d- Bid Schedule

29 KB Posted

Attached to
RECOVERY - UHHZ020212 - Repair/Replace Usts, Exch Service Sta, B/922
Solicitation number
FA8501-08-R-0050
Issued by

About this file

Specification to Solicitation FA8501-08-R-0050 Repair/Replace Storage Tanks, Bldg 922.

Text of this file

UHHZ 020212

BIDDING SCHEDULE

ITEM

DESCRIPTION

AMOUNT

BASE BID:

Provide all plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for

UHHZ 020212 to Replace Existing underground Fuel Storage

Tanks at BX Gas Station, B/922

Total BASE Bid ==>

OPTION 1:

Provide additional cost to the base bid if the soil to be removed as required in the base bid is contaminated $______

ESTIMATED

UNIT

ITEM

DESCRIPTION

QUANTITY

PRICE

AMOUNT

OPTION 2:

Provide all plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for

Option 2 to remove additional contaminated soil and provide backfill

330 CY

$___ /CY $______

OPTION 3:

Provide all plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for

Option 3 to replace all existing dispensers’ sumps with new

9 EA

$ /EA $ _

Total Bid ==>

BIDDING COMPANY: ____________________________

PERSON: _______________________________________

TITLE: __________________________________________

DATE: __________________________________________

NOTES:

1. We strongly recommended the contractor visit the site to determine the complexity of the work and the amount of material required for this project. Field measurements may have been necessary to determine the size and quantity of materials. Conditions that the Contracting Officer decides would have been obvious or visible to the contractor on inspection at the site visit will not be considered under the Differing Site Conditions provision of the contract.

2. Under the base bid, the contractor shall remove and dispose off base non-contaminated soil approximate 5 ft deep from the existing tanks’ bottom and 5 ft on all sides from the tanks’ walls. All soil testing shall be performed as required under the base bid. Provide new clean, good and compacted soil 95% dry density from off base for backfill.

3. Under option 1, the contractor shall provide additional cost to the base bid if the soil to be removed and disposed off base as indicated in item 2 above is POL contaminated waste.

4. The Government must verify extensions (line totals) of unit prices. If the unit price times the quantity differ from the extension, the unit price will be taken as the bid. If the bidder submits a subsequent modification to a unit price bid, providing for a lump sum adjustment to the total estimated cost, state the application of the adjustment to each unit price in the schedule. If it is not stated, the lump sum adjustment will be applied pro rata to every unit price in the schedule. Further, the actual quantities after award will be as determined by the Technical Representative of the Contracting Officer (CES Inspector). The final payment for each estimated line item will be based upon actual quantities accomplished and not the estimated quantities on the bid schedule.

5. Under option 2, The Government will require the contractor to remove additional contaminated concrete and/or soil around the project site. The contractor shall place these materials in rolloffs/containers for transporting and disposing off base as POL contaminated waste in an approved site. Provide new clean, good and compacted soil 95% dry density from off base for backfill.

6. The Government reserves the right award base bid and option(s) upon the availability of funds.

Bid Schedule (Blank).doc - 4-Nov-99

Other files

File Type Posted
1- 16 April 2009 Revision —
2- 01300 - Submittals & Certificate of ComplianceREV.doc DOC document
EE112OQ0REV .pdf PDF
3-01650 - REV Phasing Plan.doc DOC document
FA8501-08-R-0050.doc DOC document
ME104OQ0 REVISED.pdf PDF
CE102OQ0 REV.pdf PDF
ME105OQ0 PHASING REV.pdf PDF
GE101OQ0REV.pdf PDF
EE110OQ0REV .pdf PDF
01005 - Statement of Work REV.doc DOC document
5- 15050-REV.doc DOC document
e - 16 Apr 09 contractor cost blank.xls XLS spreadsheet
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .