APG Sustainment 1423 22Jul25 (2).pdf
PDF 11 MB Posted
- Attached to
- APG 66/68 F-16 Radar Support Federal contract opportunity
- Solicitation number
- FA823225RB009
About this file
This document is a Contract Data Requirements List (CDRL) for the APG 66/68 Radar contract with Northrop Grumman, associated with Contract Line Item Number 0013. The CDRL details multiple data deliverables required throughout the contract, including various technical reports, status reports, logistics support analyses, and management documents. Key deliverables include Contractor's Progress and Status Reports, Technical Reports, Logistics Management Information (LMI) Data Products, Government Furnished Equipment Inventory Reports, Accident/Incident Reports, and Field Failure Reports.
The documents specify detailed submission requirements for each deliverable, such as electronic format (Microsoft Office), distribution limitations (Distribution Statement D), and export control warnings. Most reports must be submitted monthly, semi-annually, or within specific timeframes after contract award, with the government allowed 10 business days to review and provide comments. Submission is primarily to AFLCMC/WAM at Hill Air Force Base, with most reports to be sent electronically to AFLCMC.WWM.F-16DataMgmt@us.af.mil. The contract emphasizes controlled unclassified information (CUI) handling and includes strict export control notifications regarding technical data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination Rev 31.pdf | ||
| Solicitation Amendment FA823225RB0090004 SF 30.pdf | ||
| Solicitation Amendment - FA823225RB0090004.pdf | ||
| GFP Attachment.xlsx | XLSX spreadsheet | |
| PWS Revision 7 APG 66-68 Radar.pdf | ||
| Solicitation Amendment FA823225RB0090003 SF 30.pdf | ||
| Solicitation Amendment - FA823225RB0090003.pdf | ||
| Solicitation Amendment - FA823225RB0090002.pdf | ||
| Solicitation Amendment FA823225RB0090002 SF 30.pdf | ||
| PWS Revision 6 APG 66_68 .pdf | ||
| Solicitation Amendment - FA823225RB0090001.pdf | ||
| Solicitation Amendment FA823225RB0090001 SF 30.pdf | ||
| Solicitation - FA823225RB009.pdf | ||
| BASIC - CDRL- DD1423Pkg_2025-Apr-09-1259.pdf | ||
| PWS Revision 5 APG 66-68 Radar.pdf | ||
| CSTOs Qty Bands 3 Yrs.xlsx | XLSX spreadsheet | |
| DD254 Sol NG FA8232-25-R-B009 APG_WAM_CO.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C24-04-12 APG 66/68 Radar
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
CONTRACTOR’S PROGRESS AND STATUS REPORT
3. SUBTITLE
Program Management Test
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81928/T
5. CONTRACT REFERENCE
PWS Para. 3.9.1
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
RD
Bldg 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
IV
NSP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The first submittal shall be NLT thirty (30) calendar days after contract award.
Subsequent submittals shall be monthly thereafter throughout the life of the contract.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. AFLCMC.WWM.F-16DataMgmt@us.af.mil
DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Cost Reporting Status
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B/T
5. CONTRACT REFERENCE
PWS Para. 2.2, 3.9.1
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
Road
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit report NLT the due date provided on specific PWS deliverable. The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Requirement Analysis
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B/T
5. CONTRACT REFERENCE
PWS Para. 4.2.1
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit report NLT the due date provided on specific PWS deliverable. The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Engineering Technical Support
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B/T
5. CONTRACT REFERENCE
PWS Para. 3.1, 4.2, 5.1
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit report NLT thirty (30) calendar days after award of each Delivery Order. Subsequent submittals shall be monthly thereafter throughout the life of the contract.
The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Test/Inspection Report DTO
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
PWS Para. 4.2.2
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit report NLT the due date provided on specific PWS deliverable. The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
Field Reliability and Supportability
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC 80508B/T
5. CONTRACT REFERENCE
PWS Para. 3.7.5, 3.8.2, 4.3
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit I.E, M.E, T.E, and Field Reliability and Supportability reports semi-annually six (6) months after contract award until the end of the contract.
The contractor shall submit Spares Provisioning reports as requested and specified on specific PWS delivery order.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Test Inspection STS Updates
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
PWS Para. 3.7.3, 4.4
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The contractor shall submit reports semi-annually six (6) months after contract award until the end of the contract. The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Contractor's Progress and Status Report
3. SUBTITLE
Vendor Data Base
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
PWS Para. 3.8.1
6. REQUIRING OFFICE
AFLCMC/WAM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and /or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBMITTED IN ENGLISH.
1. Block 4: Contractor's Electronic Format in Microsoft Office Product is acceptable; paper copy is not required.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control (May 2024) Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically impractical to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the notice to accompany the release of export-controlled technical information required by Part 250 of Title 32, CFR.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPTR Distribution Statement: B POC: F-16 SPO Configuration Management, AFLCMC.WWMEJ.F16CM@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5200.48.
3. Blocks 10, 11, 12, 13:
BLK16
AFLCMC/WAMI 1
AFLCMC/WAM 1
6089 WARDLEIGH
ROAD
BLDG 1201
Hill AFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
a. DMS Report(s) shall be submitted quarterly NLT ninety (90) calendar days after contract award and shall be in portable document format (PDF).
b. Industrial Base Report shall be submitted semi annually (6) months after contract award and shall be in portable document format (PDF).
c. The Government will be allowed 10 business days to review and return comments. The Contractor shall submit the updated report incorporating Government comments NLT 10 business days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. AFLCMC.WWM.F-16DataMgmt@us.af.mil
b. Northrup Grumman (NGC) secure site (NGC Safe)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FA8251-20
F. CONTRACTOR
NORTHROP GRUMMAN
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Product Engineering Design Data and Associated Lists
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000F/T
5. CONTRACT REFERENCE
Sow
6. REQUIRING OFFICE
AFLCMC/WAMI
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE
BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
A. Changes to all office symbols and/or e-mail addresses, when necessary shall be made by letter through the government CO/ACO without further revision to this CDRL.
1. Block 4:
a. Block 10, change DOD-STD-100 to MIL-STD-100C (as guidance).
b. The contractor shall document the configuration of all non-production, sustained configurations. Applies to prime contractor, vendors and subcontractors.
c. Complete set of engineering data to define AN/APG 66/68 RADAR requirements is required which includes assembly drawings (down to and including SRU drawings). When applicable: Acceptance Test Procedures are also required. Data call outs below the detail drawing of referenced document level on parts lists are not required, Software and Firmware are not required by this CDRL.
d. Engineering Data Changes: All Class I and Class II changes as defined in DOD-STD-480(as guidance only) shall be incorporated on the application engineering drawings and associated lists.
e. On engineering drawings and associated lists, maintain records of all configurations delivered so that the details of any configuration delivered may be determined without research of or recourse to change history.
f. Replace paragraph 201.1.2, Note 5, of DOD-STD-100C(as guidance only) with the following: "Specification control drawings shall not be used to depict commercial or vendor developed items upon which a design activity has placed additional physical or functional requirements in addition to those normally provided by vendors. These kinds of items shall be depicted on either selected item drawings or alter item drawings are appropriate. Additional qualification test requirements shall be regarded as an additional physical or functional requirement".
g. Data deliveries shall be limited to applicable data not previously delivered to Hill Air Force Base.
h. Identify the contract number(s), CAGE, drawing number, latest revision, and date the drawing was delivered to Hill Air Force Base.
i. All documents, Engineering Drawings, Associated Lists referenced there in shall be in the English language and 3rd angle projection shall be used.
j. The contractor shall use DOD-STD-100C and MIL-STD-130 (as guidance only) in assignment and identification of parts numbers and drawing numbers. Drawings shall specify requirements for markings of MIL-STD-130. The drawings shall identify the metthod of marking and location on the part.
k. Tube bending drawings shall be prepared using specification MIL-D-9898 (as guidance only).
l. The proprietary FAR clause shall not appear on the drawing that does not disclose proprietary information.
AFLCMC/WAMI 1
6089 Wardleigh
ROAD
building 1201
Hill AFB, UT
84056
AFLCMC/LZPEM 1
6032 Fir Ave
Building 1237
HAFB, UT
84056
15. TOTAL 0 2 0
G. PREPARED BY
FLORISBELLO.NICOLE.LYNN.1274745289
H. DATE
2024/05/07
I. APPROVED BY J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 3 Pages
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FA8251-20
F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
m. Procurement requirements IAW MIL-STD-31000 and using DOD-D-1000B(as guidance only) with tailored paragraph 6.2 as follows:
1. Drawing, Engineering data and Associated Lists, 28 Oct 77(as guidance).
2. Level 3, tailored by Block 16, paragraph 1 c.
3. Use contractor Design Activity Identifiers.
4. N/A
5. N/A
6. See Block 4.
7. Metric System N/A.
8. See CDRL.
9. As applicable. Company standards are acceptable per 3.7.
10. Parts Lists are required.
11. Parts List is required for each assembly drawing.
12. Mono-detail drawings are required. However, multi-detailed drawings are acceptable, but limited to the depiction of like items, detail assemblies, parts detailed and assembled on the same drawing sheet.
13. Not different than Paragraph 3.4.3.
14. As applicable, control drawings shall conform to paragraph 3.5.2.
15. Parts list may be integral or separate. However, when separate, a different list shall be prepared for each assembly and subassembly drawing.
16. Drifting medium DOD-STD-100C, paragraph 104 as guidance.
17. see Block 14.
18. see CDRL, para 3 d.
19. see Block 14.
2. Block 7 and 8: Form DD250 will be signed by government addressee listed in BLK 14 of this CDRL after final delivery of data has been approved by the Government Engineer and Engineering Data Management Officer (EDMO). Government will respond with approval/disapproval within (30) calendar days after receipt.
3. Block 9: Distribution Statement, Export Control Warning and Destruction Notice shall be IAW DoD Instruction 5230.24.
DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only;
critical technology, export controlled; 01 May 2024. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, UT 84056.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
CONTROLLED UNCLASSIFIED INFORMATION (CUI):
“CUI/" shall be displayed at the top and bottom of each (all) sheets:
The following CUI information shall be placed on the first sheet of each document, Product Engineering Design Data and Associated Lists IAW DoDI 5200.48:
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution/Dissemination Control: Distribution Statement D POC: AFLCMC.WWM.F-16DataMgmt@us.af.mil
NOTE: These CDRL requirements shall be levied on all relationships of Contractor with Subcontractors/Vendors: The contractor shall levy on sub-contractors and sub-vendors the same requirements for Technical Data Packages (TDPs) as are levied on them by this contract. This requirement shall apply at all tiers of sub-contractor/vendor levels associated with the program.
All data deliveries shall be submitted in English. If English and/or other language is provided, only English language shall be binding/approved.
DD FORM 1423-1, FEB 2001 Page 2 of 3 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A, B, C
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO.
FA8251-20
F. CONTRACTOR
NORTHROP GRUMMAN
16. REMARKS (Continued)
4. Block 14:
a. The contractor shall submit a DD Form 250 at time of shipment to:
Block 14 Addressee 1.
b. A letter of transmittal for each data submittal shall be sent to the following e-mail addesses:
1. AFLCMC.WWM.F-16DataMgmt@us.af.mil
2. aflcmc.lzpem.edmo@us.af.mil
c. The contractor shall submit a shipping list with each shipment of data delivered. The format shall be contractor format. The list shall specify if the shipment is partial, incremental, update, final or make-up (corrected) as appropriate.
d. Entries for associated lists shall list document type (i.e., PL), drawing number, and parts list revision letter.
e. Vendor shipping list shall be contractor format. Vendor shall be segregated by Cage Code. Vendor shipping list shall contain, as a minimum:
1. Drawing/Document number
2. Revision status
3. Cage Code
f. Delivery of Engineering Drawings and Associated Lists shall be via CD-ROM to the address below or other digital means agreed upon between the government CO/PCO, Program Office and AFLCMC/LZPEM and Northrop Grumman:
AFLCMC/LZPEM
6032 FIR AVE
Building 1218 Hill AFB, UT 84056-8525 Attn: EDMO OFFICE
1. The contractor shall deliver updates to all data annually as drawing changes occur.
2. All submittals (including updates) will be reviewed and approved or disapproved by the government no later than thirty (30) calendar days after receipt.
g. The data shall be delivered in the following formats:
1. All drawings shall be delivered in PDF as 1 composite file for all sheets.
2. Instructions ) for All documents (Technical Data Package) submitted in PDF Format.
Metadata/indexing shall be prepared IAW Digital Data Description Requirement document 9579776 Revision N (CAGE 98752) Option 2 page 21 Hill Air Force Base.
h. Final Delivery of Product Drawings and Associated Lists shall be submitted through CD-ROM (CD-R) to BLK 14 addressees, subject to government final review and acceptance. Updates continue to be delivered annually as drawing changes occur. ALL drawings are subject to government final review and acceptance.
DD FORM 1423-1, FEB 2001 Page 3 of 3 Pages
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
D. SYSTEM/ITEM
TDP ________ TM _______ OTHER
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
SYSTEM/ITEM
TDP ________ TM _______ OTHER
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .