e - 16 Apr 09 contractor cost blank.xls
XLS spreadsheet 66 KB Posted
- Solicitation number
- FA8501-08-R-0050
About this file
Specification to Solicitation FA8501-08-R-0050 Repair/Replace Storage Tanks, Bldg 922.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1- 16 April 2009 Revision | — | |
| 2- 01300 - Submittals & Certificate of ComplianceREV.doc | DOC document | |
| EE112OQ0REV .pdf | ||
| 3-01650 - REV Phasing Plan.doc | DOC document | |
| d- Bid Schedule | — | |
| FA8501-08-R-0050.doc | DOC document | |
| ME104OQ0 REVISED.pdf | ||
| CE102OQ0 REV.pdf | ||
| ME105OQ0 PHASING REV.pdf | ||
| GE101OQ0REV.pdf | ||
| EE110OQ0REV .pdf | ||
| 01005 - Statement of Work REV.doc | DOC document | |
| 5- 15050-REV.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mechanical
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 | |||||||||
| CONTRACTOR: | ADDRESS: | 16-Apr-09 | ||||||||
| CONTRACT FOR: | Replace UG Fuel Storage Tanks, B/922 | |||||||||
| PROJECT NUMBER: | UHHZ 020212 | |||||||||
| DISCIPLINE/ITEM #/OPTION #: | Mechanical | WORK LOCATION: | ROBINS AIR FORCE BASE, GA | |||||||
| MATERIAL TAX: | LABOR BURDEN: | *OVERHEAD: | *PROFIT: | *BID BOND | ||||||
| (1) | (2) | (3) | MATERIAL COST | LABOR COST | (9) | (10) | ||||
| ITEM | UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | |||
| LINE | OF | PER | AVERAGE | DIRECT | LINE | |||||
| NO. | MEASURE | QUANTITY | UNIT | TOTAL | MAN-DAYS | RATE | TOTAL | COSTS | TOTAL | |
| = (3) X (4) | = (6) X (7) | = (5) + (8) + (9) | ||||||||
| DEMOLITION: | ||||||||||
| 1 | DEMO PAVING, EXCAVATE TRENCHES, AND HAUL SPOILS | LS | ||||||||
| 2 | REMOVE EXISTING UNDERGROUND TANKS | EA | ||||||||
| 3 | REMOVE NON-CONTAMINATED SOIL AND BACKFILL | CY | ||||||||
| 4 | REMOVE PRODUCT PIPING | LS | ||||||||
| NEW WORK: | ||||||||||
| 5 | 15,000 GALLON UNDERGROUND TANK | EA | ||||||||
| 6 | PIPE CHASE | EA | ||||||||
| 7 | SUBMERSIBLE PUMPS | EA | ||||||||
| 8 | SHOP DRAWINGS, WORK PLAN | LS | ||||||||
| 9 | 2" TRIPLE WALL PRODUCT PIPING | LF | ||||||||
| 10 | 2" STAGE I VAPOR RECOVERY PIPE | LF | ||||||||
| 11 | CRUSHER RUN BED FOR NEW PIPING AND TANKS | LS | ||||||||
| 12 | ASPHALT REPAIR | SF | ||||||||
| 13 | ON-SITE SAFETY AND BARRICADES-Sheetpiling | LS | ||||||||
| 14 | CONCRETE REPAIR | SF | ||||||||
| 15 | LEAK DETECTION/MONITORING SYSTEM (New Console TLS-450) | LS | ||||||||
| 16 | New leak detection monitoring wells | LS | ||||||||
| 17 | TEMPORARY ACCESSORY ITEMS | LS | ||||||||
| 18 | SOIL TESTING FOR CONTAMINATION (Tank Pit & Pipeline) | EA | ||||||||
| 19 | SOIL TESTING FOR CONTAMINATION (Stockpile) | EA | ||||||||
| 20 | EQUIPMENT RENTAL | LS | ||||||||
| 21 | START-UP | LS | ||||||||
| 22 | Sodding/Landscapping | LS | ||||||||
| 23 | ||||||||||
| 24 | ||||||||||
| 25 | ||||||||||
| AF Form 3052 Mech Page 1 | ||||||||||
| Sales Tax | Labor Burden | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | |||||||
| Overhead | $0.00 | |||||||||
| Subtotal | $0.00 | |||||||||
| Profit | $0.00 | |||||||||
| Subtotal | $0.00 | |||||||||
| Bid Bond | $0.00 | |||||||||
| Grand Total | $0.00 | |||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 | |||||||||
| CONTRACTOR: | ADDRESS: | |||||||||
| CONTRACT FOR: | Replace UG Fuel Storage Tanks, B/922 | |||||||||
| PROJECT NUMBER: | UHHZ 020212 | Remove contaminated soil | ||||||||
| DISCIPLINE/ITEM #/OPTION #: | OPTION 1 | WORK LOCATION: | ROBINS AIR FORCE BASE, GA | |||||||
| MATERIAL TAX: | LABOR BURDEN: | *OVERHEAD: | *PROFIT: | *BID BOND | ||||||
| (1) | (2) | (3) | MATERIAL COST | LABOR COST | (9) | (10) | ||||
| ITEM | UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | |||
| LINE | OF | PER | MAN-DAYS | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | QUANTITY | UNIT | TOTAL | PER UNIT | RATE | TOTAL | COSTS | TOTAL | |
| = (3) X (4) | = (6) X (7) | = (5) + (8) + (9) | ||||||||
| 1 | Remove contaminated soil and backfill | CY | ||||||||
| 2 | Preparation of CAP-A Report | LS | ||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| AF Form 3052 Mech Option 1 Page 1 | ||||||||||
| Sales Tax | Labor Burden | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | |||||||
| Overhead | ||||||||||
| Subtotal | ||||||||||
| Profit | ||||||||||
| Subtotal | ||||||||||
| Bid Bond | ||||||||||
| Grand Total | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 | |||||||||
| CONTRACTOR: | ADDRESS: | |||||||||
| CONTRACT FOR: | ||||||||||
| PROJECT NUMBER: | UHHZ 020212 | Remove additional contaminated soil | ||||||||
| DISCIPLINE/ITEM #/OPTION #: | Mechanical (Option 2) | WORK LOCATION: | ROBINS AIR FORCE BASE, GA | |||||||
| MATERIAL TAX: | LABOR BURDEN: | *OVERHEAD: | *PROFIT: | *BID BOND | ||||||
| (1) | (2) | (3) | MATERIAL COST | LABOR COST | (9) | (10) | ||||
| ITEM | UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | |||
| LINE | OF | PER | MAN-DAYS | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | QUANTITY | UNIT | TOTAL | PER UNIT | RATE | TOTAL | COSTS | TOTAL | |
| = (3) X (4) | = (6) X (7) | = (5) + (8) + (9) | ||||||||
| 1 | Remove contaminated soil and backfill | CY | ||||||||
| 2 | Equipment Rental | WEEK | ||||||||
| 3 | Preparation of CAP-A Addendum | LS | ||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| AF Form 3052 Mech Option 2 Page 1 | ||||||||||
| Sales Tax | Labor Burden | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | |||||||
| Overhead | ||||||||||
| Subtotal | ||||||||||
| Profit | ||||||||||
| Subtotal | ||||||||||
| Bid Bond | ||||||||||
| Grand Total | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | PAGE 1 | |||||||||
| CONTRACTOR: | ADDRESS: | |||||||||
| CONTRACT FOR: | Replace UG Fuel Storage Tanks, B/922 | |||||||||
| PROJECT NUMBER: | UHHZ 020212 | |||||||||
| DISCIPLINE/ITEM #/OPTION #: | Mechanical (Option 3) | WORK LOCATION: | ROBINS AIR FORCE BASE, GA | |||||||
| MATERIAL TAX: | LABOR BURDEN: | *OVERHEAD: | *PROFIT: | *BID BOND | ||||||
| (1) | (2) | (3) | MATERIAL COST | LABOR COST | (9) | (10) | ||||
| ITEM | UNIT | (4) | (5) | (6) | (7) | (8) | OTHER | |||
| LINE | OF | PER | MAN-DAYS | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | QUANTITY | UNIT | TOTAL | PER UNIT | RATE | TOTAL | COSTS | TOTAL | |
| = (3) X (4) | = (6) X (7) | = (5) + (8) + (9) | ||||||||
| 1 | Sump Subcontractor | |||||||||
| 2 | CADD Operator | |||||||||
| 3 | Senior Engineer | |||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| AF Form 3052 Mech Option 3 Page 1 | ||||||||||
| Sales Tax | Labor Burden | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | |||||||
| Overhead | ||||||||||
| Subtotal | ||||||||||
| Profit | ||||||||||
| Subtotal | ||||||||||
| Bid Bond | ||||||||||
| Grand Total |
Breakdown Costs
| CONSTRUCTION COST ESTIMATE BREAKDOWN (LINE ITEMS) PROJECT UHHZ020212 | PAGE 1 | ||||
| LINE ITEM 0001 (BASE BID) | LINE ITEM 0003 (OPTION 2) | LINE ITEM 0005 | |||
| ITEM | $ | ITEM | $ | ITEM | $ |
| GENERAL CONDITIONS | GENERAL CONDITIONS | GENERAL CONDITIONS | |||
| CIVIL | CIVIL | CIVIL | |||
| ARCHITECTURAL | ARCHITECTURAL | ARCHITECTURAL | |||
| STRUCTURAL | STRUCTURAL | STRUCTURAL | |||
| MECHANICAL | MECHANICAL | MECHANICAL | |||
| ELECTRICAL | ELECTRICAL | ELECTRICAL | |||
| REMOVE ADDITIONAL CONTAMINATION SOIL & BACKFILL | |||||
| PREPARE CAP-A REPORT ADDENDUM | |||||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S OVERHEAD | PRIME'S OVERHEAD | PRIME'S OVERHEAD | |||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S PROFIT | PRIME'S PROFIT | PRIME'S PROFIT | |||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S BID BOND | PRIME'S BID BOND | PRIME'S BID BOND | |||
| PRIME'S TOTAL | PRIME'S TOTAL | PRIME'S TOTAL | |||
| LINE ITEM 0002 (OPTION 1) | LINE ITEM 0004 (OPTION #3) | LINE ITEM 0006 | |||
| ITEM | $ | ITEM | $ | ITEM | $ |
| GENERAL CONDITIONS | GENERAL CONDITIONS | GENERAL CONDITIONS | |||
| CIVIL | CIVIL | CIVIL | |||
| ARCHITECTURAL | ARCHITECTURAL | ARCHITECTURAL | |||
| STRUCTURAL | STRUCTURAL | STRUCTURAL | |||
| MECHANICAL | MECHANICAL | MECHANICAL | |||
| ELECTRICAL | ELECTRICAL | ELECTRICAL | |||
| REMOVE CONTAMINATION SOIL & BACKFILL | REPLACE DISPENSER SUMPS | ||||
| PREPARE CAP-A REPORT | |||||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S OVERHEAD | PRIME'S OVERHEAD | PRIME'S OVERHEAD | |||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S PROFIT | PRIME'S PROFIT | PRIME'S PROFIT | |||
| SUBTOTAL | SUBTOTAL | SUBTOTAL | |||
| PRIME'S BID BOND | PRIME'S BID BOND | PRIME'S BID BOND | |||
| PRIME'S TOTAL | PRIME'S TOTAL | PRIME'S TOTAL |
Breakdown totals
| CONSTRUCTION COST ESTIMATE BREAKDOWN (TOTALS) | LAST PAGE | |||||||
| CONTRACTOR: | ||||||||
| ADDRESS: | ||||||||
| CONTRACT FOR: | Replace UG Fuel Storage Tanks, B/922 | |||||||
| PROJECT NUMBER: | UHHZ 020212 | |||||||
| UNIT | QUANTITY | UNIT PRICE | TOTAL | |||||
| LINE ITEM 0001 | LS | 1 | ||||||
| LINE ITEM 0002 (OPTION #1) (Remove contaminated soil) | LS | 1 | ||||||
| LINE ITEM 0003 (OPTION #2) (Remove contaminated soil) | LS | 1 | ||||||
| LINE ITEM 0004 (OPTION #3) (REPLACE DISPENSER SUMPS) | LS | 1 | ||||||
| GRAND TOTAL | NOTE: THE VALUES AT LEFT SHOULD MATCH THE BID SCHEDULE | |||||||
| Option 1 and option 2 is Environmental work if work required | ||||||||
| AF FORM 3052 | ||||||||
| SIGNATURE | TITLE | DATE |
File details come from the government source that posted it. Updated .