Replacement of Marquee Display Sign for the Robins AFB Chapel
Solicitation number
FA850126Q0077
Issued by

About this file

This document is a Questions and Answers (Q&A) record for a Request for Quotation (RFQ) regarding the procurement and installation of a double-sided LED marquee sign system. The Q&A clarifies significant scope modifications from the original solicitation, including confirmation that no demolition of the existing structure is required, and that no new brick monument is needed—the existing foundation and anchor-bolt system is intended for reuse. The required deliverable is a Vantage 10MM Double-sided LED display (120 x 240 Matrix) or an equivalent product meeting the technical specifications outlined in Section 3.0 of the Statement of Work (SOW).

Key project specifications include installation of the LED display with integration to existing electrical infrastructure (240V service, approximately 200 feet from the marquee); provision of a software/Content Management System (CMS) solution enabling remote sign updates from chapel computers; and a four-year warranty with 72-hour on-site response requirements throughout the warranty period. Project milestones are measured from the contract award date, with delivery required by December 31, 2026. The contract terms include no progress invoicing—payment occurs only upon final delivery and acceptance—and a four-year warranty covering all on-site labor and travel at no additional cost. Award will be made to the offeror that meets all solicitation requirements and terms and conditions with the lowest price. Electronic bid submissions are required via email to the designated Points of Contact (Kevin Hinman and Jessica Cobb), and alternate manufacturers are permitted provided they meet technical specifications. The SOW has been updated to reflect the scope clarifications addressed in this Q&A.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. It is noted in 2.1 Demolition and Disposal that the existing cabinets and concrete foundation should be removed. Item 2.3 Wind Load states an engineered drawing is required for the new sign. We will have to remove the existing structure including concrete and brick to qualify for any structural drawings. Drawings cannot be issued for an existing structure since we do not know have any information on the structure itself, how deep is the foundation etc. All of the above is fine but the last item 7.3 Price

Proposal asks for only pole and plates for existing anchor bolts. This is not possible if we have remove the structure.

a. No demolition is required.

b. SOW has been updated to reflect this change.

2. It does not ask for a new brick structure in the Price Proposal. Please confirm that this

RFQ includes a new brick monument.

a. No new monument.

b. SOW has been updated to reflect this change.

3. To help our installation team accurately assess the demolition, foundation, structural, and electrical requirements, would you please provide any recent photos of the existing marquee sign and surrounding area that may be available? If possible, photos showing the front and back of the sign, existing monument/base and anchor points, electrical connections, and surrounding site conditions would be especially helpful.

a. We will provide pictures as an attachment to the solicitation in SAM.Gov. It will be posted with this notice.

4. Is there existing electric already at signage or Is the signage vendor required to bring electric to the sign?

a. Existing electric already exists within the sign monument.

5. If it is the signage contractor who brings electric to the sign, can you please confirm What is the distance to the nearest electrical source?

a. The contractor will utilize the electrical already in the base of the Marquee.

6. Also, can you please confirm what do we have to trench through? (i.e. concreate / grass etc).

a. There should be no need for trenching of any kind.

7. Can you please also confirm the bid submission method? Do we email it you you?

a. Per the description posted on SAM.gov – Only electronic submission to the POCs

(Kevin Hinman and Jessica Cobb) via email will be accepted.

8. Can you please also confirm if we can propose alternate manufacturers?

a. As long as the display meets the technical specifications outlined in 3.0 of the

SOW, any manufacture that complies will be allowed.

9. Please provide the Department of Labor Construction Wage Determination referenced in

SOW Section 6.3 and confirm the applicable construction labor requirements.

a. We will provide this attachment as an attachment to the solicitation in SAM.gov and will be available with this notice.

10. Does the specified “Vantage 10MM Double sided LED display, 120 x 240 Matrix” require that exact product, or may an equal product meeting the required characteristics be proposed?

a. See 8.

11. Is the existing foundation and anchor-bolt system intended for reuse, or should offerors price a new reinforced footing? If available, please provide foundation/anchor-bolt dimensions, site photographs, as-builts, and utility information.

a. Existing structure is intended for reuse. See 12 for utility information.

12. What electrical service is available at the marquee point of connection, including voltage, phase, amperage/breaker capacity, and approximate distance from the sign? Is a pre-quote site visit available?

a. Picture within attachment titled “Current Marquee Pictures and Electrical

Information” contains information. Max voltage is 240V. Existing sign has 120

VAC, Modular 60 Hz, Total watts 2604. The breaker box is about 200 feet away from the marquee.

13. From what event are the 15, 45, 60, 70, and 75-calendar-day milestones measured, and how should the 75-day schedule be reconciled with the December 31, 2026 delivery date?

a. This schedule starts at the date of contract award.

14. When does the seven-year cellular-service period begin, and for how long must the

FedRAMP Moderate CMS license/subscription remain active?

a. We just need some kind of software/CMS Solution that connects from the

Marquee to computers inside the chapel to update the sign as needed.

b. Sow has been updated to reflect this change.

15. May the three required similar-project references be projects performed by proposed major subcontractors/team members, or must they belong to the prime offeror?

a. Past performance is no longer a factor, no need to submit any references.

b. SOW has been updated to reflect this change.

16. Does the four-year warranty include all on-site labor and travel at no additional cost, and does the 72-hour on-site response requirement apply throughout the full warranty period?

a. Yes

17. Are milestone or progress invoices permitted, or should the contractor expect to invoice only after final delivery and acceptance?

a. No progress invoices are permitted for this effort. Once the final deliverable is in place and working, the contractor will submit an invoice and be paid.

18. Please confirm the evaluation factors and their relative importance under FAR 52.212-2, as well as the required quote submission method and authorized submission recipient.

a. The basis for award will be the offeror that meets the requirements of the solicitation, including all terms and conditions, and has the lowest price.