This is a Hazardous Materials (HAZMAT) Report documenting the results of asbestos-containing material (ACM) and lead-containing paint (LCP) surveys conducted at Building 300, Robins Air Force Base, Georgia in March 2023. The survey was performed by Applied Technical Services (ATS), formerly PENTA Engineering Group, to identify ACM and LCP that may be disturbed during planned HVAC system replacement and renovation activities in the Head House, Bay A, and Bay A Annex areas.

The asbestos survey identified multiple ACM materials requiring abatement prior to renovation work. Documented ACM includes black mastic under carpet (estimated 101,800 square feet in Basement East), tan 9x9 inch floor tiles with black mastic on the 2nd and 1st floors, 12x12 inch layered floor tiles with black mastic in Bay A hallways, and silver roof coating on approximately 950 square feet of rooftop mechanical equipment. Additional presumed ACM materials include corrugated siding (540 square feet), exterior window caulking at 109 windows, black tar on exterior flashing (32 square feet), black sealant on exterior vent louvers (165 linear feet), and built-up roofing on Head House roofs (50,000 square feet). The lead-containing paint survey identified lead in 37 of 40 paint chip samples collected, with lead detected on fire sprinkler piping, door frames, window trim, ceiling surfaces, structural steel, and other building components throughout the Head House and Bay A areas. All painted surfaces except brown vault doors, beige wood paneling, and cream plaster ceilings in specified locations should be presumed to contain lead. The report recommends that all identified ACM be removed by a Georgia-licensed asbestos abatement contractor prior to renovation work, and that only OSHA-trained contractors perform work disturbing lead-containing paint in compliance with 29 CFR 1926.62.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CF-IFC Design Analysis Repair/Replace HVAC System, Bay A & Headhouse / Roof B300

Robins Air Force Base, Robins, GA

ZAPATA Contract No.: FA850122D0003 November 2024 Delivery Order No.: FA850123F0119 Project No.: UHHZ99-0029

HAZMAT REPORT

CF-IFC Design Analysis Repair/Replace HVAC System, Bay A & Headhouse / Roof B300

Robins Air Force Base, Robins, GA

ZAPATA Contract No.: FA850122D0003 November 2024 Delivery Order No.: FA850123F0119 Project No.: UHHZ99-0029

THIS PAGE INTENTIONALLY LEFT BLANK

APPLIED TECHNICAL SERVICES

www.atslab.com 4000 Miller Court West • Norcross, GA 30071 • 678-282-1999 ATS Project No. NV397865

Professional Engineers and Scientists: Design • Consulting • Testing • Inspection

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

SUMMARY OF

ASBESTOS-CONTAINING MATERIAL AND LEAD-CONTAINING

PAINT SURVEY

LOCATED AT:

Building 300 Robins Air Force Base, Georgia

ATS Building No. 13398

Geosyntec Consultants, Inc.

Taylor Payne 1255 Roberts Boulevard

Suite 200 Kennesaw, GA 30144

TPayne@Geosyntec.com

(678) 718-4760

APRIL 19, 2023

PREPARED BY: STEPHEN K. KIMBLE

CONSULTING MANAGER – ENVIRONMENTAL SERVICES

REVIEWED BY: HUNTER R PIERCE

OPERATIONS MANAGER - ENVIRONMENTAL SERVICES

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

PENTA Engineering Group, LLC (PENTA) was a fully-owned, independently operating subsidiary of Applied Technical Services, LLC (ATS) upon initiation of the work of this contract and has since merged with ATS on April 1, 2023. PENTA Project No. 23-5-10828 was transitioned to ATS Project No. NV397865. ATS is pleased to submit this report for the limited asbestos-containing material (ACM) and lead-containing paint (LCP) survey performed in Building B300 at Robins Air Force Base, Georgia. The survey was limited to interior and exterior areas of the above referenced building, and to those suspect materials that may potentially be disturbed as part of a scheduled renovation project at Robins Air Force Base, Georgia. Our services were performed in general accordance with the Subcontractor Services Agreement between PENTA and Geosyntec Consultants, Inc. (Geosyntec) and PENTA Proposal No. P22-5-13498, authorized under Subcontract Work Order No. 100045986.

The purpose of our service was to identify locations and approximate quantities of ACM and LCP that may potentially be disturbed during renovations associated with replacement of heating, ventilation, and air conditioning (HVAC) systems and other renovations of the subject facility.

PENTA is pleased to have provided this service to Geosyntec and Robins Air Force Base. Should you have any questions or comments concerning this report, or if we can be of further assistance, please contact us.

ATTACHMENTS:

Asbestos-Containing Material and Lead-Containing Paint Survey Report Table 1 – Summary of PLM Analysis Results Table 2 – Summary of Paint Chip Analysis Attachment 1 – Asbestos and Lead Survey Photographs Attachment 2 – Laboratory Data Sheets and Chain-of-Custody Forms (ACM) Attachment 3 – Laboratory Data Sheet and Chain-of-Custody Form (LCP) Attachment 4 – Sample Location Drawings Attachment 5 – Inspector Accreditations

Asbestos-Containing Material and Lead-Containing Paint Survey Report

1.0 BACKGROUND

It is our understanding that future plans for the subject facility include substantial interior and exterior renovations within the Head House, Bay A and Bay A Annex areas associated with Building 300 at RAFB. A limited prior asbestos survey was completed, by Geotechnical & Environmental Consultants, Inc. (GEC) in a report dated July 7, 2021 (GEC Project No.

HN217342). The GEC asbestos survey was limited to flooring materials and indicated the presence of asbestos-containing floor tile and associated mastic in several areas within the planned renovation area. ATS was subcontracted to review the prior survey data and perform a supplemental asbestos-containing material (ACM) and lead-containing paint (LCP) survey associated with the above referenced areas of Building 300 potentially impacted by the project.

This report summarizes the survey results.

2.0 ASBESTOS SURVEY

2.1 Regulatory Overview

The U.S. Environmental Protection Agency’s (EPA’s) Asbestos National Environmental Standards for Hazardous Air Pollutants (NESHAPs) regulation (40 CFR 61.145) requires that a facility scheduled for demolition or renovation be “thoroughly inspected” for the presence of ACM prior to demolition or renovation efforts.

In addition, the Occupational Health and Safety Administration (OSHA) Asbestos in Construction Standard (29 CFR 1926.1101) requires that a building or facility owner determine the presence, location, and quantity of ACM or Presumed Asbestos-Containing Material (PACM) at the work site.

Owners may rebut the presumption of the presence of asbestos in materials by having a completed inspection conducted pursuant to the requirements of EPA’s Asbestos Hazard Emergency Response Act (AHERA). OSHA further requires that samples of suspect ACM be collected by an accredited inspector and analyzed by a laboratory with proficiency demonstrated by current successful participation in a nationally recognized testing program such as the National Voluntary Laboratory Accreditation Program (NVLAP) to rebut the assumption of the presence of asbestos.

EPA’s AHERA regulations (40 CFR Part 763, Subpart E) require that suspect ACM be sampled by homogeneous area, and separates suspect ACM into three categories [i.e., surfacing material, thermal systems insulation (TSI), and miscellaneous material]. Key definitions are provided below.

• Homogeneous Area/Material: an area of surfacing material, thermal system insulation material, or miscellaneous material that is uniform in color and texture.

o Multiple samples must be collected of each homogeneous area or material (referred to as Assay Number)

• Surfacing Material: material in a building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

o An accredited inspector must collect, in a statistically random manner that is representative of the homogeneous area, bulk samples from each homogeneous area

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

of friable surfacing material that is not assumed to be ACM and shall collect the samples as follows:

At least three bulk samples from each homogeneous area that is 1,000 square feet or less.

At least five bulk samples from each homogeneous area that is greater than 1,000 square feet but less than or equal to 5,000 square feet.

At least seven bulk samples from each homogeneous area that is greater than 5,000 square feet.

• Thermal Systems Insulation (TSI): material in a building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

o An accredited inspector must collect, in a randomly distributed manner, at least three bulk samples from each homogeneous area of TSI that is not assumed to be ACM.

Bulk samples are not required to be collected from any homogeneous area where the accredited inspector has determined that the TSI is fiberglass, foam glass, rubber, or other non-asbestos-containing building material.

• Miscellaneous Material: interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal systems insulation.

o In a manner sufficient to determine whether material is ACM or not ACM, an accredited inspector shall collect bulk samples from each homogeneous area of friable miscellaneous material that is not assumed to be ACM.

• Nonfriable Suspected Asbestos-Containing Building Material (ACBM): If any homogeneous area of nonfriable suspected ACBM is not assumed to be ACM, then an accredited inspector shall collect, in a manner sufficient to determine whether the material is ACM or not ACM, bulk samples from the homogeneous area of nonfriable ACBM.

The EPA has published guidelines and recommendations regarding inspection and sampling for both friable and non-friable ACM. These guidelines were adhered to during the building surveys, as appropriate. Friable materials are those that can be pulverized or reduced to powder by moderate pressure, such as spray-applied fireproofing and acoustical materials, acoustical ceiling tiles, and most thermal system insulation. Non-friable materials are those that cannot be crumbled easily, such as most roofing materials, resilient floor tiles or cement-asbestos ("Transite") board. Although emphasis was on detecting friable materials, the possible presence of non-friable ACM was also considered; during any demolition or renovation activities, nonfriable materials may be pulverized or otherwise damaged so as to release asbestos fibers into the air.

2.2 Review of prior asbestos survey data

The GEC Asbestos Floor Tile Assessment Survey Report indicated the presence of asbestos in the following materials:

• 9x9 tan floor tile

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

• Layered floor tile – brown floor tile

• Black mastic

• 9x9 tan floor tile – black mastic

• Layered floor tile – black mastic

The report did not quantify the materials. Copies of their field notes and sample location drawings indicated ACM flooring materials were present in the following areas:

• Basement West – generally throughout

• Basement East – generally throughout, except in the Conference Room, restrooms, and certain mechanical/storage areas. Also present beneath raised computer flooring in the Secure Area.

• First Floor – East, Middle, and West – generally throughout except east and west entry stairwells, restrooms, and certain mechanical/storage areas.

• Second Floor – East, Middle, and West – generally throughout except east and west entry stairwells, restrooms, and certain mechanical/storage areas.

ATS performed supplemental observations and limited additional sampling of suspect asbestos-containing flooring materials to further delineate the presence of ACM flooring materials. Where feasible, ATS relied on prior sampling results that were positive for the presence of asbestos and material descriptions appeared to match existing conditions during our survey efforts.

2.3 Overview of Asbestos Survey Field Services

From 6 to 8 March 2023, Stephen Kimble, an accredited AHERA building inspector with PENTA (ATS), visited Building 300 to perform the survey with assistance by Luke Dieffenbauch and James Wolfe of PENTA. The survey began with a walkthrough of the areas to be renovated in the subject facility to identify suspect ACM. Sample areas were typically grouped based on material homogeneity. Once sampling areas were identified and recorded, representative samples of suspect materials were collected. A total of 103 bulk samples of suspect ACM were collected in a manner to comply with the minimum sampling requirements outlined in Section 2.1. Due to field time constraints, not all observed suspect asbestos-containing materials were sampled during these field efforts. Suspect ACMs not sampled are listed below as “presumed asbestos-containing materials” and should be treated as ACM until they are sampled and analyzed by an accredited laboratory to determine asbestos content. The suspect ACM observed and sampled (or presumed) included the following materials:

Building 300

• Surfacing Materials: [3 Samples]:

o White ceiling/wall plaster [3 samples] – HM# 18.

• TSI: [18 Samples]:

o White mastic over paper and yellow fiberglass insulation [3 samples] – HM# 6 o Yellow fiberglass insulation [3 samples] – HM# 7 o Tan canvas pipe insulation on chilled water piping [3 samples] – HM# 13 o Duct insulation, tan canvas with white mastic over yellow insulation [3 samples] – HM# o White mastic over yellow pipe insulation on chilled water piping [3 samples] – HM# 15

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

o Tan canvas wrap over black foamglass pipe insulation [3 samples] – HM# 46

• Miscellaneous Materials [82 Samples]:

o Pedestal mastic [2 samples] – HM# 1 o Blue 4-inch cove base with cream mastic [2 samples] – HM# 2 o Gray duct seam mastic [2 samples] – HM# 3 o Tan square pattern resilient sheet flooring (RSF) [2 samples] – HM# 4 o Gray sink undercoating [2 samples] – HM# 5 o White duct seam mastic [2 samples] – HM# 8 o Dark brown duct seam mastic [2 samples] – HM# 9 o Woven fabric vibration isolation dampener with dark brown duct seam mastic [2 samples] – HM# 10 o Drywall joint compound [6 samples] – HM# 11 o Black cove base with dark brown mastic [2 samples] – HM# 12 o Gray cove base with yellow/brown mastic [2 samples] – HM# 16 o 2’ by 2’ white smooth ceiling tile [2 samples] – HM# 17 o Plum cove base with tan brown adhesive [2 samples] – HM# 19 o 2’ by 2’ pindot with small fissure ceiling tile [2 samples] – HM# 20 o 12” by 12” dark gray with white streaks floor tile/yellow adhesive [2 samples] – HM# o 1’ by 1’ ceiling tile, pindot, white with brown glue dots [2 samples] – HM# 22 o Dark blue cove base with tan adhesive [2 samples] – HM# 24 o Black tar roofing material [2 samples] – HM# 25 o Silver roof coating [2 samples] – HM# 26 o Black flashing material [2 samples] – HM# 27 o Gray/black tar roofing material [2 samples] – HM# 28 o White door frame caulk [2 samples] – HM# 29 o Olive duct seam mastic [2 samples] – HM# 30 o Black waterproofing mastic [2 samples] – HM# 31 o Black cove base with brown adhesive [2 samples] – HM# 32 o Outer column to CMU seam caulk, tan [2 samples] – HM# 33 o Black floor mastic with yellow carpet glue [2 samples] – HM# 34 o 4’ by 2’ white pindot ceiling tile [2 samples] – HM# 35 o 12” by 12” floor tile, tan with brown streaks, with black mastic [2 samples] – HM# 36 o Dark brown molasses duct seam mastic [2 samples] - HM# 37 o 2’ by 2’ four square pattern ceiling tile [2 samples] - HM# 38 o Dark gray cove base with tan adhesive [2 samples] – HM# 39 o Brown pedestal mastic [2 samples] – HM# 40 o White mastic over yellow fiberglass duct insulation [2 samples] – HM# 41 o 12” by 12” layered floor tile over black mastic [2 samples] – HM# 42 o 12” by 12” light blue floor tile with white/gray streaks and clear adhesive [2 samples] –

HM# 43

o 12” by 12” white ceiling tile with dark brown glue dots [2 samples] – HM# 44 o 12” by 12” gray floor tile with gray and white streaks and clear adhesive [2 samples] –

HM# 45

o Gold resilient sheet flooring (RSF) over black mastic beneath carpet [2 samples] –

HM# 47

o Corrugated siding – PRESUMED ACM

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

o Exterior caulking at window/brick interface – PRESUMED ACM o Black tar on exterior flashing at West Wing entrance – PRESUMED ACM o Black sealant on exterior walls – PRESUMED ACM

Refer to Attachment 1 of this report for representative photographs of suspect ACM sampled and/or presumed.

Bulk samples of suspect ACM were shipped to Scientific Analytical Institute, Inc. (SAI) in Greensboro, North Carolina and were analyzed for asbestos content. Analysis was performed by Polarized Light Microscopy (PLM) coupled with dispersion staining, in general accordance with EPA Method 600/R-93/116 and 600/M4-82-020. Samples of each homogeneous material were analyzed on a first-positive stop basis. If one sample of a homogeneous material contained asbestos, the remaining samples were presumed to contain asbestos. Copies of the laboratory analysis data sheets and Chain-of-Custody are attached to this report as Attachment 2.

2.4 Summary of Analytical Results

Asbestos was documented in the following materials during this and prior survey efforts:

Material Sample Numbers Locations Estimated Quantity

Black mastic under carpet (prior survey data)

300-2A Basement East

101,800 sf Includes areas of exposed black mastic, floor tile/multi-layered floor tile over mastic, and carpet over floor tile and/or mastic

Tan 9” by 9” floor tile with black mastic (prior survey data)

300-3A, 300-3B

2nd floor West, 1st floor Middle

Layered floor tile with black mastic (prior survey data)

300-3C 1st floor West

12” by 12” floor tile, tan with brown streaks, with black mastic (ACM in tile and mastic) (HM #36)

FT3-1, FT3-2

Bay A Hallway

Mechanical Room

12” by 12” layered floor tile over black mastic (ACM in

2nd tile and mastic) (HM #42) FT4-1, FT4-2 Bay A North Hallway

Silver Roof Coating (HM #26) SRC1-1, SRC1-2

On rooftop mechanical equipment curb flashing and roof parapet walls adjacent 2nd floor center roof mechanical room

25 mechanical units, (approximately 750 sf), 200 sf on parapet walls

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Material Sample Numbers Locations Estimated Quantity

Outer column to CMU seam caulk, tan (HM #33)

COW-1, COW-2

Documented in 1st/2nd floor East, Presumed Throughout, where CMU walls meet concrete columns

Approximately 13 perimeter columns per floor (1st/2nd floor East), Unknown total quantity

Corrugated siding PRESUMED 1st floor Center, Exterior

Wall 540 sf

Exterior caulking at window/brick interface

PRESUMED

Head House Exterior

Windows 109 windows

Black tar on exterior flashing at West Wing entrance

PRESUMED

East and West Exterior

Entry Canopies 32 sf

Black sealant on exterior vent louvers

PRESUMED

Head House Exterior

Walls 165 lf

Caulk on interior door/CMU or Brick wall interface

PRESUMED

All interior door frames in brick or CMU walls

Unknown

Built-up Roofing PRESUMED Head House Roofs 50,000 sf

Asbestos was not documented to be present in the remaining bulk samples analyzed. A summary of the bulk sample analysis results is included in the attached Table 1, "Summary of PLM Analysis Results".

2.5 Asbestos Survey Conclusions and Recommendations

ACM identified above should be removed by a Georgia-licensed asbestos abatement contractor prior to the performance of any other work that will disturb these materials. The majority of the ACM flooring materials consist of varying layers beneath carpet. The presence of ACM flooring (whether floor tile and black mastic or black mastic only) should be presumed throughout the Head House areas and any flooring materials in the Head House areas should be removed by a Georgia-licensed asbestos abatement contractor.

Presumed ACM listed above should be either removed by a Georgia-licensed asbestos abatement contractor prior to the performance of any other work that will disturb these materials or sampled by an accredited asbestos inspector to determine asbestos content.

If any suspect materials not addressed in this survey are encountered in conjunction with any renovation efforts, or change in scope of work, ATS recommend that samples of suspect materials be collected by an AHERA accredited asbestos building inspector and analyzed by a NVLAP accredited laboratory to evaluate asbestos content.

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

3.0 LEAD-CONTAINING PAINT SURVEY

3.1 Regulatory Overview

EPA’s Housing and Urban Development (HUD) Regulations address paint coatings with lead concentrations greater than 0.5 percent by weight, which is designated as Lead-Based Paint (LBP). EPA’s HUD Regulations pertain to child occupied facilities and pre-1978 target housing.

This facility does not meet the applicability requirements for EPA’s HUD Guidelines.

Current OSHA regulations address lead in paint coatings regardless of lead concentrations. Paint coatings with measurable lead concentrations less than 0.5 percent by weight are designated as Paint-Containing Lead (PCL). Since OSHA does not differentiate between LBP and PCL, these paint coatings are grouped together as Lead-Containing Paint (LCP). If lead is present in the paint coatings at any concentration, employers must protect workers that may be exposed to lead at concentrations greater than the Permissible Exposure Limit (PEL). OSHA requires that contractors that may be exposed to lead in concentrations greater than the PEL during renovation or demolition activities be properly trained in accordance with OSHA’s Lead in Construction Standard (29 CFR 1926.62).

3.2 Overview of Lead-Containing Paint Survey Field Services

The LCP survey was conducted by Luke Dieffenbauch, Stephen Kimble and James Wolfe from 6 to 8 March 2023. The survey began with a walkthrough of the areas to be renovated to identify suspect LCP that would potentially be disturbed during the scheduled renovation project. LCP sampling combinations were generally selected by the color of the topcoat of paint on each type of substrate (i.e., tan paint on metal window trim). A total of 40 paint chip samples were collected, as summarized below. Due to field time constraints, not all observed suspect lead-containing paint coatings were sampled during these field efforts. Suspect LCPs not sampled are discussed below and should be treated as LCP until they are sampled and analyzed by an accredited laboratory to determine lead content. Paint chips were collected to the base substrate, including associated layers of paint leading to the substrate. The paint chip coatings are identified by the top layer color, obvious layers below the top layer (if present), and substrate to which it was attached.

• Red over yellow paint on fire sprinkler metal piping (Sample# L-1)

• Yellow paint on metal fire sprinkler piping (Sample# L-2)

• Cream over green paint on concrete ceiling (Sample# L-3)

• Beige paint on metal door (Sample# L-4)

• Beige paint on metal door frame (Sample# L-5)

• Dark gray paint on metal vault door (Sample# L-6)

• Cream paint on drywall (Sample# L-7)

• Brown paint on metal door frame (Sample# L-8)

• Tan paint on drywall (Sample# L-9)

• Tan over white over black over light blue over blue over sea foam green over dark green over light green layered paint on concrete wall (Sample# L-10)

• Tan/pink over green over olive layered paint on wood door frame (Sample# L-11)

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

• White over green over black layered paint on metal sprinkler piping (Sample# L-12)

• Tan paint on plaster wall (Sample# L-13)

• White paint on wood window frame (Sample# L-14)

• Gray over dark tan over white over blue green layered paint on wood door frame (Sample# L-15)

• Tan over dark green paint on wood door frame (Sample# L-16)

• White over gray paint on wood window trim, 1” by 4” and 1” by 8” trim (Sample# L-17)

• Mustard paint over metal roof drain (Sample# L-18)

• Off-white paint on metal door frame (Sample# L-19)

• Bluish-white paint on plaster wall (Sample# L-20)

• Gray over tan paint on concrete floor (Sample# L-21)

• Tan paint on wood door (Sample# L-22)

• Tan paint on metal roof drain (Sample# L-23)

• Mint green paint on wood door (Sample# L-24)

• Black over green over orange paint on metal hand rail (Sample# L-25)

• White over beige paint on CMU wall (Sample# L-26)

• Chartreuse paint on wood door (Sample# L-27)

• Bluish white paint on wall board (Sample # L-28)

• Beige paint on wood wall paneling (Sample# L-29)

• Seafoam green paint on CMU wall (Sample# L-30)

• Tan over dark gray paint on metal door (Sample# L-31)

• Dark gray paint on concrete floor (Sample# L-32)

• Cream paint on plaster ceiling (Sample# L-33)

• Tan paint on metal duct (Sample# L-34)

• Cream paint on brick wall (Sample# L-35)

• Gray paint on concrete subfloor (Sample# L-36)

• Dark blue paint on brick wall (Sample# L-37)

• Gray over Orange paint on structural steel (Sample# L-38)

• Black paint on metal pipe (Sample# L-39)

• Tan over blue over light blue over green layered paint on wood window frame (Sample# L-40)

Refer to Attachment 1 of this report for representative photographs of suspect LCP sampled.

Samples of suspect LCP were delivered to SAI in Greensboro, North Carolina and were analyzed for lead content by Flame Atomic Absorption Spectrometry in accordance with EPA SW-846 3050B/6010C/7420. Copies of the laboratory analysis data sheets and Chain-of-Custody are attached to this report as Attachment 3.

3.3 Summary of Analytical Results

Laboratory analysis indicated the presence of lead in the following paint samples analyzed.

LCP Coatings Sample Number Locations Response Action

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Red over yellow paint on fire sprinkler metal piping

L-1 Throughout Head House and Bay A

Comply with 29 CFR

1926.62 if disturbed

Yellow paint on metal fire sprinkler piping

L-2 Throughout Head House and Bay A

Comply with 29 CFR

1926.62 if disturbed

Cream over green paint on concrete ceiling

L-3 Throughout Head

House above suspended ceilings

Comply with 29 CFR

1926.62 if disturbed

Beige paint on metal door

L-4 Head House, East Basement, Secure

Area

Comply with 29 CFR

1926.62 if disturbed

Beige paint on metal door frame

L-5 Head House, East Basement, Secure

Area

Comply with 29 CFR

1926.62 if disturbed

Dark gray paint on metal vault door

L-6 Head House, East Basement, Secure

Area

Comply with 29 CFR

1926.62 if disturbed

Cream paint on drywall

L-7 Head House, East Basement, Secure

Area

Comply with 29 CFR

1926.62 if disturbed

Tan paint on wood paneling (Sample# L- 9)

L-9 Head House, East

Basement Comply with 29 CFR

1926.62 if disturbed

Tan over white over black over light blue over blue over sea foam green over dark green over light green on concrete wall

L-10 Head House, East

Basement Comply with 29 CFR

1926.62 if disturbed

Tan/pink over green over olive layered paint on wood door frame

L-11 Head House, East Wing Restrooms

Comply with 29 CFR

1926.62 if disturbed

White over green over black paint on metal sprinkler piping L-12

Throughout Head House

Comply with 29 CFR

1926.62 if disturbed

Tan paint on plaster walls

L-13 Throughout Head

House Comply with 29 CFR

1926.62 if disturbed

White paint on wood window frame

L-14 Throughout Head

House Comply with 29 CFR

1926.62 if disturbed

Gray over dark tan over white over blue

L-15 Head House, East Wing Lobby Doors

Comply with 29 CFR

1926.62 if disturbed

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

green layered paint on wood door frame

Tan over dark green paint on wood door frame L-16

Head House, East Wing

Comply with 29 CFR

1926.62 if disturbed

White over gray paint on wood window trim, 1” by 4” and 1” by 8” trim

L-17 Head House, Middle

Wing Comply with 29 CFR

1926.62 if disturbed

Mustard paint over metal roof drain

L-18 Head House, Roof Comply with 29 CFR

1926.62 if disturbed

Off-white paint on metal door frame

L-19 Head House, Roof

Access Door Comply with 29 CFR

1926.62 if disturbed

Bluish-white paint on plaster wall

L-20 Head House, Throughout

Comply with 29 CFR

1926.62 if disturbed

Gray over tan paint on concrete ceiling

L-21 Head House, Throughout above suspended ceilings

Comply with 29 CFR

1926.62 if disturbed

Tan paint on wood door

L-22 Head House, West Wing throughout

Comply with 29 CFR

1926.62 if disturbed

Tan paint on metal roof drain

L-23

Head House, below suspended ceilings and in mechanical areas

Comply with 29 CFR

1926.62 if disturbed

Mint green paint on wood door

L-24 Head House, West

Wing Storage Closet Comply with 29 CFR

1926.62 if disturbed

Black over green over orange paint on metal handrail L-25

Head House, West Wing stairwell

Comply with 29 CFR

1926.62 if disturbed

White over beige paint on CMU wall

L-26 Head House, West

Wing stairwell Comply with 29 CFR

1926.62 if disturbed

Chartreuse paint on wood door

L-27 Head House, West

Wing Cabinet Supplies door

Comply with 29 CFR

1926.62 if disturbed

Bluish white paint on wall board

L-28 Head House, West

Wing 1st floor Comply with 29 CFR

1926.62 if disturbed

Seafoam green paint on CMU wall

L-30 Bay A Loading Dock Mechanical/Storage

Room

Comply with 29 CFR

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Tan over dark gray paint on metal door

L-31 Bay A Loading Dock Mechanical/Storage

Room

Comply with 29 CFR

1926.62 if disturbed

Dark gray paint on concrete floor

L-32 Bay A/Head House

Loading Dock Comply with 29 CFR

1926.62 if disturbed

Tan paint on metal duct

L-34 Bay A Mechanical

Room Comply with 29 CFR

1926.62 if disturbed

Cream paint on brick wall

L-35 Bay A Mechanical

Room Comply with 29 CFR

1926.62 if disturbed

Gray paint on concrete subfloor

L-36 Bay A Comply with 29 CFR

1926.62 if disturbed

Dark blue paint on brick wall

L-37 Bay A Comply with 29 CFR

1926.62 if disturbed

Gray over orange paint on structural steel L-38

Bay A above suspended ceiling

Comply with 29 CFR

1926.62 if disturbed

Black paint on metal pipe

L-39 Head House cast iron piping throughout Comply with 29 CFR

1926.62 if disturbed

Tan over blue over light blue over green layered paint on wood window frame

L-40 Head House West Wing Basement

Mechanical Room

Comply with 29 CFR

1926.62 if disturbed

Tan on wood paneling

PRESUMED

1st floor Center, Exterior adjacent Bay Entry Door

Comply with 29 CFR

1926.62 if disturbed

Gray on wood trim PRESUMED 1st floor Center, Exterior Window Wall Comply with 29 CFR

1926.62 if disturbed

Tan on wood siding PRESUMED 1st floor Center, Exterior Window Wall Comply with 29 CFR

1926.62 if disturbed

Tan on corrugated siding

PRESUMED

1st floor Center, Exterior Window Wall Comply with 29 CFR

1926.62 if disturbed

Tan on window panels

PRESUMED

1st floor Center, Exterior Window Wall Comply with 29 CFR

1926.62 if disturbed

Black on exterior handrails

PRESUMED

Head House Exterior, adjacent basement window wells and loading dock

Comply with 29 CFR

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Black on exterior vent covers

PRESUMED Head House Exterior Comply with 29 CFR

1926.62 if disturbed

Cream on window lentils

PRESUMED Head House Exterior Comply with 29 CFR

1926.62 if disturbed

Mustard on rain downspouts

PRESUMED Head House Exterior Comply with 29 CFR

1926.62 if disturbed

Cream on exterior vents

PRESUMED Head House Exterior Comply with 29 CFR

1926.62 if disturbed

Brown on standing seam metal roofs and gutters PRESUMED Bay A exterior

Comply with 29 CFR

1926.62 if disturbed

White on metal siding PRESUMED Bay A exterior Comply with 29 CFR

Quantities disturbed by renovation to be determined.

A summary of the paint chip sample analysis results is included in the attached Table 2, "Paint Chip Sample Summary Table".

3.4 LCP Survey Conclusions and Recommendations

Lead was detected in some concentration in 37 of the 40 paint chip samples collected. Based on the variation of paint histories on surfaces throughout the survey area, painted surfaces except the following should be presumed to contain lead in detectable concentrations:

• Brown paint on metal vault doors/frames within the East Basement Secure Area;

• Beige wood paneling in the northeast office area on the 1st floor, West; and

• Cream paint on plaster ceilings above suspended ceilings in the south hallway extending from the loading zone in the First Floor, West extending to the Open Office area in the First Floor Center, along the north end of Bay A.

The Occupational Safety and Health Administration (OSHA) Construction Industry Standard for Lead (29 CFR 1926.62) does not reference the EPA/HUD definition for LBP (0.5% by weight or

1.0 mg/cm2). If detectable levels of lead are identified in any painted surface, paint disturbance will fall under the OSHA Lead Standard. OSHA 29 CFR 1926.62 requires employers to perform exposure monitoring for employees whose tasks disturb or potentially disturb lead. The data contained in this survey report should be provided to the Contractor, prior to the Contractor submitting bids for maintenance, renovation or demolition work. Due to the presence of LCP (either LBP or PCL) in Building 300, only those contractors trained in accordance with OSHA 29 CFR 1926.62 should perform demolition or renovation activities that disturb the LCP coatings.

Waste generated by disturbance LCP surfaces scheduled to be disposed in a landfill should be subjected to Toxicity Characteristic Leaching Procedure (TCLP) testing to determine leachable metal concentrations. If leachable concentrations of RCRA metals in construction waste are

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

determined by TCLP testing, those materials should be disposed of or recycled in accordance with EPA 40 CFR Part 260 to 271 and applicable State of Georgia Department of Natural Resources (DNR), Environmental Protection Division (EPD) Rules for Solid Waste Management (391-3-4) and Hazardous Waste Management (391-3-11). For lead, TCLP results greater than 5 milligrams per liter (mg/L) are considered hazardous lead waste (EP Toxicity) and carry a hazardous waste code under RCRA (40 CFR Part 261) of D008. Painted metal waste scheduled to be delivered to a metal recycling center does not require TCLP testing.

In states where ATS does not provide engineering services, engineering services will be provided by ATS Engineering, (P)LLC or a licensed contractor.

Table 1 – “Summary of PLM Analysis Results”

Table 1

Summary of PLM Analysis Results

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

PM-1 1 1

East Vault Hallway Beneath

Elevated Flooring Grey/Black mastic None Detected

PM-2 1 2

East Vault Hallway Beneath

Elevated Flooring Grey/Black Mastic None Detected

CB1-1-A 2 1a East Vault Hallway Blue 4" covebase with Cream mastic (covebase) None Detected

CB1-1-B 2 1b East Vault Hallway Blue 4" covebase with Cream mastic (mastic) None Detected

CB1-2-A 2 2a East Vault Hallway Blue 4" covebase with Cream mastic (covebase) None Detected

CB1-2-B 2 2b East Vault Hallway Blue 4" covebase with Cream mastic (mastic) None Detected

DSM1-1 3 1

Secure Area Ceiling Cubicle

Area Grey Duct Seam Mastic None Detected

DSM1-2 3 2

Secure Area Ceiling Cubicle

Area Grey Duct Seam Mastic None Detected

RSF1-1-A 4 1a East Valut Secure Area Kitchen Tan square pattern RSF (sheet flooring 1) None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

RSF1-1-B 4 1b East Valut Secure Area Kitchen Tan square pattern RSF (mastic 1) None Detected

RSF1-1-C 4 1c East Valut Secure Area Kitchen Tan square pattern RSF (sheet flooring 2) None Detected

RSF1-1-D 4 1d East Valut Secure Area Kitchen Tan square pattern RSF (mastic 2) None Detected

RSF1-2-A 4 2a East Valut Secure Area Kitchen Tan square pattern RSF (sheet flooring 1) None Detected

RSF1-2-B 4 2b East Valut Secure Area Kitchen Tan square pattern RSF (mastic 1) None Detected

RSF1-2-C 4 2c East Valut Secure Area Kitchen Tan square pattern RSF (sheet flooring 2) None Detected

RSF1-2-D 4 2d East Valut Secure Area Kitchen Tan square pattern RSF (mastic 2) None Detected

SC1-1 5 1 East Valut Secure Area Kitchen Grey Sink Undercoating None Detected

SC1-2 5 2 East Valut Secure Area Kitchen Grey Sink Undercoating None Detected

PI-1 6 1

East Wing Basement

Mechanical Room 3" pipe

White mastic over paper and yellow fiberglass insulation None Detected

PI-2 6 2

East Wing Basement

Mechanical Room 3" pipe

White mastic over paper and yellow fiberglass insulation None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

PI-3 6 3

East Wing Basement

Mechanical Room 3" Pipe

White mastic over paper and yellow fiberglass insulation None Detected

PE-1 7 1

East Wing Basement

Mechanical Room 3" Pipe Elbow Yellow fiberglass insulation None Detected

PE-2 7 2

East Wing Basement

Mechanical Room 3" Pipe Elbow Yellow fiberglass insulation None Detected

PE-3 7 3

East Wing Basement

Mechanical Room 3" Pipe Elbow Yellow fiberglass insulation None Detected

DSM2-1 8 1

East Wing Basement

Mechanical Room White Duct Seam Mastic None Detected

DSM2-2 8 2

East Wing Basement

Mechanical Room White Duct Seam Mastic None Detected

DSM3-1 9 1

East Wing Basement

Mechanical Room Dark Brown Duct Seam Mastic None Detected

DSM3-2 9 2

East Wing Basement

Mechanical Room Dark Brown Duct Seam Mastic None Detected

DSD1-1-A 10 1a East Wing Basement

Mechanical Room

Woven Fabric Duct Sound Dampener with Dark

Brown Duct Seam Mastic (sound dampener) None Detected

DSD1-1-B 10 1b East Wing Basement

Mechanical Room

Woven Fabric Duct Sound Dampener with Dark

Brown Duct Seam Mastic (mastic) None Detected

DSD1-2-A 10 2a East Wing Basement

Mechanical Room

Woven Fabric Duct Sound Dampener with Dark

Brown Duct Seam Mastic (sound dampener) None Detected

DSD1-2-B 10 2b East Wing Basement

Mechanical Room

Woven Fabric Duct Sound Dampener with Dark

Brown Duct Seam Mastic (mastic)

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

DW1-1 11 1

East Wing Secure Vault

Basement Wall Drywall Joint Compund White None Detected

DW1-2 11 2

East Wing Secure Vault

Basement Wall Drywall Joint Compund White None Detected

DW1-3 11 3

East Wing Secure Vault

Basement Wall Drywall Joint Compund White None Detected

DW1-4 11 4 East Wing Basement Wall Drywall Joint Compund White None Detected

DW1-5 11 5 East Wing Basement Wall Drywall Joint Compund White None Detected

DW1-6 11 6 East Wing Basement Wall Drywall Joint Compund White None Detected

CB2-1-A 12 1 East Basement Exterior Wall Black Covebase w/Black Brown Mastic (Covebase) None Detected

CB2-1-B 12 1 East Basement Exterior Wall Black Covebase w/Black Brown Mastic (Mastic) None Detected

CB2-2-A 12 2 East Basement Exterior Wall Black Covebase w/Black Brown Mastic (Covebase) None Detected

CB2-2-B 12 2 East Basement Exterior Wall Black Covebase w/Black Brown Mastic (Mastic) None Detected

CP1-1 13 1 1st Floor Mechanical Room Tan Canvas Pipe Insulation C.H.W Return None Detected

CP1-2 13 2 1st Floor Mechanical Room Tan Canvas Pipe Insulation C.H.W Return None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

CP1-3 13 3 1st Floor Mechanical Room Tan Canvas Pipe Insulation C.H.W Return None Detected

DI1-1 14 1 1st Floor Mechanical Room Duct Insulation Tan Canvas/White Mastic Over

Yellow Insulation None Detected

DI1-2 14 2 1st Floor Mechanical Room Duct Insulation Tan Canvas/White Mastic Over

Yellow Insulation None Detected

DI1-3 14 3 1st Floor Mechanical Room Duct Insulation Tan Canvas/White Mastic Over

Yellow Insulation None Detected

CW1-1 15 1 1st Floor Mechanical Room Chill Water Supply White Mastic Over Yellow

Insulation None Detected

CW1-2 15 2 1st Floor Mechanical Room Chill Water Supply White Mastic Over Yellow

Insulation None Detected

CB3-1-A 16 1 1st Floor Mechanical Room Covebase Grey w/Yellow Brown Mastic (Covebase) None Detected

CB3-1-B 16 1 1st Floor Mechanical Room Covebase Grey w/Yellow Brown Mastic (Mastic) None Detected

CB3-2-A 16 2 1st Floor Mechanical Room Covebase Grey w/Yellow Brown Mastic (Covebase) None Detected

CB3-2-B 16 2 1st Floor Mechanical Room Covebase Grey w/Yellow Brown Mastic (Mastic) None Detected

CT1-1 17 1

1st Floor East Women's

Restroom 2'x2' Ceiling Tile White Smooth None Detected

CT1-2 17 2 1st Floor East Men's Room 2'x2' Ceiling Tile White Smooth None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

WP1 18 1

1st Floor East Women's

Restroom White Wall Plaster None Detected

CB4-1-A 19 1

1st Floor East Women's

Restroom Covebase Plumw/Tan Brown Adhesive (Covebase) None Detected

CB4-1-B 19 1

1st Floor East Women's

Restroom

Covebase Plumw/Tan Brown Adhesive (Mixed

Adhesives) None Detected

CB4-2-A 19 2

1st Floor East Women's

Restroom Covebase Plumw/Tan Brown Adhesive (Covebase) None Detected

CB4-2-B 19 2

1st Floor East Women's

Restroom

Covebase Plumw/Tan Brown Adhesive (Mixed

Adhesives) None Detected

CT2-1 20 1 1st Floor Ceiling Tile 2'x2' Pin Dot Small Fissure White None Detected

CT2-2 20 2 1st Floor Ceiling Tile 2'x2' Pin Dot Small Fissure White None Detected

WP2 18 2 1st Floor Men's Restroom White Wall Plaster None Detected

WP3 18 3 1st Floor Men's Restroom White Wall Plaster None Detected

FT1-1-A 21 1 1st Floor Lobby 12"x12" Dark Grayw/White Streaks Floor Tile and

Yellow Adhesive (Tile) None Detected

FT1-1-B 21 1 1st Floor Lobby 12"x12" Dark Grayw/White Streaks Floor Tile and

Yellow Adhesive (Mastic 1) None Detected

FT1-1-C 21 1 1st Floor Lobby 12"x12" Dark Grayw/White Streaks Floor Tile and

Yellow Adhesive (Mastic 2)

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

FT1-2-A 21 2 Stairwell Landing 12"x12" Dark Grayw/White Streaks Floor Tile and

Yellow Adhesive (Tile) None Detected

FT1-2-B 21 2 Stairwell Landing 12"x12" Dark Grayw/White Streaks Floor Tile and

Yellow Adhesive (Mastic) None Detected

CT3-1-A 22 1 2nd Floor East Comms Room 1'x1' Ceiling Tile Pin Dot White w/Brown Glue Dots

(Ceiling Tile) None Detected

CT3-1-B 22 1 2nd Floor East Comms Room 1'x1' Ceiling Tile Pin Dot White w/Brown Glue Dots

(Mastic) None Detected

CT3-2-A 22 2 2nd Floor East Comms Room 1'x1' Ceiling Tile Pin Dot White w/Brown Glue Dots

(Ceiling Tile) None Detected

CT3-2-B 22 2 2nd Floor East Comms Room 1'x1' Ceiling Tile Pin Dot White w/Brown Glue Dots

(Mastic) None Detected

CB5-1-A 23 1 2nd Floor East Hallway Covebase Dark Blue w/Tan Adhesive (Covebase) None Detected

CB5-1-B 23 1 2nd Floor East Hallway Covebase Dark Blue w/Tan Adhesive (Mastic) None Detected

CB5-2-A 23 2 2nd Floor East Hallway Covebase Dark Blue w/Tan Adhesive (Covebase) None Detected

CB5-2-B 23 2 2nd Floor East Hallway Covebase Dark Blue w/Tan Adhesive (Mastic) None Detected

FT2-1-A 24 1 2nd Floor Center Comms Room 12"x12" Floor Tile White w/Tan Streaks Yellow

Adhesive (Tile) None Detected

FT2-1-B 24 1 2nd Floor Center Comms Room 12"x12" Floor Tile White w/Tan Streaks Yellow

Adhesive (Mastic)

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

FT2-2-A 24 2 2nd Floor Center Comms Room 12"x12" Floor Tile White w/Tan Streaks Yellow

Adhesive (Tile) None Detected

FT2-2-B 24 2 2nd Floor Center Comms Room 12"x12" Floor Tile White w/Tan Streaks Yellow

Adhesive (Mastic) None Detected

T-1 25 1 Roof - Middle Black Tar Roofing Material None Detected

T-2 25 2 Roof - Middle Black Tar Roofing Material None Detected

SRC1-1 26 1 Roof - Middle Silver Roof Coating 5% Chrysotile

SRC1-2 26 2 Roof - Middle Silver Roof Coating Not Analyzed

MUF1-2 27 1 Middle Roof - Mechanical Units Black Flashing None Detected

MUF1-1 27 2 Middle Roof - Mechanical Units Black Flashing None Detected

GT1-1-A 28 1 Middle Roof - Expansion Joint Gray/Black Tar Roofing Material (Black/Gray Layer) None Detected

GT1-1-B 28 1 Middle Roof - Expansion Joint Gray/Black Tar Roofing Material (Transparent Layer) None Detected

GT1-2-A 28 2 Middle Roof - Expansion Joint Gray/Black Tar Roofing Material (Black/Gray Layer) None Detected

GT1-2-B 28 2 Middle Roof - Expansion Joint Gray/Black Tar Roofing Material (Transparent Layer) None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

EDC1-1 29 1 Middle Roof Exterior Door Caulk White Door Caulk None Detected

EDC1-2 29 2 Middle Roof Exterior Door Caulk White Door Caulk None Detected

DSM4-1 30 1 Roof Mechanical Middle Room Duct Seam Mastic Olive None Detected

DSM4-2 30 2 Roof Mechanical Middle Room Duct Seam Mastic Olive None Detected

WPM1-1 31 1 Middle Roof Mechanical Room Black Water Proofing Mastic None Detected

WPM1-2 31 2 Middle Roof Mechanical Room Black Water Proofing Mastic None Detected

CB6-1-A 32 1 2nd Floor West Corner Stairwell Covebase Black w/Brown Adhesive (Covebase) None Detected

CB6-1-B 32 1 2nd Floor West Corner Stairwell Covebase Black w/Brown Adhesive (Mastic) None Detected

CB6-2-A 32 2 2nd Floor West Corner Stairwell Covebase Black w/Brown Adhesive (Covebase) None Detected

CB6-2-B 32 2 2nd Floor West Corner Stairwell Covebase Black w/Brown Adhesive (Mastic) None Dectected

COW-1 33 1

2nd Floor West Corner

Stairwell Outer Column to Wall Tan Seam Caulk 2% Chrysotile

COW-2 33 2

1st Floor West Corner

Stairwell Outer Column to Wall Tan Seam Caulk Not Analyzed

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

FM1-1 34 1 1st Floor Under Carpet Black Floor Mastic w/Yellow Carpet Glue 8% Chrysotile

FM1-2 34 2 1st Floor Under Carpet Black Floor Mastic w/Yellow Carpet Glue Not Analyzed

CT4-1 35 1 Bay A Hallway Mechanical Room 4'x2' White Pin Dot Ceiling Tile None Detected

CT4-2 35 2 Bay A Hallway Mechanical Room 4'x2' White Pin Dot Ceiling Tile None Detected

FT3-1-A 36 1

Bay A Hallway Mechanical

Room

12"x12" Tan Floor Tile w/Brown Streaks W/Black

Adhesive (Tile) 2% Chrysotile

FT3-1-B 36 1

Bay A Hallway Mechanical

Room

12"x12" Tan Floor Tile w/Brown Streaks W/Black

Adhesive (Mastic) 6% Chrysotile

FT3-2-A 36 2

Bay A Hallway Mechanical

Room

12"x12" Tan Floor Tile w/Brown Streaks W/Black

Adhesive (Tile) Not Analyzed

FT3-2-B 36 2

Bay A Hallway Mechanical

Room

12"x12" Tan Floor Tile w/Brown Streaks W/Black

Adhesive (Mastic) Not Analyzed

DSMS-1 37 1

Bay A Conference Room

Mechanical Room Duct Seam Mastic Dark Brown Molasses None Detected

DSMS-2 37 2

Bay A Conference Room

Mechanical Room Duct Seam Mastic Dark Brown Molasses None Detected

CT5-1 38 1 Bay A Offices 2'x2' 4 Square Pattern Ceiling Tile None Detected

CT5-2 38 2 Bay A Offices 2'x2' 4 Square Pattern Ceiling Tile None Detected

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

CB7-1-A 39 1 Bay A Offices Dark Gray Covebase w/Tan Adhesive (Covebase) None Detected

CB7-1-B 39 1 Bay A Offices Dark Gray Covebase w/Tan Adhesive (Mastic) None Detected

CB7-2-A 39 2 Bay A Offices Dark Gray Covebase w/Tan Adhesive (Covebase) None Detected

CB7-2-B 39 2 Bay A Offices Dark Gray Covebase w/Tan Adhesive (Mastic) None Detected

PM2-1 40 1 Bay A Sub Raised Floor Brown Pedestal Mastic None Detected

PM2-2 40 2 Bay A Sub Raised Floor Brown Pedestal Mastic None Detected

DI2-1 41 1 Bay A Above Ceiling Mezzanine Duct Insulation Mastic White over Yellow Adhesive None Detected

DI2-2 41 2 Bay A Above Ceiling Mezzanine Duct Insulation Mastic White over Yellow Adhesive None Detected

FT4-1-A 42 1 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Tile 1) None Detected

FT4-1-B 42 1 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Mastic 1) None Detected

FT4-1-C 42 1 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Tile 2) 4% Chrysotile

FT4-1-D 42 1 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Mastic 2) 5% Chrysotile

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

FT4-1-E 42 1 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Leveling Compound) None Detected

FT4-2-A 42 2 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic (Tile) None Detected

FT4-2-B 42 2 Bay A Hallway North Hall 12"x12" Layered Floor Tile over Black Mastic

(Mastic/Leveling Compound) None Detected

FT5-1-A 43 1 Bay A Hallway West Hallway 12"x12" Lite Blue Floor Tile w/White + Gray Streaks +

Clear Adhesives None Detected

FT5-1-B 43 1 Bay B Hallway West Hallway 12"x12" Lite Blue Floor Tile w/White + Gray Streaks +

Clear Adhesives (Mastic) Insufficeient Sample

FT5-2-A 43 2 Bay A Hallway West Hallway 12"x12" Lite Blue Floor Tile w/White + Gray Streaks +

Clear Adhesives None Detected

FT5-2-B 43 2 Bay B Hallway West Hallway 12"x12" Lite Blue Floor Tile w/White + Gray Streaks +

Clear Adhesives (Mastic) Insufficient Sample

CT6-1-A 44 1 1st Floor Center Office 118 12"x12" White Ceiling Square w/Dark Brown Glue

Dots (Ceiling Tile) None Detected

CT6-1-B 44 1 1st Floor Center Office 118 12"x12" White Ceiling Square w/Dark Brown Glue

Dots (Mastic) None Detected

CT6-2-A 44 1 1st Floor Center Office 118 12"x12" White Ceiling Square w/Dark Brown Glue

Dots (Ceiling Tile) None Detected

CT6-2-B 44 1 1st Floor Center Office 118 12"x12" White Ceiling Square w/Dark Brown Glue

Dots (Mastic) None Detected

FT6-1-A 45 1 Bay A Hallway 12"x12" Gray Tile w/Gray & White Streaks W/Clear

Adhesive (Tile)

Robins AFB Building 300

PENTA Project No. 23-5-10828

Sample No.

Homog.

Mat. No.

Assay

No.

Sample Location Sample Description Analysis Results

FT6-1-B 45 1 Bay A Hallway 12"x12" Gray Tile w/Gray & White Streaks W/Clear

Adhesive (Mastic) None Detected

FT6-2-A 45 2 Bay A Hallway 12"x12" Gray Tile w/Gray & White Streaks W/Clear

Adhesive (Tile) None Detected

FT6-2-B 45 2 Bay A Hallway 12"x12" Gray Tile w/Gray & White Streaks W/Clear

Adhesive (Mastic) None Detected

SPP1-1 46 1

Basement West Mechanical

Room Sump Pump Pipe

Insulation

Tan Canvas Wrap over Black Foamglass Insulation None Detected

SPP1-2 46 2

Basement West Mechanical

Room Sump Pump Pipe

Insulation

Tan Canvas Wrap over Black Foamglass Insulation None Detected

SPP1-3 46 3

Basement West Mechanical

Room Sump Pump Pipe

Insulation

Tan Canvas Wrap over Black Foamglass Insulation None Detected

RSF2-1 47 1 West Basement Under Carpet Gold RSF over Black Mastic Beneath Carpet None Detected

RSF2-2 47 2 West Basement Under Carpet Gold RSF over…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .