SOW_Wiring_Harness_IDIQ_rev14.docx
DOCX document 39 KB Posted
- Solicitation number
- FA8232-17-R-3023
About this file
F-16 Wiring Harness Basic Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16PR4559_rev_D_Harness_Fab_Braided_Metal_Shielding.pdf | ||
| FA823217R3023_______0005.pdf | ||
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended_06.doc | DOC document | |
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended_05.doc | DOC document | |
| FA823217R3023_______0004.pdf | ||
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended_04.doc | DOC document | |
| FA823217R3023_______0003.pdf | ||
| Questions_and_Answers_003.xlsx | XLSX spreadsheet | |
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended_03.doc | DOC document | |
| Questions_and_Answers_002.xlsx | XLSX spreadsheet | |
| FA823217R3023_______0002.pdf | ||
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended_02.doc | DOC document | |
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00019_Amended.doc | DOC document | |
| FA823217R3023_______0001.pdf | ||
| Harnesses_Sec_L_Rev_0014.doc | DOC document | |
| Harnesses_Sec_M_016.docx | DOCX document | |
| FA823217R3023.pdf | ||
| Request_for_Proposal_Harnesses_IDIQ_Sample_Task_00018.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC STATEMENT OF WORK (SOW)
WIRING HARNESS/KIT ASSEMBLIES IDIQ
DATED: 4/24/2017
Table of Contents
| Table of Contents | 2 | |
| INTRODUCTION | 3 | |
| 1. | Purpose | 3 |
| 2. | Scope | 3 |
| TECHNICAL DESCRIPTION | 3 | |
| 3. | Requirements | 3 |
| 4. | Drawings | 3 |
| CONTRACTOR TASKING / REQUIREMENTS | 3 | |
| 5. | Contractor Specific Requirements | 3 |
| 6. | Quality Assurance Plan | 4 |
| 7. | Rough Order of Magnitude (ROM) | 4 |
| 8. | Proposals | 4 |
| 9. | Delivery Requirements | 4 |
| 10. | Kits/Parts | 5 |
| 11. | Production | 5 |
| 12. | First Article Inspection | 5 |
| 13. | Changes Coordination | 5 |
| 14. | Government Inspection and Acceptance of Parts | 6 |
| DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE | 6 | |
| 15. | Period of Performance | 6 |
| 16. | Delivery Schedule | 6 |
| SPECIAL CONSIDERATIONS | 6 | |
| 17. | Property | 6 |
| 18. Packaging | 7 | |
| 19. Kick-Off meeting award and Initial Delivery Order (IDO) | 7 |
20. CDRLs……………………………………………………………………………………7
INTRODUCTION
1. Purpose
1.1.1. The purpose of this contract is to provide the U.S. Air Force a multiple award IDIQ contract to provide low cost and rapid delivery of diverse wiring harnesses parts and kits, for the F-16 fleet to include all Block aircraft. The F-16 Systems Integration office requires the ability to have wiring harnesses built in rapid succession in order to meet program and budgetary timeline constraints.
1.1.2. Kit (kt.) and Part (ea.) quantities ordered will be determined by each delivery order.
2. Scope
2.1.1. This SOW addresses the requirement to utilize additional sources to procure wiring harnesses parts and kits. All harness specifications will be identified for each delivery order in the provided drawings.
2.1.2. In accordance with (IAW) provided drawings the Contractor shall build and deliver part lists, Government provided documents, requirements and standards, diverse wiring harnesses parts and kits to be used on F-16 aircraft.
TECHNICAL DESCRIPTION
3. Requirements
3.1.1. The contractor shall be required to build all parts to the specifications provided for each separate Delivery Order placed against this contract.
3.1.2. The harnesses range in types of material to include; shielded, non-shielded, coax, Ethernet and will range in gauge from 26 to 6. They can be made from tin, aluminum, copper etc. The range of connectors includes but is not limited to coax, triax, bnc, Ethernet, USB and spade tip. The harnesses may require that heat shrink material be applied and they may require marking with UID. The harnesses may require screws, clamps brackets and other miscellaneous components to be delivered with the harnesses to complete the kits. These miscellaneous components will be provided by the awarded contractor as required. The outer sheaths may be made of but not limited to; shielded, non-shielded, wire mesh, nylon. The material, connector, outer sheath, etc. will be specified for each individual task order.
4. Drawings
4.1.1. The Contractor shall be provided a set of drawings with each Delivery Order. These drawings will provide the set requirements for each delivery order that will be mandatory in order to be considered successful.
CONTRACTOR TASKING / REQUIREMENTS
5. Contractor Specific Requirements
5.1.1. The Contractor shall build and deliver, IAW provided drawings, requirements and standards, diverse wiring harnesses/kits/parts to be used on all current and future Blocks of F-16 aircraft. The harness components are to be fabricated per engineering drawings and documents and per F-16 harness specification 16PR145 section 3.
5.1.2. Specific requirements shall be called out in each delivery order placed against this contract if needed.
6. Quality Assurance Plan
6.1.1. The Contractor shall have a Quality Assurance Plan that complies with SAE AS9100 and AS9102. This plan, as a minimum, shall include inspection, validation, evaluation, corrective action and procedures necessary to effect quality of all products provided under this contract.
6.1.2. The plan shall allow inspection by the Government and shall be applicable to all subcontractors and members of the contractor's team, as appropriate.
6.1.3. Quality Assurance shall demonstrate that the Government’s designs are adhered to and that material used conforms to the approved designs/drawings provided by the Government. (CDRL A001)
7. Rough Order of Magnitude (ROM)
7.1.1. The Government may require an estimate/rough order of magnitude (ROM) for budgeting and planning purposes. These would be provided at no additional cost to the Government. At the request of the Government Program Manager, Engineer, Contracting Officer, Contracting Specialist or other Government Representative, each Contractor is required to provide a ROM to the Government contact at no additional cost to the Government. If a Contractor is unable to provide a ROM, the Contractor shall provide detailed rationale why this could not be accomplished. The Government may choose to issue a negative CPAR rating/comments for a Contractor that does not support ROM requests.
8. Proposals
8.1.1. For each wiring harness requirement, a set of drawings/specifications will be provided to each contractor. The contractor will use this information to prepare a proposal for the Government’s evaluation. After evaluation the Government will award a delivery order (DO) to the successful contractor whose proposal meets the technical requirements and is found to be the best value. This will most likely go the lowest price offer that is found to be technically acceptable. Each order will delineate the Governments requirements and standards for that order.
9. Delivery Requirements
9.1.1. Each solicitation for each delivery order will include Government requested/expected delivery schedule(s). The finalized delivery schedule(s) for each deliver order will be determined by the following process:
9.1.1.1. The Government intends to award orders based on LPTA, which requires the Contractors to meet the requested/expected delivery schedule(s) outlined in the each solicitation to be Technically Acceptable for each delivery order. However, Contractors may propose even if they cannot meet the requested/expected delivery schedule (i.e. delivery schedule(s) would be later). Proposals that cannot meet the required/expected delivery schedule(s) shall identify the delivery schedule(s). If the Government receives multiple proposals and one or more contractors have proposed delivery schedule(s) that cannot meet the required/expected delivery schedule, the Government may either deem the proposals Not Technically Acceptable or may revise the solicitation to allow for a trade-off between price and delivery schedule(s). The revised solicitation may be extended 7 days from the issue date to allow Contractors to update proposals. If an updated proposal is not received within that time period, the original proposal will be evaluated as a trade-off. The Government may be willing to pay a higher price for an earlier delivery; however, the Government will not be willing to pay a higher price for deliveries that are earlier than the original requested/expected delivery schedule(s). The initial solicitation/sample task RFP-FY18-0001 shall be LPTA.
9.1.2. A Status Report shall be provided 30 days ARO and each month following documenting the effort towards achieving the contract objectives and subsequent Delivery Order (D.O.) objectives. (CDRL A002)
10. Kits/Parts
10.1.1. Kits/parts ordered via this contract will be in units of 1 to 500 each/kit and will be determined by each delivery order.
11. Production
11.1.1. The Contractor shall have the capability of performing multiple (minimum of 2) delivery orders, of varying complexity, simultaneously.
12. First Article Inspection
12.1. The Government reserves the right to inspect all parts built for the First Article and will have the right to reject or require correction of any deficiencies found in the kits/parts.
12.1.1. First Article Inspection will be completed in accordance with instructions provided through each delivery order. (CDRL A003) Acceptance of first article inspection notification will be provided by the contracting office through a PCO letter.
12.1.2. In the event of rejection of any part, the Contractor will be notified in writing by the Government through the contracting office citing the specific reasons why the part was rejected. Unless otherwise specified the Contractor shall have 5 workdays to correct the rejected part and resubmit to the Government for re-inspection.
12.1.3. The Government may waive the first article requirement after receipt of proposals. This will be accomplished through a PCO letter.
13. Changes Coordination
13.1 For all possible no cost changes to the original Technical Data Package (TDP) up until production acceptance, the contractor shall coordinate these changes with the Government Program Manager (PM) and receive written approval from the PM to incorporate these changes into the First Article and Production kits/parts. Before production kits/parts acceptance, the Procurement Contracting Officer (PCO) shall issue a modification to incorporate these no cost changes into the delivery order per an updated TDP.
For all possible changes that would require a cost increase to the Government, the contractor shall send a written request to the PCO and shall not perform any of these possible changes without receiving formal written direction from the PCO. The Government reserves the right to re-compete any of these possible changes that would result in a cost increase to the Government.
14. Government Inspection and Acceptance of Parts
14.1.1. The Government reserves the right to inspect all kits/parts built and will have the right to reject or require correction of any deficiencies found in the kits/parts.
14.1.2. In the event of rejection of any part, the Contractor will be notified in writing by the Government of the specific reasons why the kit/part was rejected. Unless otherwise specified the Contractor shall have 5 workdays to correct the rejected kit/part and resubmit to the Government for re-inspection.
14.1.3. Documentation of test(s) performed on each harnesses assembly per 16PR145 shall be supplied upon request. (CDRL A003)
DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE
15. Period of Performance
15.1 The Government intends to award contract with a five year ordering period
16. Delivery Schedule
16.1 Delivery Schedule will be defined by each Delivery Order placed against this IDIQ. (CDRL A002)
SPECIAL CONSIDERATIONS
17. Property
17.1 All wiring harnesses parts and kits ordered through this contract and built by the contractor shall become the property of the US Government upon the completion of that order.
17.2 All products developed under this contract shall be considered Government property and shall have no license encumbrances.
18. Packaging
18.1 Kits/parts shall be packaged by the contractor so as to prevent damage to part features and finishes during shipment.
18.2 The harnesses parts and kits shall be labeled and properly identified per instructions provided in the drawings for proper induction into the supply system for kitting purposes.
18.3 The Government reserves the right to return parts to contractor at the contractor’s expense if it is determined that damage occurred before delivery due to negligence of the contractor.
18.4 Packaging specifications will be called out on each delivery order.
19. Kick-Off meeting award and Initial Delivery Order (IDO)
19.1 Successful offerors will be awarded a Kick-Off meeting delivery order at the time of award of the basic IDIQ contract. This order will be for participation in a post award kick-off meeting. If the IDO is awarded, it will be combined with the Kick-Off meeting for that contractor. The Kick-Off meeting will be conducted by telephone, will be convened within two weeks after award and will include key Contractor personnel and the Government Procurement Contracting Officer (PCO), Equipment Specialist (ES), Program Engineer (PE), and Program Manager (PM). The total award value of the kick-off meeting Delivery Order (DO) and relevant CLIN will be $200.00. If the IDO is also awarded, then the value will be greater.
20. CDRLs
20.1 CDRLs shall be attached to the basic contract and not to each individual delivery order. However, all CDRL requirements shall apply to all delivery orders placed.
File details come from the government source that posted it. Updated .