e - 16 Apr 09 contractor cost blank.xls

XLS spreadsheet 66 KB Posted

Attached to
RECOVERY - UHHZ020212 - Repair/Replace Usts, Exch Service Sta, B/922
Solicitation number
FA8501-08-R-0050
Issued by

About this file

Specification to Solicitation FA8501-08-R-0050 Repair/Replace Storage Tanks, Bldg 922.

View the file

Other files

File Type Posted
1- 16 April 2009 Revision —
2- 01300 - Submittals & Certificate of ComplianceREV.doc DOC document
EE112OQ0REV .pdf PDF
3-01650 - REV Phasing Plan.doc DOC document
d- Bid Schedule —
FA8501-08-R-0050.doc DOC document
ME104OQ0 REVISED.pdf PDF
CE102OQ0 REV.pdf PDF
ME105OQ0 PHASING REV.pdf PDF
GE101OQ0REV.pdf PDF
EE110OQ0REV .pdf PDF
01005 - Statement of Work REV.doc DOC document
5- 15050-REV.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mechanical

CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1
CONTRACTOR:ADDRESS:16-Apr-09
CONTRACT FOR:Replace UG Fuel Storage Tanks, B/922
PROJECT NUMBER:UHHZ 020212
DISCIPLINE/ITEM #/OPTION #:MechanicalWORK LOCATION:ROBINS AIR FORCE BASE, GA
MATERIAL TAX:LABOR BURDEN:*OVERHEAD:*PROFIT:*BID BOND
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
ITEMUNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERAVERAGEDIRECTLINE
NO.MEASUREQUANTITYUNITTOTALMAN-DAYSRATETOTALCOSTSTOTAL
= (3) X (4)= (6) X (7)= (5) + (8) + (9)
DEMOLITION:
1DEMO PAVING, EXCAVATE TRENCHES, AND HAUL SPOILSLS
2REMOVE EXISTING UNDERGROUND TANKSEA
3REMOVE NON-CONTAMINATED SOIL AND BACKFILLCY
4REMOVE PRODUCT PIPINGLS
NEW WORK:
515,000 GALLON UNDERGROUND TANKEA
6PIPE CHASEEA
7SUBMERSIBLE PUMPSEA
8SHOP DRAWINGS, WORK PLANLS
92" TRIPLE WALL PRODUCT PIPINGLF
102" STAGE I VAPOR RECOVERY PIPELF
11CRUSHER RUN BED FOR NEW PIPING AND TANKSLS
12ASPHALT REPAIRSF
13ON-SITE SAFETY AND BARRICADES-SheetpilingLS
14CONCRETE REPAIRSF
15LEAK DETECTION/MONITORING SYSTEM (New Console TLS-450)LS
16New leak detection monitoring wellsLS
17TEMPORARY ACCESSORY ITEMSLS
18SOIL TESTING FOR CONTAMINATION (Tank Pit & Pipeline)EA
19SOIL TESTING FOR CONTAMINATION (Stockpile)EA
20EQUIPMENT RENTALLS
21START-UPLS
22Sodding/LandscappingLS
23
24
25
AF Form 3052 Mech Page 1
Sales TaxLabor Burden
Subtotal$0.00Subtotal$0.00
Overhead$0.00
Subtotal$0.00
Profit$0.00
Subtotal$0.00
Bid Bond$0.00
Grand Total$0.00
CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1
CONTRACTOR:ADDRESS:
CONTRACT FOR:Replace UG Fuel Storage Tanks, B/922
PROJECT NUMBER:UHHZ 020212Remove contaminated soil
DISCIPLINE/ITEM #/OPTION #:OPTION 1WORK LOCATION:ROBINS AIR FORCE BASE, GA
MATERIAL TAX:LABOR BURDEN:*OVERHEAD:*PROFIT:*BID BOND
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
ITEMUNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERMAN-DAYSAVERAGEDIRECTLINE
NO.MEASUREQUANTITYUNITTOTALPER UNITRATETOTALCOSTSTOTAL
= (3) X (4)= (6) X (7)= (5) + (8) + (9)
1Remove contaminated soil and backfillCY
2Preparation of CAP-A ReportLS
3
4
5
6
7
8
AF Form 3052 Mech Option 1 Page 1
Sales TaxLabor Burden
Subtotal$0.00Subtotal$0.00
Overhead
Subtotal
Profit
Subtotal
Bid Bond
Grand Total
CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1
CONTRACTOR:ADDRESS:
CONTRACT FOR:
PROJECT NUMBER:UHHZ 020212Remove additional contaminated soil
DISCIPLINE/ITEM #/OPTION #:Mechanical (Option 2)WORK LOCATION:ROBINS AIR FORCE BASE, GA
MATERIAL TAX:LABOR BURDEN:*OVERHEAD:*PROFIT:*BID BOND
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
ITEMUNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERMAN-DAYSAVERAGEDIRECTLINE
NO.MEASUREQUANTITYUNITTOTALPER UNITRATETOTALCOSTSTOTAL
= (3) X (4)= (6) X (7)= (5) + (8) + (9)
1Remove contaminated soil and backfillCY
2Equipment RentalWEEK
3Preparation of CAP-A AddendumLS
4
5
6
7
8
AF Form 3052 Mech Option 2 Page 1
Sales TaxLabor Burden
Subtotal$0.00Subtotal$0.00
Overhead
Subtotal
Profit
Subtotal
Bid Bond
Grand Total
CONSTRUCTION COST ESTIMATE BREAKDOWNPAGE 1
CONTRACTOR:ADDRESS:
CONTRACT FOR:Replace UG Fuel Storage Tanks, B/922
PROJECT NUMBER:UHHZ 020212
DISCIPLINE/ITEM #/OPTION #:Mechanical (Option 3)WORK LOCATION:ROBINS AIR FORCE BASE, GA
MATERIAL TAX:LABOR BURDEN:*OVERHEAD:*PROFIT:*BID BOND
(1)(2)(3)MATERIAL COSTLABOR COST(9)(10)
ITEMUNIT(4)(5)(6)(7)(8)OTHER
LINEOFPERMAN-DAYSAVERAGEDIRECTLINE
NO.MEASUREQUANTITYUNITTOTALPER UNITRATETOTALCOSTSTOTAL
= (3) X (4)= (6) X (7)= (5) + (8) + (9)
1Sump Subcontractor
2CADD Operator
3Senior Engineer
4
5
6
7
8
AF Form 3052 Mech Option 3 Page 1
Sales TaxLabor Burden
Subtotal$0.00Subtotal$0.00
Overhead
Subtotal
Profit
Subtotal
Bid Bond
Grand Total

Breakdown Costs

CONSTRUCTION COST ESTIMATE BREAKDOWN (LINE ITEMS) PROJECT UHHZ020212PAGE 1
LINE ITEM 0001 (BASE BID)LINE ITEM 0003 (OPTION 2)LINE ITEM 0005
ITEM$ITEM$ITEM$
GENERAL CONDITIONSGENERAL CONDITIONSGENERAL CONDITIONS
CIVILCIVILCIVIL
ARCHITECTURALARCHITECTURALARCHITECTURAL
STRUCTURALSTRUCTURALSTRUCTURAL
MECHANICALMECHANICALMECHANICAL
ELECTRICALELECTRICALELECTRICAL
REMOVE ADDITIONAL CONTAMINATION SOIL & BACKFILL
PREPARE CAP-A REPORT ADDENDUM
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S OVERHEADPRIME'S OVERHEADPRIME'S OVERHEAD
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S PROFITPRIME'S PROFITPRIME'S PROFIT
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S BID BONDPRIME'S BID BONDPRIME'S BID BOND
PRIME'S TOTALPRIME'S TOTALPRIME'S TOTAL
LINE ITEM 0002 (OPTION 1)LINE ITEM 0004 (OPTION #3)LINE ITEM 0006
ITEM$ITEM$ITEM$
GENERAL CONDITIONSGENERAL CONDITIONSGENERAL CONDITIONS
CIVILCIVILCIVIL
ARCHITECTURALARCHITECTURALARCHITECTURAL
STRUCTURALSTRUCTURALSTRUCTURAL
MECHANICALMECHANICALMECHANICAL
ELECTRICALELECTRICALELECTRICAL
REMOVE CONTAMINATION SOIL & BACKFILLREPLACE DISPENSER SUMPS
PREPARE CAP-A REPORT
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S OVERHEADPRIME'S OVERHEADPRIME'S OVERHEAD
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S PROFITPRIME'S PROFITPRIME'S PROFIT
SUBTOTALSUBTOTALSUBTOTAL
PRIME'S BID BONDPRIME'S BID BONDPRIME'S BID BOND
PRIME'S TOTALPRIME'S TOTALPRIME'S TOTAL

Breakdown totals

CONSTRUCTION COST ESTIMATE BREAKDOWN (TOTALS)LAST PAGE
CONTRACTOR:
ADDRESS:
CONTRACT FOR:Replace UG Fuel Storage Tanks, B/922
PROJECT NUMBER:UHHZ 020212
UNITQUANTITYUNIT PRICETOTAL
LINE ITEM 0001LS1
LINE ITEM 0002 (OPTION #1) (Remove contaminated soil)LS1
LINE ITEM 0003 (OPTION #2) (Remove contaminated soil)LS1
LINE ITEM 0004 (OPTION #3) (REPLACE DISPENSER SUMPS)LS1
GRAND TOTALNOTE: THE VALUES AT LEFT SHOULD MATCH THE BID SCHEDULE
Option 1 and option 2 is Environmental work if work required
AF FORM 3052
SIGNATURETITLEDATE

File details come from the government source that posted it. Updated .