Update_23_May_18.pdf
PDF 81 KB Posted
- Attached to
- Industry Day Notification for SOF/PR Multiple Award Contracts for Modifications IDIQ Effort
- Solicitation number
- FA850916R0008
About this file
Update to industry
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Copy_of_MILESTONE_CHART_SOF_PR_MACM_IDIQ_Revised_28_AUG_2018.xlsx | XLSX spreadsheet | |
| Post_Telecon_Minutes.pdf | ||
| Combined_Q&A_from_one-on-ones.docx | DOCX document | |
| SOF-PR_ _Rotary_Program_Industry_Day_Briefing_13_Jun_2016V1.pptx | PPTX presentation | |
| Attendee_List.pdf | ||
| IDIQ_Industry_Day_Request_20_May_2016.doc | DOC document | |
| PWS_LSC_13_May_16.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multiple Award Contract for Modifications Post-Teleconference Questions
Q1: There was discussion at the last Industry Day about the effort potentially being categorized as a small business set aside for NAICS code 541330. Has the size standard and NAICS been established or will that be finalized with the acquisition strategy approval.
A1: Only the NAICS code of 336411 (Aircraft Modifications) will be utilized.
Q2: Will you also be posting an industry attendance roster from the two telecons? It would be very helpful to be able to reach out to possible teaming partners.
A2: A copy of the attendance roster was provided with the minutes from the telephone conference and can be found on Page 2 of that document.
Q3: You indicated that SO/PR is still planned as a SB set aside as a Multi award IDIQ, can you tell us how many awardees there will be in the SB category?
A3: This effort will be entirely set-aside for small business. The Government anticipates awarding up to six contracts.
Q4: As we prepare our resources to respond can you tell us how many pages the response will be limited too?
A4: This will be specified in Section L – Instructions to Offerors upon release of the Draft and Final Solicitation.
Q5: How long is the response period once the final solicitation is released?
A5: This will be specified in the RFP when posted. In accordance with FAR 5.203(c), there will be at least a 30-day response time for receipt of proposals from the date of issuance.
Q6: From the documentation provided to date it appears the primary aircraft being supported are the C-130 and H-60 are there other airframes with which experience is beneficial?
A6: This will be specified in Sections L and M of the RFP document.
Q7: Are there any plans for an additional industry day to be held between the draft and final release beyond the teleconference already held in March 2018?
A7: No.
Q8: Do you know if there would be a CMMI certification required?
A8: The Government does not outline any Capability Maturity Model Integration (CMMI) requirements concerning software process maturity within the basic Statement of Work (SOW). Note, although a CMMI level is not specifically identified, it is expected that the processes follow ISO-STD-12207 as outlined within the SOW.