265-51 (FSN 1680-138-6596), 4-1265-101 (FSN 1680-106-8527), 4-1265-101-101 (NSN 1680-01-496-8566UC)
T.O. 13F8-3-3
Entire
1 September 2003
Operation and Maintenance Instructions with Illustrated Parts Breakdown Vent Coupling Receptacle, Part Number 7720022-101, NSN 1680-00-195-4164

T.O. 13F6-21-3

Entire
20 July 2006
Overhaul and Repair Instructions with Illustrated Parts Breakdown, Liquid Nitrogen Dewar Container Assembly, 7720007-101, 772007-102, 1680-00-425-7542
T.O. 13F9-5-3
Entire
28 February 2005
Overhaul and Repair Instructions with Illustrated Parts Breakdown, Nitrogen Fire Suppression Main Display and Control Panel 7720304-102

T.O. 13F7-13-3

Entire
1 October 2004
Overhaul Instructions with Illustrated Parts Breakdown Dewar Relief Valve 7720030-101, 7720030-102, 4820-186-6572, 4820-270-0681

C.

Military Standards

MIL-STD-129P w/Change 3, All, 29 Oct 04, Military Marking for Shipment and Storage

MIL-STD2073-1D (1), All, 10 May 02, DoD Standard Practice for Military Packaging

FD2060-07-10391

574 CBSS/GBMAB

18 March 08