DRAFT_RW_Section_M.docx

DOCX document 43 KB Posted

Attached to
Special Operation Forces Multiple Award Contract for Modifications Federal contract opportunity
Solicitation number
FA850919R0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Draft Rotary Section M

View the file

Other files for this federal contract opportunity

Other files attached to Special Operation Forces Multiple Award Contract for Modifications, newest first.
File Type Posted
Q_A_on_Final_RFP_Posted_02_May_19.pdf PDF
FA850919R0002_______0003.pdf PDF
Attachment_4.pdf PDF
Revised_Q_A_on_Final_RFP_through_22_Apr_19.pdf PDF
Q_A_on_Final_RFP_through_22_Apr_19.pdf PDF
FA850919R0002_______0002.pdf PDF
Attachment_8.pdf PDF
Attachment_7.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_10.pdf PDF
FA850919R0002_______0001.pdf PDF
Q&A_on_Final_RFP.pdf PDF
Attachment_7.pdf PDF
Attachment_11.pdf PDF
FA850919R0002.pdf PDF
Attachment_3.pdf PDF
Attachment_7.pdf PDF
Attachment_5.pdf PDF
Attachment_8.pdf PDF
Attachment_6.pdf PDF
Attachment_9.pdf PDF
Attachment_1.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Draft_RFP_Industry_Questions_Rev_1_28_Feb_2019.pdf PDF
Draft_RFP_Industry_Questions_Posted_23_JAN_2019.pdf PDF
Pre-solicitation_Conference_Attendees.pdf PDF
Class_Deviation_2018-O0006_Evaluation_Factors_for_Certain_Multiple_Award....pdf PDF
MACM_IDIQ_L.900_-_Section_L_Draft.doc DOC document
Pre-Solicitation_Conference_Q&A.pdf PDF
Draft_CLIN_Structure.pdf PDF
FW_MACM_IDIQ_Sample_Task_Draft.docx DOCX document
MACM_IDIQ_M.900_-_Section_M_Draft.doc DOC document
RW_MACM_IDIQ_Final_Sample_Task_Draft.docx DOCX document
SOW_MACM_IDIQ_Contract_Draft_(17_Dec_2018).pdf PDF
Draft_Clauses_and_Provisions.pdf PDF
DRAFT_-_MACM_IDIQ_Rotary_Sample_Task.docx DOCX document
DRAFT_FW_Section_L.docx DOCX document
DRAFT_FW_Section_M.docx DOCX document
DRAFT_-_MACM_IDIQ_Fixed_Wing_Sample_Task.docx DOCX document
DRAFT_RW_Section_L.docx DOCX document
Draft_Statement_of_Work_23_Oct_2017.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY (FOUO) - SOURCE SELECTION INFORMATION - See FAR 2.101 AND 3.104

MACM Rotary Wing Section M HH-60G Beyond Line of Sight (BLOS) Data Link

1. General: Each offeror's written technical proposal shall be evaluated, based on the Subfactors below, to determine if the offeror provides a sound, compliant approach that meets the requirements of the HH-60G Beyond Line of Sight (BLOS) Data Link Sample Task and demonstrates a thorough knowledge and understanding of those requirements. The technical proposal addresses each of the following Subfactors in sufficient detail.

Subfactor One, Technical Approach/Solution.

This subfactor is met when the offeror's proposal provides an adequately detailed narrative and supporting documentation that comprehensively illustrates the offeror’s sound, thorough understanding of, visible approach to, and current and planned capability for the following:

1. Engineering Analysis to produce the Technical “Design Output” associated with the proposed technical solution that utilizes the seven (7) factors listed in “Table 1: Technical Factors” Table 1: Technical Factors

Technical Element
Unit
MACM SOW Reference
Sample Task Reference
Min Threshold Value
Max Threshold Value
Objective Value
DESIGN OUTPUT
1
Link Budget
3.9
3.9
6 db

margin

N/A
10 db margin
3.9
2
Structural Analysis
3.9
3.6
Addresses the four elements
N/A
Same as Threshold
3.9
3
Time to receive 20 Mb data package over BLOS
3.9
2.0
120
N/A
20 seconds
3.9
4
BLOS Compatible w/Mil Satellites
3.9
2.0
Compatibility with all waveforms
N/A
Same as Threshold
3.9
5
Co-Site Analysis
3.9
3.1.1, 3.15
Identifies All potential issues
N/A
Same as Threshold
3.9
6
LOS Live Video Data Rate
3.9
2.1
500
N/A
16000
3.9
7
LOS in Range for at least 3min
3.9
2.1
3
N/A
5
3.9

2. A detailed narrative of the proposed technical solution to include, but not limited to:

a. Overall Design: Assumptions, engineering approaches/methodologies used, tradeoffs considered, modeling information, and hand calculations (MACM SOW 3.9.1, 3.10, 3.12, 3.13) (HH-60G BLOS Data Link Sample Task 2.0, 3.1, 3.1.1, 3.10, 3.16, 3.17, 3.20);

b. Engineering analysis required to produce each proposed “Design Output” for Table 1;

c. Component/Material selection (HH-60G BLOS Data Link Sample Task 2.4, 3.1, 3.8);

d. Cyber Assessment (MACM SOW 3.8) (HH-60G BLOS Data Link Sample Task 3.22);

e. Technical Risk Assessment (MACM SOW 3.29);

f. Installation Plan (MACM SOW 3.9.6-3.9.8, 3.25)(HH-60G BLOS Data Link Sample Task 3.18);

g. Technical Data Development (MACM SOW 3.9.1)(HH-60G BLOS Data Link Sample Task 3.19);

h. Configuration Control (MACM SOW 3.18, 3.19, 3.9.2, 3.9.10.9)(HH-60G BLOS Data Link Sample Task 2.2), and;

i. Provisioning (MACM SOW 3.26.5)(HH-60G BLOS Data Link Sample Task 3.21)

j. Joint Interoperability Test Command (MACM SOW 3.16)(HH-60G BLOS Data Link Sample Task 4.1.2) Subfactor Two, Airworthiness.

This Subfactor is met when the offeror's proposal provides an adequately detailed narrative and supporting documentation that comprehensively illustrates the offeror’s sound, thorough understanding of, visible approach to, and current and planned capability for the following:

1. Identification of Modification Airworthiness Certification Criteria (MACC) Sections affected (MACM SOW 3.9.4)(HH-60G BLOS Data Link Sample Task 3.16) Table 2: Airworthiness

MACC Section
Affected (Yes/No)

Section 4: Systems Engineering

Section 5: Structures

Section 6: Flight technology

Section 7: Propulsion & Propulsion Inst'l

Section 8: Air Vehicle Subsystems

Section 9: Crew Systems

Section 10: Diagnostic Systems

Section 11: Avionics

Section 12: Electrical Systems

Section 13: Electromagnetic Environ Effects

Section 14: System Safety

Section 15: Computer Systems & Software

Section 16: Maintenance

Section 17: Armament /Stores Integration

Section 18: Passenger Safety

Section 19: Materials

Section 20: Air Transportability, etc.

2. The detailed narrative shall include rationale for Airworthiness selections and the criteria used in assessing each individual MACC Section’s affectability rating (MACM SOW 3.9.4)(HH-60G BLOS Data Link Sample Task 3.16) Subfactor Three, Aircraft Modification Expertise.

This Subfactor is met when the proposal includes a detailed narrative, along with supporting documentation that illustrates the offeror’s understanding of, approach to, and current and planned capability for the following:

1. Within your technical experience as a prime contractor who either performed the work or managed subcontractors that performed the work, illustrate expertise, capabilities, and capacities relative to any requirements/engineering services specified in the DRAFT SOW within the past 10 years that demonstrates aircraft modifications that in summation included at least three (3) of the four (4) following elements:

a. Design – Developing the technical approach, drawings, and data utilizing set requirements to produce an operationally effective capability. (MACM SOW 3.9.1, 3.10, 3.12, 3.13)( HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.16, 3.20);

b. Integration – Implementing a design within the existing framework of the overall system and existing sub-systems. (MACM SOW 3.9.2, 3.10, 3.11)( HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.10, 3.16, 3.22.1);

c. Installation – The act of implementing a technical design on a designated system in the form of a modification trial kit, kit proof, and production manufactured kits. (MACM SOW 3.9.6-3.9.8, 3.11, 3.30)( HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.10, 3.16, 3.22.1), or;

d. Test – Measure the overall ability of a modification, in a lead or supporting role, utilizing ground procedures, operational checkout, and/or aircraft flights via a Test and Evaluation Master Plan (TEMP) or similar plans. (MACM SOW 3.9.6, 3.9.9)(HH-60G BLOS Data Link Sample Task 4.1.1-4.3)

2. To support the expertise related to Subfactor three, number one, supporting documentation shall include, but is not limited to:

a. contract numbers;

b. test procedures/reports;

c. period of performance;

d. agency/organization supported;

e. individual point of contact (Contracting Officer or Program Manager);

f. Brief description of the work performed (e.g., performance based work statements, statement of work, statement of objectives, contractual engineering task; SEP; TEMP);

g. Weapon system;

h. Government Customer or requirements holder;

i. Applicable Government testing agencies interaction (where applicable);

j. Program name, and;

k. Describe your company's capabilities and experience in generating technical data (i.e., CAD/hand-sketched drawings, installation plan etc.) and engineering drawings/product level TDPs. Identify what software programs are utilized to generate these data products and what formats are available for delivered items.

NOTE: This Subfactor is for verification of expertise purposes only.

2. Technical Rating: The technical rating reflects the evaluation of the acceptability of the offeror’s technical approach for meeting the Government's requirement. The offeror’s proposal shall be evaluated to determine whether the proposal is acceptable or unacceptable, using the ratings and descriptions outlined in the table below. The technical evaluation will also consider risk in determining overall acceptability. Risk pertains to the potential for unsuccessful contract performance. Risk will not receive a separate rating; rather, it will be inherent within the Subfactors. One technical rating will be assigned to each technical Subfactor. In order to be considered awardable, there must be an "acceptable"' rating in every Subfactor.

Technical Acceptable/Unacceptable Ratings:

Adjectival Rating
Description
Acceptable
Proposal meets the requirements of the solicitation.
Unacceptable
Proposal does not meet the requirements of the solicitation.

FOR OFFICIAL USE ONLY (FOUO) – SOURCE SELECTION INFORMATION – See FAR 2.101 and 3.104

File details come from the government source that posted it.