RFIs with Answers updated 27 July 2022.docx

DOCX document 15 KB Posted

Attached to
Design/Build ANG ACS Weapons Facility
Solicitation number
FA850122R0011
Issued by

View the file

Other files

File Type Posted
ANG Site Visit Sign in.jpg JPG image
Solicitation Amendment FA850122R00110002 SF 30.pdf PDF
Atch Blank Sample AF Form 3052.xls XLS spreadsheet
Atch BLANK SAMPLE AF Form 3064.xlsx XLSX spreadsheet
Atch BLANK SAMPLE AF Form 3065.xlsx XLSX spreadsheet
QA Responses -1 of 2 165 CES.pdf PDF
Bid QA Responses 2 of 2 - 165 CES.pdf PDF
XDQU172001 Site 2 Utilities.pptx PPTX presentation
XDQU172001 Site 1 Utilities.pdf PDF
RFIs with answers 81622.docx DOCX document
NGB Preferred Concept Design - for bidders.pdf PDF
QA Responses - 165 CES.pdf PDF
Bid Schedule.docx DOCX document
Chatham Co wage rates.pdf PDF
Solicitation Amendment - FA850122R00110001 updated.pdf PDF
Location Map-image.png PNG image
wage determination.pdf PDF
Solicitation Final - FA850122R0011.pdf PDF
XDQU172001 - SOW Revised 22 Final.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs with Answers updated 27 July 2022

1. Can you please confirm the meeting time and address found within the Solicitation?

Tuesday, August 2, 2022 at 9:30AM ET. 1401 ROBERT B MILLER JR DR GARDEN CITY, GA 31408-9001

2. Sam.Gov shows a bid date and time of 22 Aug @ 11AM CDT while the solicitation shows a bid date and time of 18 Aug @ 1PM EST – can the bid date and time be clarified?

· I have amended the solicitation. The correct due date is the 22 Aug 2022 at 1:00 ET.

3. This solicitation seems to be missing a section M & Section L does not contain a lot of the usual Solicitation requirements/instructions. Can the proposal requirements/instructions be clarified?

· Meet the requirements as stated in codes and standards that are provided in the Request For Proposal.

4. Part 2 Attachment B, Room data sheet for the classroom shows no ceiling, exposed to structure above – is this correct and if so, is spiral duct required, or painted structure and components above?

· Meet the requirements as stated in codes and standards that are provided in the Request For Proposal.

5. Is dissipative carpet tile desired to be placed on the raised access flooring?

· Meet the requirements as stated in codes and standards that are provided in the Request For Proposal.

6. Is lightning protection needed?

· Meet the requirements as stated in codes and standards that are provided in the Request For Proposal.

7. Is cathodic protection needed?

· No

8. Is any fencing needed?

· No

9. Does the PEMB need any masonry or will metal wall panels suffice?

· If metal wall panels meet the requirements for secure open storage facility, then this will suffice.

10. Does the structure need any canopies, and if so, how many and at which openings?

· Canopies will be dependent upon design agent and how they plan to protect the doors / locks from the elements.

11. Will one of the two existing, nearby parking lots serve this new building, or will additional parking be needed?

· Depends on the site that is chosen

12. Are sidewalks required, and if so, to which parking lot?

· Yes sidewalks will be required. Layout will be dependent on final chosen location of the three that will be proposed by design agent.

13. What price range magnitude does this solicitation fall under?

$1M-$5M