Form1423_0710391_00_1.pdf - - 06-02-2008.pdf
PDF 722 KB Posted
- Attached to
- Maintenance, Repair, and Rebuilding of Equipment
- Solicitation number
- FA8524--0-9--R-10391
About this file
Commerical Asset Visibility (CAV II)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| APPXC_0710391_00_1.doc - - 08-20-2007.doc | DOC document | |
| Form2875_0710391_00_1.pdf - - 06-02-2008.pdf | ||
| Form2169_0710391_00_1.doc - - 08-20-2007.doc | DOC document | |
| Solicitation 10391.RTF | RTF text file | |
| Wage Determination.pdf | ||
| Form1423_0710391_02_2.pdf - - 06-02-2008.pdf | ||
| Form1423_0710391_00_5.pdf - - 08-20-2007.pdf | ||
| PWS_0710391_02_1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page I of I Pages
17. PRICE
GROUP
18.
ESTIMATED
TOTAL
PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports (0701-0188),1215Jefferson Davis Highway,Suite 1204,Arlington,VA22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penaltYfor failing to comply with a collection of information if it does not display a currently valid OMBcontrol number. Please DONOTRETURNyour form to the above address. Send completed form to the Government issuing Contracting Officerfor the ContractJPR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
I B. EXHIBIT I C. CATEGORY:A TDP TM OTHER
D. SYSTEM/ITEM I E.CONTRACT/PRNO. IF. CONTRACTORFIRE SUPPRESSION SYSTEM COMPONENTS (C5) FD2060-07-10391
1. DATA ITEM NO 2. TITLE OF DATA ITEM
I 3.SUBTITLEAOOI Commercial Asset Visibility (CAVIl) CAVIl
4. AUTHORITY(DataAcquisitionDocumentNo.) 15. CONTRACTREFERENCE
6. REQUIRING OFFICE
DI-MGMT-81634A PBSOW, PARA 4.10 586 CBSS/GBMSC
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION
REQUIRED SUBMISSION
LT** N/A See Block 16 See Block 16 b.COPIES l';n,,1
8. APPCODE 11. ASOFDATE 13. DATEOFSUBSEQUENT Reg Repro
N/A See Block 16
SUBMISSION
See Block 16
16. REMARKS
** BLOCK 7: DD Fonn 250 shall be required for Priced Data. When required, DD Fonn 250 will be submitted to 574 CBSS/GBASSM.
1. The contractor will report end item and Govermnent-Fumished Material
(GFM) data through electronic submission in CAVIl using the CAVIl web site lAW CAVIl SOW. This infonnation will be accessed by the program office PMS and by the 586th CBSS/GBMSCB in order to ascertain production status and GFM inventories.
2. Data will be submitted by the contractor daily lAW CAV II User's Guide, Version 6.0, and Appendix B for GFM contracts.
3. Training will be provided by 586 CBSS/GBMSCB.
4. This DD Form 1423-1 applies to both Contractor-Furnished Material (CFM) and Government Furnished Material (GFM) type contracts.
NOTE: DELIVERY ORDER REPORTING APPLIES.
Block 10:
a. Updates to the CAV II system shall be accomplished daily or when a supply or maintenance transaction occurs, lAW CAV II Contractor User's Guide, Version 6.0, and Appendix B for GFM contracts.
b. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized, lAW CAV II Contractor User's Guide, Version 6.0, and Appendix B for GFM contracts.
c. The contractor will use CAV II for reporting all end item/GFM transactions on day the specific action occurred. Weekends are exceptions. (NOTE: Certain actions such as receipts, inductions to work, production, shipments, issues, etc., require a transaction to be input to CAV II. However when there is no action it is not necessary to access the system.
Block 12: Date of first submission shall be within 24 hrs following a supply or maintenance transaction after the contract award date and government training as specified lAW CAV II User's Guide, Version 6.0, and Appendix B for GFM contracts.
Block 13: Same as remarks regarding Block 1° above.
15.TOTAL
G. PREPARED BY H.DATE I. APPROVED BY J.DATE
'., \'0 01-DEC-06
4' ,:
01-DEC-06
File details come from the government source that posted it. Updated .