This is a Submittal Register form for federal contract FA850122D0003, documenting required submissions for the CCR RPR/RPL HVAC System, Bay A & Headhouse/Roof (Headhouse), B300 project. The form serves as a tracking mechanism for all contractor submittals throughout the project lifecycle, organized by construction specification sections (02 41 00 through 28 31 76) and submittal types.

The register details extensive submittal requirements across multiple categories including preconstruction submittals, shop drawings, product data, samples, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout submittals. Key specification sections include demolition and hazardous waste management (02 41 00-02 84 16), concrete and masonry work (03 30 53, 04 20 00), structural steel and miscellaneous metals (05 12 00-05 52 00), wood and plastic materials (06 41 16-06 61 16), waterproofing and roofing (07 01 50-07 92 00), doors, windows, and glazing (08 11 13-08 91 00), finishes (09 22 00-09 90 00), furnishings and signage (10 14 00-10 44 16), fire protection sprinklers (21 13 13), plumbing (22 00 00), HVAC systems (23 05 48-23 73 13), electrical systems (26 05 73-26 51 00), and fire alarm systems (28 31 76). The form includes columns for tracking submission dates, approval dates, material needed dates, and contractor action codes, establishing a comprehensive project documentation framework requiring contractor compliance with detailed specification requirements and government approval processes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 46 PAGES

FA850122D0003

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.6 GRecordkeeping

3.6 GException Report

3.7Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

02 81 00 3.5Waste Minimization

02 82 00 SD-03 Product Data

1.3.7 GSafety Data Sheets (SDS) for All

Materials

3.1.3 GLocal Exhaust Equipment

3.1.3 GPressure Differential Automatic

Recording Instrument

3.1.4 GVacuums

3.1.5 GGlovebags

SD-06 Test Reports

1.5.3 GPressure Differential Recordings

for Local Exhaust System

3.3.3.2 GAsbestos Disposal Quantity

Report

SD-07 Certificates

1.3.9 GLandfill Approval

1.3.9 GDelivery Tickets

1.3.9 GWaste Shipment Records

1.5.1 GWorker's License

1.5.2 GContractor's License

SD-11 Closeout Submittals

1.3.4 GPermits and Licenses

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.2.5 GLead, Cadmium, Chromium

Waste Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

02 83 00 1.5.4 GLicenses, Permits and

Notifications

SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

2.1 GMaterials and Equipment

3.1.1.5 GLocal Exhaust Equipment

3.1.1.5 GPressure Differential Automatic

Recording Instrument

SD-07 Certificates

3.1.1.1 GNotification of the

Commencement of LBP Hazard

Abatement

SD-11 Closeout Submittals

3.4.2.1 GHazardous Waste Manifest

3.4.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

02 84 16 3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

02 85 00 SD-01 Preconstruction Submittals

1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

02 85 00 3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 GIH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 30 53 SD-02 Shop Drawings

1.4 GInstallation Drawings

SD-03 Product Data

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

2.4.1Waterstops

2.3 GMix Design Data

2.3Ready-Mix Concrete

SD-06 Test Reports

2.1.3 GConcrete Mixture Proportions

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

2.2.2 GClay or Shale Brick

2.4.1.2 GCement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

04 20 00 2.4.1.1 GCementitious Materials

SD-04 Samples

2.2.3.1 GConcrete Masonry Units (CMU)

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.1Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

04 20 00 2.2.3.1.1 SRecycled Content

05 12 00 SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.2Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

05 12 00 3.7.1.1Certified Welding Inspector

3.4Welding Procedure Specifications

(WPS)

05 40 00 SD-03 Product Data

2.1 SRecycled Content of Steel

Products

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

3.2 GMasonry Anchorage Devices

2.1.2 GProtective Coating

2.2.3 GSteel Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 41 16.00 10 SD-02 Shop Drawings

1.5.2Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

06 41 16.00 10 2.9Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9.7.3Finish Schedule

1.5.3Certification

SD-04 Samples

2.3Plastic Laminates

2.5Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Fabrication Drawings

3.1 GInstallation

SD-03 Product Data

2.1.1 GSolid Polymer

2.2.2 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.4 GCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

06 61 16 2.1.1 SIndoor Air Quality for solid surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 GSolid Polymer

07 01 50 SD-03 Product Data

2.1.2 GSoil Pipe Extensions

2.1.1 GGalvanized Steel Plates

2.1.3 GRoof Drains

07 14 00 SD-03 Product Data

2.1Fluid-Applied Membrane

2.2Membrane Primer

3.1.1Elastomeric Sheet

3.3Solvent

3.4.1Moisture Meter

3.3.1Protection Board

2.6Bond Breaker

SD-11 Closeout Submittals

1.6Warranty

3.6Information Card

3.5Instructions To Government

Personnel

07 16 19 SD-04 Samples

1.4Metallic waterproofing

SD-06 Test Reports

1.3Iron content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

07 16 19 1.3Oxidizing agent content

SD-08 Manufacturer’s Instructions

3.3Mixing

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

1.4 GProtection Board or Coatings

2.3 GAccessories

2.1.5 GRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 GBlock or Board Insulation

2.2 GProtection Board or Coating

3.4.4 GProtection Board or Coating

1.7 GSpecial Warranties

1.7 GSpecial Warranties

2.1.6 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.3.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.1.2 GRecycled Content for Insulation

Materials

2.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

07 21 16 SD-07 Certificates

2.1.4 GIndoor Air Quality for Insulation

Materials

2.3.1 GIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 54 19 SD-02 Shop Drawings

1.5.4 GRoof Plan

SD-03 Product Data

3.3.2 GPVC Roofing Membrane

2.1.3Bonding Adhesive

1.5.3Flashing

3.3.2.2Flashing

2.1.6Membrane Fasteners and Plates

2.1.9Roof Insulation

2.1.7Pre-Manufactured Accessories

3.7.1Water Cutoffs

2.1.1Information Card

SD-05 Design Data

1.3.2 GWind Uplift Resistance

SD-07 Certificates

1.5.1Qualification of Manufacturer

1.5.2Qualifications of Applicator

1.3.1Fire Resistance

2.1.1Minimum Polymer Thickness

2.1.5Minimum Polymer Thickness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

07 54 19 1.9 GSample

SD-08 Manufacturer’s Instructions

3.3 GApplication Method

2.1.5 GMembrane Flashing

3.4.2 GMembrane Flashing

3.3.4Perimeter Attachment

2.1.6.2Auxiliary Fasteners

2.1.7Pre-Manufactured Accessories

1.7 GCold Weather

SD-11 Closeout Submittals

1.9 GWarranty

2.1.1 GInformation Card

3.10 GInstructions to Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.11 GGutters

3.1.12 GDownspouts

3.1.18 GExpansion Joints

2.2.1 GGravel Stops and fascia

3.1.16 GSplash Pans

3.1.13 GFlashing for Roof Drains

3.1.9 GCounterflashing

2.2.7 GReglets

3.1.14 GScuppers

3.1.19 GCopings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

07 60 00 3.1.15 GConductor Heads

2.2.1 GEave Flashing

2.1 SRecycled Content

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

07 92 00 SD-07 Certificates

2.1.1 GIndoor Air Quality For Interior

Sealants

2.1.3 GIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 GIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

1.3 GDoors

1.3 GDoors

2.1.1 GDoors

2.1.1 GDoors

2.2 GFrames

2.2 GFrames

2.1Accessories

SD-03 Product Data

1.3 GDoors

2.1.1 GDoors

2.2 GFrames

2.2 GRecycled Content for Steel Frame

Product

2.1Accessories

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 14 00 2.1.2.1 GRecycled Content for Door Cores

2.2Accessories

2.3.7Water-resistant Sealer

1.5Warranty

2.1.3 GSound Transmission Class

Rating

2.1.4 GFire Resistance Rating

SD-04 Samples

2.1Doors

2.3.6.2 GDoor Finish Colors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.2 SCertified Sustainably Harvested

Flush Wood Doors

2.1.2.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 31 00 1.3.2 GHardware

2.2.8 GAccessories

2.1 GRecycled Content

SD-04 Samples

2.5 GFinishes

SD-06 Test Reports

1.3.1 GAcoustical Ratings of Assemblies

08 34 59 SD-02 Shop Drawings

2.1 GVault Door Unit

SD-03 Product Data

2.2Vault Door and Frame

SD-07 Certificates

2.2Vault Door and Frame

SD-08 Manufacturer’s Instructions

3.1Installation

08 34 73 SD-02 Shop Drawings

2.1Fabrication Drawings

SD-03 Product Data

2.1 GWood Sound Retardant Doors

2.1 GDoor Frames

2.1 GDoor Hardware

2.3.2Door Frame Sound Infill

2.1Intumescent Seals and Gasketing

2.1 GThresholds

SD-07 Certificates

2.1 GWood Sound Retardant Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 34 73 2.1 GDoor Frames

2.1Door Hardware

1.3.1.3Intumescent Seals,Gasketing and

Door Bottoms

2.1Thresholds

3.3.1Assembly Test Reports

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.7Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.1 GRecycled Content of Aluminum

Windows

2.2.7.1 GHardware

2.2.2 GFasteners

1.8 GWindow Performance

2.3 GThermal-Barrier Windows

2.4 GMullions

2.2.9 GScreens

2.1.5 GWeatherstripping

2.2.7 GAccessories

2.2.3Adhesives

1.8.4 GThermal Performance

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 51 13 1.3.3.3 GMock-Ups

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Minimum Condensation

Resistance Factor

SD-10 Operation and Maintenance

Data

2.1 GWindows

1.5Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.5 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 81 00 SD-03 Product Data

2.3Insulating Glass

1.3Glazing Accessories

2.4.3.1Sealants

SD-04 Samples

2.3Insulating Glass

3.2.7Plastic Sheet

2.4.2Glazing Compound

2.4.5Tape

2.4.5Sealing Tapes

SD-07 Certificates

2.3Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

1.7.2Warranty for Polycarbonate

Sheet

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

2.3Door Louvers

SD-04 Samples

1.5 GWall Louver Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

08 91 00 1.5 GDoor Louver Samples

09 22 00 SD-02 Shop Drawings

2.1 GMetal Support Systems

SD-03 Product Data

2.1Metal Support Systems

2.1 GRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.7Cementitious Backer Units

2.1.4Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.3Water-Resistant Gypsum Backing

Board

2.1.12Accessories

2.1.1Gypsum Board

2.1.1 GRecycled Content for Gypsum

Board

2.1.8 GVOC Content of Joint Compound

SD-06 Test Reports

2.1.6.1 GASTM E90 Factory Test Report

3.7 GASTM E90 Factory Test Report

3.10 GASTM E90 Factory Test Report

3.10 GASTM E336 Field Test Report

SD-07 Certificates

2.1 GAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 29 00 2.1.1 GIndoor Air Quality for Gypsum

Board

2.1.10 GIndoor Air Quality for Non-aerosol

Adhesives

2.1.10 GIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.1.1 GRecycled Content for Porcelain

Tile

2.1.2 GGlazed Ceramic Wall Tile

2.1.2 GRecycled Content for Glazed

Ceramic Wall Tile

2.1 GTransition Strips

2.6.1 GTransition Strips

2.6.2 GMetal Strips

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

2.5 GCementitious Backer Units

SD-04 Samples

2.1 GTile

2.1 GTransition Strips

2.6.1 GTransition Strips

2.6.2 GMetal Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 30 10 2.4.4 GGrout

SD-07 Certificates

2.4 GIndoor Air Quality for Adhesives

2.4.9 GIndoor Air Quality for Sealants

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

2.1.1 GPorcelain Tile

2.1.2 GGlazed Ceramic Wall Tile

2.1 GTransition Strips

2.6.1 GTransition Strips

2.6.2 GMetal Strips

09 51 00 SD-02 Shop Drawings

2.1Drawings

SD-03 Product Data

2.1Acoustical Ceiling

2.2.1.1 GRecycled Content for Type III

Ceiling Tiles

2.1.1Acoustical Performance

SD-04 Samples

2.2Acoustical Units

2.2.1.1Acoustical Ceiling Tiles

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 51 00 2.2.1.1 GIndoor Air Quality for Type III

Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.11 GResilient Flooring and

Accessories

SD-03 Product Data

2.11 GResilient Flooring and

Accessories

2.7Adhesives

SD-04 Samples

2.11 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 GIndoor Air Quality for Vinyl

Composition Tile

2.2 GIndoor Air Quality for Luxury Vinyl

Tile

2.3 GIndoor Air Quality for Solid Vinyl

Tile

2.4 GIndoor Air Quality for Wall Base

2.7 GIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 65 00 3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.11 GResilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1 GCarpet

2.1.1 GRecycled Content for Carpeting

2.4 GMoldings

2.3 GIndoor Air Quality for Aerosol

Adhesives

2.3 GIndoor Air Quality for Non-Aerosol

Adhesives

2.3 GIndoor Air Quality for Concrete

Primer

SD-04 Samples

2.1 GCarpet

2.4 GMoldings

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

2.1.2 GIndoor Air Quality for Carpet

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 68 00 SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.6Warranty

09 90 00 SD-02 Shop Drawings

3.8Piping Identification

SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

1.5.6 GTextured Wall Coating System

SD-07 Certificates

1.5.5.2 GQualification Testing

1.5.4Indoor Air Quality for Paints and

Primers

1.5.4Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

09 90 00 2.1 GCoatings

10 14 00.20 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SD-03 Product Data

2.1 GRoom Identification And

Directional Signage System

2.2 GStair Signage

2.3 GExit Door Tactile Sign

2.4 GBuilding Directories

2.5 GDoor Tags

SD-04 Samples

1.4.1 GInterior Signage

1.3 GSoftware

2.1 GRoom Identification And

Directional Signage System

2.2 GStair Signage

2.3 GExit Door Tactile Sign

2.4 GBuilding Directories

2.5 GDoor Tags

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 28 13 SD-02 Shop Drawings

2.1 GProduct Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

10 28 13 SD-03 Product Data

2.1 GRecycled content for stainless

steel toilet accessories

2.1.3 GItem A5080

2.1.4 GItem A5109

2.1.5 GItem A5145

2.1.6 GItem A5200

SD-10 Operation and Maintenance

Data

2.1.3 GItem A5080

2.1.4 GItem A5109

2.1.5 GItem A5145

2.1.6 GItem A5200

10 44 16 SD-02 Shop Drawings

2.1.1 GFire Extinguishers

Part 2Accessories

Part 2 GCabinets

2.2.2 GWall Brackets

1.5 GSchedule

SD-03 Product Data

2.1.1 GFire Extinguishers

Part 2Accessories

Part 2 GCabinets

2.2.2 GWall Brackets

3.2.1Replacement Parts List

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

10 44 16 1.3.1 GEquipment Samples

SD-07 Certificates

2.1.1 GFire Extinguishers Certifications

1.4 GManufacturer's Warranty with

Inspection Tag

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1.1 GPipe

2.2.1.2 GFittings

2.3 GSprinklers

2.2.3 GPipe Hangers and Supports

2.1.2 GNameplates

SD-05 Design Data

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.5.1 GTest Procedures

SD-07 Certificates

3.5.2.1 GVerification of Compliant

Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

21 13 13 3.5.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.7 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.7As-built drawings

22 00 00 SD-02 Shop Drawings

3.6.1 GPlumbing System

SD-03 Product Data

3.6.1.1 GBackflow Prevention Assemblies

2.4Fixtures

2.4.2Flush Valve Water Closets

2.4.2 SWaterSense Label for Flush

Valve Water Closet

2.4.3Flush Valve Urinals

2.4.3 SWaterSense Label for Urinal

2.4.5Wall Hung Lavatories

2.4.6Countertop Lavatories

2.4.7Kitchen Sinks

2.4.8Service Sinks

2.4.9 GDrinking-Water Coolers

2.4.9 SEnergy Star Label for Electric

Water Cooler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

22 00 00 2.4.10 SEnergy Star Label for Wheelchair

Electric Water Cooler

2.9 GPumps

3.1.2.10Welding

SD-06 Test Reports

3.6Tests, Flushing and Disinfection

3.6.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.6.1 GPlumbing System

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

1.2 GOutline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.12 GIsolators

SD-06 Test Reports

2.4 GType of Isolator

2.4 GType of Base

2.4 GAllowable Deflection

2.4 GMeasured Deflection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 05 93 SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

SD-06 Test Reports

3.3.4 GCompleted Pre-Final DALT

Report

3.3.7 GCertified Final DALT Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 07 00 2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2 GDraft As-Built Drawings

3.2 GFinal As-Built Drawings

SD-03 Product Data

2.2 GManufacturer's Product Data

SD-06 Test Reports

1.9.1 GPre-Construction Quality Control

(QC) Checklist

1.9.2 GPost-Construction Quality Control

(QC) Checklist

3.4.2 GStart-Up Testing Report

3.5.1 GPVT Procedures

3.5.3 GPVT Report

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 09 00 2.5 GEnclosure Keys

3.1.6.1 GPassword Summary Report

1.9.3 GCloseout Quality Control (QC)

Checklist

23 09 33.00 40 SD-01 Preconstruction Submittals

2.3 GMaterial, Equipment, and Fixture

Lists

1.5 GRecords of Existing Conditions

SD-02 Shop Drawings

2.2 GFabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.3 GControl Components

2.3 GDampers

2.3.2 GDampers

2.3 GOperators

2.3.3.1 GOperators

SD-04 Samples

2.4.10 GRoom Humidistats

SD-06 Test Reports

3.2 GSet Points and Final Adjustments

Of Controls

3.2 GTest Reports

SD-07 Certificates

1.3.1 GListing of Product Installations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 09 33.00 40 1.3.4 GQualified Permanent Service

Organizations

2.3.4.2 GManufacturer's Standard Factory

Finishing

SD-10 Operation and Maintenance

Data

3.3.3 GOperation and Maintenance

Manuals

3.3.1 GScheduled Instructional Services

2.3.1.1 GAir Supply Source

2.3.3.2 GElectric Operators

23 21 13.00 20 SD-02 Shop Drawings

1.3.1Hot water heating system

SD-03 Product Data

2.2.1Flow measuring equipment

2.1.1Hot water heating pipe

SD-06 Test Reports

3.3.1Hydrostatic test of piping system

3.3.2Auxiliary equipment and accessory tests

SD-07 Certificates

1.5.2.1Report of prior installations

1.5.2.2Welding procedures

1.5.2.3Welder's qualifications

23 30 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 30 00 SD-03 Product Data

2.9.1.1Metallic Flexible Duct

2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.9.1.2Duct Connectors

2.9.2 GDuct Access Doors

2.9.3Fire Dampers

2.9.4 GManual Balancing Dampers

2.9.7.1Diffusers

2.9.7.2Registers and Grilles

2.9.8Louvers

2.9.9Air Vents, Penthouses, and

Goosenecks

2.10.1.1Panel Type Power Wall

Ventilators

2.10.1.3Ceiling Exhaust Fans

2.10.1.3 SPL-109-58 label for ceiling

exhaust fan product

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GVariable Volume, Single Duct

Terminal Units

2.12.2.2 GReheat Units

2.13 GEnergy Recovery Devices

1.4.5Test Procedures

1.2.1.2 GDiagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 30 00 2.9.1 SIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.14.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.14.1 GOperation and Maintenance

Manuals

2.9.3 GFire Dampers

2.9.4 GManual Balancing Dampers

2.10.1.1 GPanel Type Power Wall

Ventilators

2.10.1.2 GCentrifugal Type Power Roof

Ventilators

2.10.1.3 GCeiling Exhaust Fans

2.11 GAir Handling Units

2.12.1 GRoom Fan-Coil Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 30 00 2.12.2.1 GVariable Volume, Single Duct

Terminal Units

2.12.2.2 GReheat Units

SD-11 Closeout Submittals

3.13 SIndoor Air Quality During

Construction

23 64 26 SD-03 Product Data

2.2.2.4 GGrooved Mechanical Connections

For Steel

2.6.3 GGrooved Mechanical Connections

For Copper

2.7.8 GCalibrated Balancing Valves

2.7.9 GAutomatic Flow Control Valves

2.7.10 GWater Temperature Mixing Valve

2.7.11 GWater Temperature Regulating

Valves

2.7.12Water Pressure Reducing Valve

2.7.13Pressure Relief Valve

2.7.14Combination Pressure and

Temperature Relief Valves

2.8.8 GExpansion Joints

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.5.2 GPressure Tests Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 64 26 3.1.1.1Employer's Record Documents

(For Welding)

3.1.1.2Welding Procedures and

Qualifications

2.4Piping for Steam and Condensate

2.5Piping for High-Pressure

Compressed-Air Systems

2.4Fittings

2.5Fittings

2.4Unions

2.5Unions

2.4Flanges

2.5Flanges

2.4Gaskets

2.5Gaskets

2.4Bolting

2.5Bolting

SD-08 Manufacturer’s Instructions

3.6 GLesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

2.7.8 GCalibrated Balancing Valves

2.7.9 GAutomatic Flow Control Valves

2.7.10 GWater Temperature Mixing Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 64 26 2.7.11 GWater Temperature Regulating

Valves

2.7.12 GWater Pressure Reducing Valve

2.7.13 GPressure Relief Valve

2.7.14 GCombination Pressure and

Temperature Relief Valves

2.8.8 GExpansion Joints

23 73 13.00 40 SD-02 Shop Drawings

3.2 GInstallation Drawings

2.1 GFabrication and Connection

Drawings

SD-03 Product Data

2.1 GEquipment and Performance

Data

1.3.2 GSample Warranty

2.2.7.4 GAir Filter Gauges

3.3.3 GFinal Test Reports

SD-07 Certificates

1.3List of Product Installations

1.3.1 GCertificates of Conformance

2.2.2Unit Cabinet

2.2.3Fan

2.2.4Drain Pans

2.2.5Insulation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

23 73 13.00 40 3.4.1Operation and Maintenance

Manuals

SD-11 Closeout Submittals

1.5Warranty

25 08 10 SD-06 Test Reports

3.1.1 GPVT Plan

3.1.2.1 GPVT Phase I Report

3.1.2.2 GPVT Phase II Report

SD-07 Certificates

1.4 GTest Instrumentation Calibration

Certificates

25 10 10 SD-02 Shop Drawings

3.2.2 GUMCS Contractor Design

Drawings

3.2.3 GDraft As-Built Drawings

3.2.3 GFinal As-Built Drawings

SD-03 Product Data

2.1.5 GProduct Data Sheets

2.4 GComputer Software

2.6.1 GEnclosure Keys

SD-05 Design Data

3.2.1 GUMCS IP Network Bandwidth

Usage Estimate

SD-06 Test Reports

1.6 GPre-Construction QC Checklist

1.6 GPost-Construction QC Checklist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 46 PAGES

CCR RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300

25 10 10 3.1 GExisting Conditions Report

3.6 GStart-Up and Start-Up Testing

Report

3.7.1 GPVT Phase I Procedures

3.7.2 GPVT Phase I Report

3.7.3 GPVT Phase II Report

SD-10 Operation and Maintenance

Data

1.7 GOperation and Maintenance

(O&M) Instructions

3.8.8.1 GPreventive Maintenance Work

Plan

3.9.1 GBasic Training Documentation

3.9.1 GAdvanced Training

Documentation

3.9.1 GRefresher…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .