This document contains questions and answers related to Solicitation FA850124Q0008 for Robins AFB Rental Chillers Blanket Purchase Agreement (BPA). Key details are:
The BPA is expected to be effective for 5 years, with BPA contractors providing pricing quotes in response to each call/order during that period. Contractors will have 3 business days to respond to each request for quote. There will not be a site visit, as the length/distance to services varies per building requirement. Historical chiller system rental requirements at Robins AFB are provided. Vendors may submit multiple quotes to illustrate pricing at their lowest and highest estimates. This is a new solicitation, as there is no incumbent performing these rental services currently. The rental chillers will connect to the chilled water system, with a maximum building height of 3 stories, and use water only (no glycol or other brine mixtures).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Questions and Answers-23 May 24.docx | DOCX document | |
| Solicitation Questions and Answers.docx | DOCX document | |
| BPA Agreement Schedule.pdf | ||
| Solicitation - FA850124Q0008 FINAL.pdf | ||
| Wage Determination 15-4495.pdf | ||
| Authorized Callers List-26 Apr 2024.pdf | ||
| PWS-26 Apr 2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Current as of 29 May 2024
Robins AFB Rental Chillers BPA Solicitation FA850124Q0008 Questions and Answers
Q1. Will BPA Contractors be given a timeframe of more than 7 days to get the chiller on-site? This is due to potential shipping, installation, etc.
A1. Each BPA call/order will specify the timeframe in which the rental chiller is needed and BPA Contractors shall respond to calls/orders with pricing and delivery information via email within three (3) business days of each BPA request for quote.
Q2. Is there an annual renewal period for the firm fixed period of time (to adjust costs accordingly) and total BPA expected duration?
A2. The BPA is expected to be effective for a total of five (5) years with beginning and end dates determined upon BPA award. BPA Contractors will provide price quotes in response to each call/order throughout the five-year duration of the BPA. This will be the Contractors’ opportunity to adjust pricing based on the current marketplace at that time.
Q3. Will a site visit be scheduled for the locations where the chillers will be installed so interested vendors can view how much hose, cable, and labor will be needed to accurately quote the solicitation?
A3. No. Every building may not have easy access to power or the chilled water system in the same area. The length/distance to services varies per building requirement, therefore there is no standard measurement for required hose, cable, and/or labor. There will be an opportunity for BPA Contractors to visit the specified facility for each BPA call/order.
Q4. Can interested vendors use 100ft as an estimated/standard length to determine pricing for materials such as chiller lines and labor?
A4. Interested vendors may use their own standardized lengths for this purpose. Please specify the chosen standardized measurement when submitting price quotes.
Q5. Are there any historical demands available for this effort?
| A5. Please see the table below showing previous chiller system rentals at Robins AFB |
| Fiscal Year |
| Requirement |
| 2018 |
| 450 Ton system, 14-month rental |
| 2019 |
| 150 Ton system, 14-month rental |
| 2019 |
| Two 1000 Ton systems, 5.5-month rental |
| 2019 |
| 250 Ton system, 8-month rental |
| 2020 |
| 250 Ton system, 12-month rental |
| 2020 |
| 30 Ton system, 3-month rental |
| 2021 |
| 30 Ton system, 2-month rental |
| 2021 |
| Two 1000 Ton systems, 3-month rental |
| 2022 |
| Two 1000 Ton systems, 3-month rental |
| 2022 |
| 400 Ton system, 5.5-month rental |
| 2022 |
| 320 Ton system, 5-month rental |
| 2023 |
| Two 1000 Ton systems, 9-month rental |
| 2023 |
| 200 Ton system, 12-month rental |
Q6. Can interested vendors offer a breakdown of pricing per month for each tonnage of rental chiller?
A6. Interested vendors should offer their “bottom line” price for each tonnage of rental chiller, based on weekly and monthly rental periods. Prices should include the cost of all labor, materials, equipment, transportation, and supervision for supplying and connecting requested chiller systems in designated Robins AFB facilities, as well as removal of the systems from Robins AFB property.
Q7. Can interested vendors submit more than one quote to illustrate pricing at their lowest and highest price estimates?
A7. Yes, interested vendors may submit more than one quote if necessary. Each quote will be evaluated individually.
Q8. Is this a brand new contract or is there an incumbent performing these services?
A8. There is no current contract for rental chillers active on Robins AFB. This solicitation is for the anticipated need for rental chillers at an undetermined time in the future, likely beginning in the hotter summer months of the year.
Q9. What kind of systems would the rental chillers be tying in to?
A9. Chilled water system
Q10. Would any of the rental chillers be for buildings with piping that goes higher than 5 stories?
A10. No, three (3) stories is the tallest building
Q11. Are the chillers water only, or would glycol or other brine mixtures be used for the chillers?
A11. Water only
Q12. Will the rental chillers operate at nominal (>40°F outlet) temperatures, or will low temperature (<40°F outlet) units be needed?
A12. No rental chillers are needed to operate below 40°F
Q13. For the larger chiller requests, is it acceptable to parallel smaller chillers together to meet the capacity requested?
A13. Paralleling systems poses the problem with the amount of taps that would be available and the amount of available power. There are a limited number of spare breakers in certain areas.