DRAFT_RW_Section_L.docx

DOCX document 37 KB Posted

Attached to
Special Operation Forces Multiple Award Contract for Modifications Federal contract opportunity
Solicitation number
FA850919R0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Draft Rotary Section L

View the file

Other files for this federal contract opportunity

Other files attached to Special Operation Forces Multiple Award Contract for Modifications, newest first.
File Type Posted
Q_A_on_Final_RFP_Posted_02_May_19.pdf PDF
Attachment_4.pdf PDF
FA850919R0002_______0003.pdf PDF
Revised_Q_A_on_Final_RFP_through_22_Apr_19.pdf PDF
Q_A_on_Final_RFP_through_22_Apr_19.pdf PDF
Attachment_7.pdf PDF
Attachment_8.pdf PDF
FA850919R0002_______0002.pdf PDF
Attachment_11.pdf PDF
Attachment_7.pdf PDF
FA850919R0002_______0001.pdf PDF
Q&A_on_Final_RFP.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_10.pdf PDF
Attachment_1.pdf PDF
Attachment_4.pdf PDF
Attachment_2.pdf PDF
Attachment_8.pdf PDF
Attachment_6.pdf PDF
Attachment_9.pdf PDF
Attachment_5.pdf PDF
FA850919R0002.pdf PDF
Attachment_3.pdf PDF
Attachment_7.pdf PDF
Draft_RFP_Industry_Questions_Rev_1_28_Feb_2019.pdf PDF
Draft_RFP_Industry_Questions_Posted_23_JAN_2019.pdf PDF
Pre-solicitation_Conference_Attendees.pdf PDF
Class_Deviation_2018-O0006_Evaluation_Factors_for_Certain_Multiple_Award....pdf PDF
SOW_MACM_IDIQ_Contract_Draft_(17_Dec_2018).pdf PDF
Draft_Clauses_and_Provisions.pdf PDF
RW_MACM_IDIQ_Final_Sample_Task_Draft.docx DOCX document
MACM_IDIQ_L.900_-_Section_L_Draft.doc DOC document
Pre-Solicitation_Conference_Q&A.pdf PDF
Draft_CLIN_Structure.pdf PDF
FW_MACM_IDIQ_Sample_Task_Draft.docx DOCX document
MACM_IDIQ_M.900_-_Section_M_Draft.doc DOC document
Draft_Statement_of_Work_23_Oct_2017.pdf PDF
DRAFT_FW_Section_M.docx DOCX document
DRAFT_-_MACM_IDIQ_Fixed_Wing_Sample_Task.docx DOCX document
DRAFT_RW_Section_M.docx DOCX document
DRAFT_FW_Section_L.docx DOCX document
DRAFT_-_MACM_IDIQ_Rotary_Sample_Task.docx DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY (FOUO) - SOURCE SELECTION INFORMATION - See FAR 2.101 AND 3.104

MACM Rotary Wing Section L HH-60G Beyond Line of Sight (BLOS) Data Link

1. General: The written technical proposal be shall clear, concise, and include all the information required by this provision in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal.

2. Format and Specified Content: The following information shall be provided in the written technical proposal and will be evaluated to assess the proposed technical approach in accordance with the Evaluation Basis for Award provision. The written technical proposal shall address each of the following Subfactors to describe the offeror's proposed approach to performing the requirements set forth below for each Subfactor and in RFP Attachment X and Sample Task for the HH-60G Beyond Line of Sight (BLOS) Data Link. Based on RFP Attachment XX, SOW for the HH-60G BLOS Data Link dated XX XXX 2018, as amended, the offeror shall provide a technical approach with supporting rationale and assumptions to meet the requirements of the sample task. Excluding those assumptions already identified in the sample tasks, the offeror shall identify their assumptions including any perceived omitted, conflicting, and/or incomplete information. The offeror shall not assume Government services or equipment are available unless otherwise stated in the sample task. It is understood that the offeror's proposal is based on the offeror's assumptions. For each Subfactor, the offeror shall identify any risks associated with the proposed approach to the sample task and actions to be taken to mitigate that risk. If no risks/mitigations are identified in the offeror's proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach.

Subfactor One, Technical Approach/Solution.

Using HH-60G BLOS Data Link Sample Task, the proposal shall include a detailed narrative approach, along with supporting documentation that illustrates the offeror’s understanding of, approach to, and current and planned capability for the following:

1. Engineering Analysis to produce the Technical “Design Output” associated with the proposed technical solution. Provide a response in the “Design Output” column utilizing the seven (7) factors listed in “Table 1: Technical Factors”.

Technical Element

Unit
MACM SOW Reference
Sample Task Reference
Min Threshold Value
Max Threshold Value
Objective Value
DESIGN OUTPUT
1
Link Budget
N/A
3.9
3.9
6 db margin
N/A
10 db margin
2
Structural Analysis
N/A
3.9
3.6
Addresses the four elements
N/A
Same as Threshold
3
Time to receive 20 Mb data package over BLOS
seconds
3.9
2.0
120
N/A
20 seconds
4
BLOS Compatible w/Mil Satellites
N/A
3.9
2.0
Compatibility with all waveforms
N/A
Same as Threshold
5
Co-Site Analysis
N/A
3.9
3.1.1, 3.15
Identifies All potential issues
N/A
Same as Threshold
6
LOS Live Video Data Rate
kb/s
3.9
2.1
500
N/A
16,000
7
LOS in Range for at least 3 min
minutes
3.9
2.1
3
N/A
5

Table 1: Technical Factors

2. The detailed narrative of the proposed technical solution shall include, but is not limited to:

a. Overall Design: Assumptions, engineering approaches/methodologies used, tradeoffs considered, modeling information, and hand calculations (MACM SOW 3.9.1, 3.10, 3.12, 3.13)(HH-60G BLOS Data Link Sample Task 2.0, 3.1, 3.1.1, 3.10, 3.16, 3.17, 3.20);

b. Engineering analysis required to produce each proposed “Design Output” for Table 1;

c. Component/Material selection (HH-60G BLOS Data Link Sample Task 2.4, 3.1, 3.8);

d. Cyber Assessment (MACM SOW 3.8)(HH-60G BLOS Data Link Sample Task 3.22)

e. Technical Risk Assessment (MACM SOW 3.29);

f. Installation Plan (MACM SOW 3.9.6-3.9.8, 3.25)(HH-60G BLOS Data Link Sample Task 3.18);

g. Technical Data Development (MACM SOW 3.9.1)(HH-60G BLOS Data Link Sample Task 3.19);

h. Configuration Control (MACM SOW 3.18, 3.19, 3.9.2, 3.9.10.9)(HH-60G BLOS Data Link Sample Task 2.2), and;

i. Provisioning (MACM SOW 3.26.5)(HH-60G BLOS Data Link Sample Task 3.21)

j. Joint Interoperability Test Command (MACM SOW 3.16)(HH-60G BLOS Data Link Sample Task 4.1.2) Subfactor Two, Airworthiness.

Using HH-60G BLOS Data Link Sample Task, the proposal shall include a detailed narrative approach, along with supporting documentation that illustrates the offeror’s understanding of, approach to, and current and planned capability for the following:

1. Identification of Modification Airworthiness Certification Criteria (MACC) Sections affected (MACM SOW 3.9.4)(HH-60G BLOS Data Link Sample Task 3.16)

MACC Section
Affected (Yes/No)

Section 4: Systems Engineering

Section 5: Structures

Section 6: Flight technology

Section 7: Propulsion & Propulsion Inst'l

Section 8: Air Vehicle Subsystems

Section 9: Crew Systems

Section 10: Diagnostic Systems

Section 11: Avionics

Section 12: Electrical Systems

Section 13: Electromagnetic Environ Effects

Section 14: System Safety

Section 15: Computer Systems & Software

Section 16: Maintenance

Section 17: Armament /Stores Integration

Section 18: Passenger Safety

Section 19: Materials

Section 20: Air Transportability, etc.

Table 2: Airworthiness

2. The detailed narrative shall include rationale for Airworthiness selections and the criteria used in assessing each individual MACC Section’s affectability rating (MACM SOW 3.9.1)(HH-60G BLOS Data Link Sample Task 3.19).

Subfactor Three, Aircraft Modification Expertise.

Using HH-60G BLOS Data Link Sample Task, the proposal shall include a detailed narrative, along with supporting documentation that illustrates the offeror’s understanding of, approach to, and current and planned capability for the following:

1. Within your technical experience as a prime contractor who either performed the work or managed subcontractors that performed the work, illustrate expertise, capabilities, and capacities relative to any requirements/engineering services specified in the Draft SOW within the past 10 years that demonstrates military aircraft modifications that in summation included at least three (3) of the four (4) following elements:

a. Design – Developing the technical approach, drawings, and data utilizing set requirements to produce an operationally effective capability. (MACM SOW 3.9.1, 3.10, 3.12, 3.13)(HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.16, 3.20);

b. Integration – Implementing a design within the existing framework of the overall system and existing sub-systems. (MACM SOW 3.9.2, 3.10, 3.11)(HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.10, 3.16, 3.22.1);

c. Installation – The act of implementing a technical design on a designated system in the form of a modification trial kit, kit proof, and production manufactured kits. (MACM SOW 3.9.2, 3.10, 3.11)(HH-60G BLOS Data Link Sample Task 2.0, 3.1.1, 3.10, 3.16, 3.22.1), or;

d. Test – Measure the overall ability of a modification, in a lead or supporting role, utilizing ground procedures, operational checkout, and/or aircraft flights via a Test and Evaluation Master Plan (TEMP) or similar plans. (MACM SOW 3.9.6, 3.9.9)(HH-60G BLOS Data Link Sample Task 4.1.1-4.3)

2. To support the expertise related to Subfactor three, number one, supporting documentation shall include, but is not limited to:

a. contract numbers;

b. test procedures/reports;

c. period of performance;

d. agency/organization supported;

e. individual point of contact (Contracting Officer or Program Manager);

f. Brief description of the work performed (e.g., performance based work statements, statement of work, statement of objectives, contractual engineering task; SEP; TEMP);

g. Weapon system;

h. Government Customer or requirements holder;

i. Applicable Government testing agencies interaction (where applicable);

j. Program name, and;

k. Describe your company's capabilities and experience in generating technical data (i.e., CAD/hand-sketched drawings, installation plan etc.) and engineering drawings/product level TDPs. Identify what software programs are utilized to generate these data products and what formats are available for delivered items.

FOR OFFICIAL USE ONLY (FOUO) – SOURCE SELECTION INFORMATION – See FAR 2.101 and 3.104

File details come from the government source that posted it.