Solicitation Questions and Answers-23 May 24.docx

DOCX document 22 KB Posted

Attached to
Robins AFB Rental Chillers BPA Federal contract opportunity
Solicitation number
FA850124Q0008
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains a set of questions and answers related to a solicitation for a Blanket Purchase Agreement (BPA) for rental chiller systems at Robins AFB in Georgia. The key details are:

The BPA is expected to be effective for a total of five (5) years. BPA contractors will be required to provide price quotes within three (3) business days of each BPA request for quote, with the opportunity to adjust pricing based on the current marketplace. No site visits will be scheduled, as the required hose, cable, and labor lengths can vary per building. Historical rental data is provided, showing previous chiller system rentals ranging from 30 tons to 1,000 tons over the past several years. Vendors may submit multiple quotes to illustrate lowest and highest price estimates, with pricing to include all labor, materials, equipment, transportation, and supervision. There is no incumbent contractor, as this is a new requirement for rental chillers at Robins AFB.

View the file

Other files for this federal contract opportunity

Other files attached to Robins AFB Rental Chillers BPA, newest first.
File Type Posted
Solicitation Questions and Answers-29 May 24.docx DOCX document
Solicitation Questions and Answers.docx DOCX document
BPA Agreement Schedule.pdf PDF
Solicitation - FA850124Q0008 FINAL.pdf PDF
Wage Determination 15-4495.pdf PDF
Authorized Callers List-26 Apr 2024.pdf PDF
PWS-26 Apr 2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Current as of 23 May 2024

Robins AFB Rental Chillers BPA Solicitation FA850124Q0008 Questions and Answers

Q1. Will BPA Contractors be given a timeframe of more than 7 days to get the chiller on-site? This is due to potential shipping, installation, etc.

A1. Each BPA call/order will specify the timeframe in which the rental chiller is needed and BPA Contractors shall respond to calls/orders with pricing and delivery information via email within three (3) business days of each BPA request for quote.

Q2. Is there an annual renewal period for the firm fixed period of time (to adjust costs accordingly) and total BPA expected duration?

A2. The BPA is expected to be effective for a total of five (5) years with beginning and end dates determined upon BPA award. BPA Contractors will provide price quotes in response to each call/order throughout the five-year duration of the BPA. This will be the Contractors’ opportunity to adjust pricing based on the current marketplace at that time.

Q3. Will a site visit be scheduled for the locations where the chillers will be installed so interested vendors can view how much hose, cable, and labor will be needed to accurately quote the solicitation?

A3. No. Every building may not have easy access to power or the chilled water system in the same area. The length/distance to services varies per building requirement, therefore there is no standard measurement for required hose, cable, and/or labor. There will be an opportunity for BPA Contractors to visit the specified facility for each BPA call/order.

Q4. Can interested vendors use 100ft as an estimated/standard length to determine pricing for materials such as chiller lines and labor?

A4. Interested vendors may use their own standardized lengths for this purpose. Please specify the chosen standardized measurement when submitting price quotes.

Q5. Are there any historical demands available for this effort?

A5. Please see the table below showing previous chiller system rentals at Robins AFB
Fiscal Year
Requirement
2018
450 Ton system, 14-month rental
2019
150 Ton system, 14-month rental
2019
Two 1000 Ton systems, 5.5-month rental
2019
250 Ton system, 8-month rental
2020
250 Ton system, 12-month rental
2020
30 Ton system, 3-month rental
2021
30 Ton system, 2-month rental
2021
Two 1000 Ton systems, 3-month rental
2022
Two 1000 Ton systems, 3-month rental
2022
400 Ton system, 5.5-month rental
2022
320 Ton system, 5-month rental
2023
Two 1000 Ton systems, 9-month rental
2023
200 Ton system, 12-month rental

Q6. Can interested vendors offer a breakdown of pricing per month for each tonnage of rental chiller?

A6. Interested vendors should offer their “bottom line” price for each tonnage of rental chiller, based on weekly and monthly rental periods. Prices should include the cost of all labor, materials, equipment, transportation, and supervision for supplying and connecting requested chiller systems in designated Robins AFB facilities, as well as removal of the systems from Robins AFB property.

Q7. Can interested vendors submit more than one quote to illustrate pricing at their lowest and highest price estimates?

A7. Yes, interested vendors may submit more than one quote if necessary. Each quote will be evaluated individually.

Q8. Is this a brand new contract or is there an incumbent performing these services?

A8. There is no current contract for rental chillers active on Robins AFB. This solicitation is for the anticipated need for rental chillers at an undetermined time in the future, likely beginning in the hotter summer months of the year.

File details come from the government source that posted it. Updated .