This is a Questions and Answers (Q&A) document for solicitation FA850126Q0044, addressing contractor inquiries regarding the installation of an access control system for Building 2051N at Robins Air Force Base.
Key Technical and Operational Requirements: The Government clarified that the Contractor must provide 200 MIFARE credentials, all required network infrastructure to support system operation, and supply all necessary components for a standalone access control system with no integration to existing enterprise systems. No existing access control system is currently installed in Building 2051N. For the four exterior access-controlled doors, the system will operate with credential-based access (card reader) for ingress, free egress via electrified panic bar, and door position monitoring through DPS devices. The warranty period requires on-site technician support with a three-hour response time for technician arrival, not merely acknowledgement or remote support. Contractor Responsibilities and Compliance: The Contractor is responsible for maintaining all necessary Georgia state electrical and low-voltage contractor licensing requirements, which must be in place by proposal submission, award, or performance as mandated under FAR Clause 52.236-7 (Permits and Responsibilities). This represents an important compliance obligation for bidders on this small business set-aside solicitation, with quotes due no later than 1200 EST on 22 June 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign In Sheet - Access Control System Visit.jpg | JPG image | |
| FA850126Q0044 QA_23 June 26.docx | DOCX document | |
| Solicitation Amendment FA850126Q00440002 SF 30.pdf | ||
| 2051N_First_Floor_81EWS.pdf | ||
| 2051N_Second_Floor.pdf | ||
| Solicitation Amendment FA850126Q00440001 SF 30.pdf | ||
| Solicitation - FA850126Q0044.pdf | ||
| ECP 1.JPG | JPG image | |
| Wage Determination 2015 4495 Rev 31.pdf | ||
| 2051N Entry Control Points.pptx | PPTX presentation | |
| ECP 3.JPG | JPG image | |
| ECP 4.jpg | JPG image | |
| ECP 2.JPG | JPG image | |
| Solicitation - FA850126Q0044.pdf | ||
| Statement_of_Work_Access_Control_System_FINAL.docx | DOCX document | |
| CDRL - Access Control System.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Access Control System Installation for Bldg 2051N
1. Can the Government confirm whether any specific State of Georgia electrical or low-voltage contractor licensing requirements apply to this procurement, and if so, whether such licensing is required at proposal submission, award, or performance? Under FAR Clause 52.236-7 (Permits and Responsibilities), the federal government contractually mandates that private firms maintain all necessary state licenses. Local job postings for commercial contractor roles on Robins AFB explicitly list a valid Georgia state license/certification as a mandatory requirement.
1. Can the Government clarify whether the required three-hour response time during the warranty period refers to acknowledgement/remote support response or on-site technician arrival? Government client will require On-site technician support during the warranty period.
1. Will the Government furnish the approximately 200 MIFARE credentials referenced in the Statement of Work, or shall the Contractor provide new credentials as part of this effort? The contractor will be responsible to supply 200 MIFARE credentials.
1. Will Government-furnished network connectivity be available at the controller and wireless lock gateway locations, or shall the Contractor provide all required network infrastructure necessary to support system operation? The Contractor will provide the required network infrastructure necessary to support system operation.
1. Is the new access control system intended to operate as a standalone deployment within Building 2051N, or integrate with an existing enterprise access control system? This will be a standalone system.
1. Is there an existing access control system currently installed within Building 2051N? No
1. If so, should existing controllers, readers, door hardware, cabling, and associated equipment be removed and disposed of by the contractor, or remain in place unless specifically replaced by the new system? N/A
1. Are existing request-to-exit devices, readers, power supplies, and cabling intended to be reused where serviceable? N/A
1. For the four (4) exterior access-controlled doors, is the Government's intended operation:
8. Credential-based access (card reader) for ingress, Yes
8. Free egress utilizing the electrified panic bar, Yes
8. With door position monitoring through the DPS devices? Yes